Bolthole Index

Golden Valley County, North Dakota

Building permits, zoning and land rules in Golden Valley County, North Dakota

45Index Score / 100
#37 of 53 in North Dakota

Unincorporated Golden Valley County, North Dakota requires a county building permit before any nonagricultural building is built or moved1. County zoning covers most unincorporated land, with exceptions for townships that retain zoning power and cities that exercise extraterritorial zoning1. Septic permits are separate: they come from the local public-health unit, Southwestern District Health Unit, before installation begins1,2.

Do you need a building permit in Golden Valley County, North Dakota?

Yes.

Yes. Golden Valley County requires a building permit before construction or moving in of any nonagricultural building or structure and whenever an existing nonagricultural building's outside dimensions change1. The application must describe the building's function, size, materials and cost and include the legal description, plat, position, yard dimensions, zoning-district compliance and proposed use1. The permit remains valid for one year and may be extended for good cause1.

North Dakota's current state building-code framework took effect in 2026, but state Community Services does not enforce it; local jurisdictions that adopt a code handle enforcement6. Golden Valley County's materials establish zoning-compliance inspection authority, not a complete construction-stage inspection schedule1. Agricultural land and buildings used for agriculture are generally outside county zoning, but road setbacks and floodplain rules still apply; the ordinance separately requires permits for nonagricultural buildings1. The state-code exemption for agricultural buildings does not cover a residence or a building used by the public7.

Who issues building permits in Golden Valley County?

Golden Valley County Planning & Zoning is the first stop for a county zoning certificate or building-permit application; the office is at the courthouse in Beach and can be reached at the phone number listed above.

Golden Valley County Planning & Zoning is the first stop for a county zoning certificate or building-permit application; the office is at the courthouse in Beach and can be reached at the phone number listed above3. The county says applications are reviewed and approved before new construction, moving a building, changing exterior dimensions, changing property use or subdividing land, and its application asks for the completed form and fees at least three weeks before proposed construction8.

The county's published fees include $75 for a single-family residential zoning certificate, $50 for a singlewide mobile home, $75 for a doublewide mobile home and $250 for a road-approach permit9. Permit and plan-review fees under the state-code framework are set by the enforcing jurisdiction, so the county zoning fees should not be assumed to cover every review another authority may require10. Ask Planning & Zoning who enforces the building code for the parcel, which trade inspections apply and whether a certificate of occupancy is required; the county materials confirm zoning-inspection authority but not a complete construction inspection schedule1.

Does Golden Valley County, North Dakota have zoning?

Golden Valley County zoning applies across unincorporated areas except townships that retain zoning power and areas where a city exercises extraterritorial zoning.

Golden Valley County zoning applies across unincorporated areas except townships that retain zoning power and areas where a city exercises extraterritorial zoning1. The published ordinance has Agricultural, Recreational, Residential, Mobile Home, Commercial, Industrial, Planned Unit Development and Floodplain Overlay districts, with the official map kept by the County Auditor1. Residential lots for single-family homes are generally one acre and 150 feet wide when onsite sewage disposal is needed, subject to exceptions for certain subdivisions; where septic is not needed, the residential minimum is 6,500 square feet1.

Residential setbacks are 25 feet in front, 10 feet at the side and 30 feet at the rear; buildings must also sit 150 feet from section lines and county-road centerlines and 250 feet from state-highway centerlines1. Accessory buildings must be smaller than the principal building, no more than 35 feet high and at least 25 feet from every lot line1. Mobile Home District lots are at least 6,000 square feet in parks or 6,500 square feet for a permitted home on a purchased lot1. Subdivisions outside municipalities and their extraterritorial jurisdictions follow Sketch Plan, Preliminary Plat and Final Plat stages, while qualifying minor subdivisions may use separate guidelines1.

Inside a city, or in a township that kept its own zoning, that municipality sets the zoning rules instead of the county; septic permits for the parcel still come from Southwestern District Health Unit, not the city or township1.

How do septic permits work in Golden Valley County?

Golden Valley County sanitary systems must be reviewed and approved by the county sanitarian or health district, and Southwestern District Health Unit is the named district authority.

Golden Valley County sanitary systems must be reviewed and approved by the county sanitarian or health district, and Southwestern District Health Unit is the named district authority1. North Dakota requires a local public-health permit before onsite wastewater work begins, while the state licenses installers2,11. The health unit's main Dickinson office and telephone are listed above12.

County materials address private septic approval on lots of at least one acre, while the application form states a 40,000-square-foot minimum for an onsite sewer system and additional state health approval thresholds13. Only 25.9% of mapped county soils lack severe limitations for a conventional septic drain field, so arrange a site evaluation before fixing the house layout14. New subdivision development must connect to an approved onsite sewage system, and privies, outhouses and cesspools are prohibited in subdivision developments1. The sanitation prohibition is limited to subdivision developments and does not establish a countywide ban for every parcel or every off-grid sanitation technology1.

Can you live in an RV or tiny home in Golden Valley County?

Golden Valley County's rules for residential or long-term RV occupancy on private land could not be confirmed, so do not treat the absence of an RV-specific answer as permission.

Golden Valley County's rules for residential or long-term RV occupancy on private land could not be confirmed, so do not treat the absence of an RV-specific answer as permission. The county ordinance addresses RV parks and temporary uses, but the state-park camping limit does not answer what is allowed on private property15. Planning & Zoning should confirm the parcel's district, whether the proposed stay is a permitted use and whether a temporary-use process applies3.

A tiny-home-specific occupancy rule also could not be confirmed. Any tiny home that is new construction, moved onto a parcel or changes the property's use enters the county zoning-certificate process3. A manufactured home used as a year-round dwelling has a county definition tied to at least 720 square feet, while mobile-home parks are conditional uses with site-plan, access, utility and layout standards1. A new manufactured home installed for residential use must use a state-licensed installer and receive inspection by a state-licensed inspector16.

Building a home in Golden Valley County: what are the steps?

Call Golden Valley County Planning & Zoning with the parcel location and confirm whether county, township or city-extraterritorial zoning applies.

  1. Call Golden Valley County Planning & Zoning with the parcel location and confirm whether county, township or city-extraterritorial zoning applies1,3.
  2. Confirm the mapped district, permitted use, minimum lot size, setbacks, legal access and driveway placement1.
  3. Prepare the zoning-certificate and building-permit material, including the building description, dimensions, materials, cost, legal description, plat, placement and yard dimensions1.
  4. Return the completed application and fees at least three weeks before proposed construction8.
  5. Secure the local public-health septic permit before onsite wastewater work begins and use a state-licensed installer2.
  6. Keep the building permit current because it is valid for one year unless extended for good cause1.
  7. Ask Planning & Zoning which code, inspections and final sign-offs apply to the project1,6.

What should you check before buying land in Golden Valley County?

Start by confirming whether county, township or city-extraterritorial zoning applies, then check the zoning map, permitted use, lot size, setbacks and legal access.

Start by confirming whether county, township or city-extraterritorial zoning applies, then check the zoning map, permitted use, lot size, setbacks and legal access1. A subdivision outside a municipality or its extraterritorial jurisdiction goes through Sketch Plan, Preliminary Plat and Final Plat stages; utility extensions or an individually reviewed onsite sewage system may also affect feasibility1. Order septic feasibility early: only 25.9% of mapped soils avoid severe limitations for a conventional drain field14. The county receives about 16 inches of annual precipitation, and severe drought has occurred in 15.5% of measured years, making a dependable water plan especially important14.

For a private well, North Dakota requires a water-appropriation permit when annual withdrawal exceeds 12.5 acre-feet; qualifying domestic and similar uses below that threshold still require reporting the works' location and capacity5. Check the floodplain overlay before siting improvements: residential buildings must be floodproofed above the FEMA-established 100-year floodplain, and unrelated temporary structures are conditional uses there1. Finally, the median property-tax bill is $1,109 per year and the effective rate is 0.9%14.

Watch-outs

  • A county permit is required for nonagricultural construction; the agricultural exemption does not remove road-setback or floodplain rules1.
  • Residential or long-term RV occupancy and tiny-home-specific occupancy remain unconfirmed; ask Golden Valley County Planning & Zoning about the parcel and proposed use before buying3.
  • Most mapped soils have severe limitations for a conventional septic drain field because only 25.9% are rated without severe limitations14.
  • The onsite-sewer materials use both one acre and 40,000 square feet, so confirm the applicable minimum with the health authority for the parcel13.

Sources

16 official pages, each quoted and re-checked · written October 9, 2026

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Golden Valley County has countywide zoning.

RuleGolden Valley CountyBillings CountySlope CountyStark CountyMcKenzie CountyBowman CountyDunn County
Building permitRequiredRequiredRequiredRequiredRequiredRequiredLimited
County zoningYesYesYesYesYesYesYes
Septic permitsSouthwestern District Health UnitSouthwestern District Health UnitND Dept. of Env. QualitySouthwestern District Health UnitLocal public health unitSouthwestern District Health UnitND DEQ

County locator

Golden Valley County in North Dakota

45
County map
Golden Valley County highlighted among the North Dakota counties · colored by Index score

How Golden Valley County scores

45 / 100 · #37 of 53 in North Dakota · six factors, land price, tax, rain and climate

Seclusion91100% ev.
Self-Sufficiency1898% ev.
Admin Boringness4590% ev.
Durability38100% ev.
Property Autonomy73100% ev.
Carry Cost7996% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$194kTypical home
0.9%Property tax
$1,242Land / acre
16"Annual rain
15.5% of yrsSevere drought
8.1 / yr (+6.7)Mid-century 100°F days
21.3 daysMid-century dry spell
1.12" (+8%)Mid-century 1-day rain
1.32×Wildfire change factor
100%Forward climate coverage
$1,944Home insurance / yr
2% / yrInsurance growth
0.94%Nonrenewal rate
single ZIP shrunk to state medianInsurance basis
46People within 30 min
46,438People within 2 hr
525Radius comparison (15 mi)
1.7People / sq mi
15.4%Federal land
70.1%Land at 15% slope or less
25.9%Soils rated "not limited" for septic (strict USDA rating)
129,713 acWorkable land screen
4%Wooded land
10.5 tonsBiomass / forest ac
43°FAvg temp

Scout Golden Valley County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Golden Valley County. Listing sites control their own results and filters.

Sell land in Golden Valley County? Be the only seller on this page →

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Golden Valley County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Not yet covered: Beach Township · Bullion Township · Delhi Township · Elk Creek Township · Garner Township · Henry Township · Lone Tree Township · Pearl Township · Saddle Butte Township · Sentinel Township · Sentinel Butte

Answers from the rulebook for Golden Valley County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Golden Valley County rules

  • Building permitRequired

    Construction, moving, or dimensional alteration of nonagricultural buildings or structures.

    • A permit is required before construction or moving in of a nonagricultural building or structure and when outside dimensions are altered.
    • The application must describe function, size, materials, cost, legal description, plat, position, yard dimensions, district compliance, and permitted use.
    • The permit is valid for one year from issuance and may be extended for good cause.
    • The County Commission determines the fee schedule.

    permit validity: 1 year (May be extended for good cause shown.)

    “A building permit is required prior to the construction or moving in of any nonagricultural building or structure and whenever the outside dimensions of an existing nonagricultural building are altered.”
  • InspectionsLimited

    County zoning-compliance inspections of land and structures.

    • The cited provision establishes inspection authority for determining compliance; it does not establish a complete construction-stage inspection schedule.
    “Make inspection of land and/or structures to determine compliance with the provisions of this ordinance.”
  • County-wide zoningPresent (with conditions)

    County zoning in unincorporated Golden Valley County.

    • The ordinance excludes townships that have not relinquished zoning power to the county.
    • The ordinance excludes incorporated cities that have not elected to exercise extraterritorial zoning.
    “These regulations shall apply to all unincorporated areas of Golden Valley County, except those townships which have not by resolution relinquished the power to enact zoning regulations to the county, and those incorporated cities which have not elected to exercise extraterritorial zoning as authorized by NDCC Section 40-47-01.1.”
  • Zoning districtsPublished

    County zoning districts and official county zoning map.

    • The ordinance lists Agricultural, Recreational, Residential, Mobile Home, Commercial, Industrial, Planned Unit Development, and Floodplain Overlay districts.
    • The official county zoning map is filed with the County Auditor.
    “Golden Valley County is hereby divided into zoning districts for purposes of controlling the use of lands and structures as authorized by Section 11-33-02 of the NDCC.”
    One more reviewed finding on this topic
    • Published (with conditions) — County zoning districts in county-regulated unincorporated areas.
      “Golden Valley County is hereby divided into zoning districts for purposes of controlling the use of lands and structures as authorized by Section 11-33-02 of the NDCC. Said districts shall be known as: 3.4 Agricultural District 3.5 Recreational District 3.6 Residential District 3.7 Mobile Home District 3.8 Commercial District 3.9 Industrial District 3.10 Planned Unit Developments 3.11 Floodplain Overlay District”
  • Minimum dwelling sizeSpecified

    Manufactured/mobile homes treated as year-round dwelling units.

    • The 720-square-foot threshold appears in the mobile-home definition and is not a general minimum size for every dwelling type.

    minimum floor area for mobile-home definition: >= 720 square feet (Recreational travel trailers are excluded from the definition.)

    “Mobile Home (now manufactured home): A factory built structure, transportable in one or more sections and has at least seven hundred twenty (720) or more square feet and is designed as a year-round dwelling unit”
  • Minimum lot sizeDistrict specific (with conditions)

    Residential District lots where soil-absorption sewage systems or septic tanks are not needed.

    • Residential building setbacks are 25 feet front, 10 feet side, and 30 feet rear.
    • This provision applies where soil absorption sewage systems (septic tanks) are not needed.

    minimum lot area: 6500 square feet (Where septic tanks are not needed) · front setback: 25 feet · side setback: 10 feet · rear setback: 30 feet

    “Residential Districts shall have a minimum lot size of six thousand five hundred (6,500) square feet and shall have residential building front lot setbacks of not less than twenty-five (25) feet, side lot setbacks of not less than ten (10) feet, and rear lot setbacks of not less than thirty (30) feet from the lot line where soil absorption sewage systems (septic tanks) are not needed.”
    3 more reviewed findings on this topic
    • Specified — Single-family dwelling units in the Golden Valley County Residential District, except dwellings in subdivisions existing when the zoning code was adopted or developed under Article V subdivision regulations.
      “The minimum lot size for single family dwelling units (excepting dwellings constructed in subdivisions existing at the time of the adoption of this code or developed pursuant to the provisions of Article V, Subdivision Regulations) shall be one acre (forty-three thousand five hundred sixty [43,560] square feet) provided that the site meets the minimum standards for onsite sewage disposal by North Dakota State Health Department. The minimum lot width shall be one hundred fifty (150) feet.”
    • District specific (with conditions) — Mobile Home District lots in Golden Valley County.
      “Mobile Home Districts shall have minimum lot sizes of six thousand (6,000) square feet in mobile home parks, with lot setbacks of not less than seven and one half (7.5) feet and no more than seven (7) mobile homes per acre. For permitted mobile homes on purchased lots, lots shall be a minimum of six thousand five hundred (6,500) square feet, and the mobile home shall have front, side, and rear lot setbacks of thirty (30), ten (10), and thirty (30) feet respectively.”
    • Specified — Lots in the Golden Valley County Industrial District.
      “The minimum lot area for the industrial district shall be two (2) acres. The minimum lot width shall be one thousand two hundred fifty (1,250) feet.”
  • SetbacksSpecified

    Building and structure setbacks under Golden Valley County zoning.

    • Highway and section-line setbacks are 150 feet from county roads and section lines and 250 feet from state highways.
    • District-specific setbacks also apply.
    • Residential, mobile-home, agricultural, recreation, and industrial district setbacks differ.

    county-road and section-line setback: >= 150 feet · state-highway setback: >= 250 feet · residential front setback: >= 25 feet · residential side setback: >= 10 feet · residential rear setback: >= 30 feet

    “The minimum setback for buildings from all section lines and the center line of county road shall be one hundred fifty (150) feet. [...] The minimum setback from the center of state highways shall be two hundred fifty (250) feet.”
  • Building heightSpecified

    Accessory buildings and structures in county-regulated unincorporated areas.

    • Accessory buildings must be smaller than the principal building and at least 25 feet from all lot lines.
    • Airport clear-zone and Federal Aviation Administration height limitations may also apply.

    accessory-building height: <= 35 feet

    “Accessory buildings shall be smaller than the principal building and shall be limited to thirty-five (35) feet in height and be located at least twenty-five (25) feet from all lot lines.”
    One more reviewed finding on this topic
    • Specified — Accessory buildings and other structures governed by the county zoning ordinance.
      “Accessory buildings shall be smaller than the principal building and shall be limited to thirty-five (35) feet in height”
  • Manufactured homesLimited

    Mobile-home parks in areas subject to the Golden Valley County zoning ordinance.

    • Mobile-home parks are conditionally permitted.
    • A site plan is required showing streets, utilities, parking, driveways, walkways, blocks, lots, playground and park area, and accessory buildings.
    • The park must contain at least five acres in unincorporated areas and one acre in incorporated areas of the county.
    • The maximum density is seven mobile homes per gross acre.
    • County Commission approval is required for access to county roads.
    • Lots and streets must remain accessible to emergency vehicles; streets must be designed to control traffic movement; each lot must have a reflective address sign.
    • Each mobile home must be on a lot at least 50 feet wide and 6,000 square feet, with 7.5-foot lot-line setbacks.
    • At least 12 percent of the park area must be open space and recreational facilities.
    • Each unit must be placed on a firm anchoring foundation, have underground utility hookups, and the applicant must accept responsibility for road construction, maintenance and snow removal.

    minimum park area, unincorporated: >= 5 acres · minimum park area, incorporated: >= 1 acre · maximum mobile-home density: <= 7 units per gross acre · minimum mobile-home lot width: >= 50 feet · minimum mobile-home lot area: >= 6000 square feet · lot-line setback: >= 7.5 feet · minimum open-space and recreation area: >= 12 percent

    “3.7.3 Conditionally Permitted Uses 1) Mobile home parks. The applicant shall meet the following requirements for obtaining a permit for construction and operation of a mobile home park: [...] The park shall contain a minimum of five (5) acres of land in unincorporated areas and one (1) acre of land in incorporated areas of the county. [...] The maximum number of mobile homes in a park shall be seven (7) units per gross acre.”
  • Who permits septicMixed (with conditions)

    On-site sewage systems in county subdivisions.

    • Private septic systems may be approved by the county sanitarian or Southwest Health District.
    • All sanitary systems must be reviewed and approved by the county sanitarian or Health District.
    “All sanitary systems shall be reviewed and approved by county sanitarian or Health District.”
  • Septic permitLimited

    Private septic systems in county subdivisions.

    • Approval is by the county sanitarian or Southwest Health District.
    • Private septic systems are addressed on lots of at least one acre.
    • The application form states a 40,000-square-foot minimum lot size for an onsite sewer system and additional ND Department of Health approval thresholds.

    minimum lot size for private septic approval: >= 1 acre · minimum lot size on application form: 40000 square feet

    “APPLICATION FOR SEWAGE & WATER FACILITIES”
  • Off-grid sanitationProhibited

    Privies, outhouses, and cesspools in subdivision developments.

    • The prohibition is expressly limited to subdivision developments; it does not establish a countywide prohibition for every parcel.
    “The construction and use of privies, outhouses, and cesspools in subdivision developments in the county is prohibited.”
    2 more reviewed findings on this topic
    • Limited — Privies, outhouses, and cesspools in county subdivision developments.
      “The construction and use of privies, outhouses, and cesspools in subdivision developments in the county is prohibited.”
    • Prohibited — Privies, outhouses, and cesspools in new subdivision developments in county-regulated areas.
      “To protect the public health, to control water pollution and to reduce nuisance and odor, all new subdivision development within the county shall be connected to an approved on-site sewage system. The construction and use of privies, outhouses, and cesspools in subdivision developments in the county is prohibited.”
  • Mandatory utility hookupConditional

    Subdivision utility service in unincorporated county areas.

    • All subdivisions must provide sanitary sewers to each lot, but an on-site sewage system may be allowed on individual case review.
    • Sanitary sewer must extend to the subdivision boundary unless the Planning and Zoning Commission finds that impractical.
    • Watermains must extend to the subdivision boundary unless deemed impractical.
    “All subdivisions shall be provided with sanitary sewers to each lot. On an individual case review, an on-site sewage system may be allowed.”
  • Agricultural exemptionConditional

    Agricultural land and buildings used for agricultural purposes.

    • Agricultural uses and buildings are generally excepted from zoning regulations, but the exception does not apply to setbacks from roads or floodplain regulations.
    • The ordinance separately requires permits for nonagricultural buildings and structures.
    “These regulations shall not apply to the land and buildings of agricultural uses, as herein defined, except for setbacks from roads and floodplain regulations.”
    One more reviewed finding on this topic
    • Conditional — Land and buildings used for agricultural uses under the county zoning ordinance.
      “These regulations shall not apply to the land and buildings of agricultural uses, as herein defined, except for setbacks from roads and floodplain regulations.”
  • Subdividing landRegulated (with conditions)

    Subdivision of land in Golden Valley County.

    • Subdivision applications require zoning-certificate review.
    • Residential lot dimensions are subject to Sections 3.6.4 and 3.6.5.
    • All lots must front a public street; subdivision improvements require Planning and Zoning Commission approval.
    “Before installation of improvements in any subdivision, the Planning and Zoning Commission shall make a determination for improvements required, based on a schedule of improvements including the standards and class of construction.”
    One more reviewed finding on this topic
    • Regulated (with conditions) — Subdivisions outside municipalities and their extraterritorial jurisdictions.
      “All subdivisions made within the County and not located in any municipality or its extra-territorial jurisdiction shall be subject to and shall conform to the three-step requirements: Sketch Plan, Preliminary Plat and Final Plat of this chapter.”
  • Driveway accessLimited

    Highway access and road-approach permits in Golden Valley County zoning areas.

    • Highway access points are limited to four per mile per side.
    • Additional access points may be provided via frontage roads if the landowner dedicates a suitable right-of-way by deed or easement.
    • The county application lists a $250 road approach permit fee.

    access points: <= 4 per mile per side of highway (additional access via frontage roads with suitable right-of-way)

    “The points of access shall be limited to four (4) per mile per side of the highway. Additional access points may be provided via frontage roads where the land owner shall dedicate a suitable right-of-way by deed or easement.”
  • Building in a floodplainLimited

    Development in the FEMA- or state-mapped floodplain overlay district.

    • The floodplain district overlays all zoning districts.
    • Residential buildings must be floodproofed above the 100-year floodplain established by FEMA.
    • Temporary buildings and structures not related to flood control or farming are conditional uses.

    residential floodproofing level: above the 100-year floodplain (FEMA-established floodplain)

    “The areas delineated as floodplain shall be an overlay for all zoning districts.”
  • Permit feesPublished (with conditions)

    Zoning-certificate and related county permit fees listed in the county FAQ.

    • The FAQ is a 2021 planning-and-zoning document; the ordinance states that building-permit fees are determined by the County Commission.
    • The listed road-approach fee is $250.

    single-family residential zoning certificate: 75 USD · multi-family residential zoning certificate: 100 USD · singlewide mobile-home zoning certificate: 50 USD · doublewide mobile-home zoning certificate: 75 USD · commercial building zoning certificate: 100 USD · industrial building zoning certificate: 150 USD · road approach permit: 250 USD

    “Single-Family Residential ...................... $75.00”
  • Permit processPublished (with conditions)

    Zoning certificates and building permits for county-regulated areas.

    • Zoning certificates must be reviewed and approved before new construction, moving a building, altering outside dimensions, changing use, or subdividing.
    • The county application instructs applicants to return the completed application and fees at least three weeks before proposed construction.
    • Building-permit applications require building description, size, materials, cost, legal description, plat, location, yard dimensions, and district compliance.

    minimum application lead time: >= 3 weeks (county zoning-certificate application)

    “Applications for Zoning Certificates are required, reviewed, and approved by the Planning & Zoning Director, Planning & Zoning Board, and the Board of County Commissioners before: beginning any new construction, moving a building or structure, whenever the outside dimensions of an existing building are altered changing the use of the property, or subdividing land.”
    One more reviewed finding on this topic
    • Published (with conditions) — County zoning certificates, building permits, conditional-use permits, and temporary-use permits.
      “Applications for Zoning Certificates are required, reviewed, and approved by the Planning & Zoning Director, Planning & Zoning Board, and the Board of County Commissioners before:”

North Dakota rules that apply here

  • Owner-builder exemptionConditional

    An individual who builds that individual’s own single-family residence and seeks the North Dakota builder property-tax exemption.

    • The exemption is discretionary and requires the governing city or county to pass a resolution allowing it.
    • For property within a city, the city governing body has jurisdiction; for property outside an incorporated city, the county has jurisdiction.
    • The property must remain owned by the builder and unoccupied.
    • The exemption applies for the taxable year in which construction began and the next two taxable years.
    • The governing body may impose conditions, including limits on the exemption period and dollar value.
    • A builder may receive the exemption for no more than ten properties in a taxable year within each jurisdiction that approved the exemption.
    • General taxes and installments of special assessments may not be delinquent.
    • This is a property-tax exemption, not a building-permit or building-inspection exemption.

    exemption period: taxable year in which construction began and next two taxable years · maximum properties per builder per jurisdiction per taxable year: 10 properties

    “Whether or not to offer the exemption is at the discretion of the governing body. [...] “Builder” includes an individual who builds that individual’s own residence.”
  • Building code adoptedPartial

    North Dakota's state building code and its adoption and enforcement by cities, townships, and counties statewide; state and local government buildings and schools are also addressed by the administrative code.

    • The state building code is administered and updated by North Dakota Commerce, but enforcement is the responsibility of jurisdictions that elect to adopt and enforce building codes.
    • A city, county, or township that elects to adopt and enforce a building code must adopt and enforce the State Building Code.
    • Cities, townships, and counties may amend the State Building Code to conform to local needs.
    • Fully chartered home rule cities may adopt something other than the State Building Code; the official Commerce page states that, at present, all jurisdictions enforcing a building code have adopted the same individual codes comprising the State Building Code.
    • The State Building Code consists of the International Building Code, International Residential Code, International Mechanical Code, and International Fuel Gas Code; Commerce also states that the 2024 updates and proposed amendments were adopted on September 11, 2025 and that the new State Building Code went into effect January 1, 2026.
    • The state statute separately exempts buildings that are neither heated nor cooled, certain low-energy-use buildings, qualifying restored or reconstructed historic buildings, and agricultural buildings unless used for human habitation or by the public.
    • The administrative code states that its chapter applies to cities, townships, and counties that elect to adopt and enforce building codes within their jurisdictional boundaries, and to all state and local government buildings and public and private schools.

    new state building code effective date: 2026-01-01 · state code components: IBC, IRC, IMC, and IFGC

    “If a city, county, or township elects to adopt and enforce building codes, it must adopt and enforce the State Building Code.”
    3 more reviewed findings on this topic
    • Adopted (with conditions) — Buildings in North Dakota jurisdictions that elect to adopt and enforce building codes, including Golden Valley County if it enforces its adopted code.
      “On Sept. 11, 2025 eligible cities and counties, along with eligible members of the Building Code Advisory Committee, adopted the 2024 updates to the IBC, IRC, IMC, and IFGC and the proposed amendments. The 2024 versions of the International Energy Conservation Code and the International Existing Building Code and proposed amendments to these codes were also adopted. The new North Dakota State Building Code will go into effect Jan. 1, 2026.”
    • Adopted (with conditions) — The North Dakota State Building Code, consisting of the IBC, IRC, IMC, and IFGC, with the 2024 updates and stated amendments effective statewide as the state code framework.
      “adopted the 2024 updates to the IBC, IRC, IMC, and IFGC and the proposed amendments.”
    • Adopted — The North Dakota State Building Code, including residential construction covered by the state residential code.
      “The new North Dakota State Building Code will go into effect Jan. 1, 2026.”
  • Lot coverageDistrict specific (with conditions)

    Local city zoning regulations governing the percentage of a lot that may be occupied.

    • The actual lot-coverage percentage is established by the applicable local zoning regulation.
    • The authority is permissive and applies to city zoning regulations.
    • The regulation is subject to chapter 54-21.3.
    “the percentage of lot that may be occupied”
  • Septic inspectionRequired

    Installation of an onsite wastewater treatment system anywhere in North Dakota

    • The inspection is conducted by the permitting authority or its authorized representative.
    • The inspection must occur within one business day after the request for inspection.
    • Construction, alteration, repair, or extension requires a permit before work begins; regular system maintenance does not require a permit.
    • The permitting authority is a local public health unit, other political subdivision, or designee.

    inspection deadline: 1 business day (After receiving the request for inspection) · permit validity: <= 12 months (From date of issuance)

    “Inspection of the installation of a system must be conducted by the permitting authority or an authorized representative of the permitting authority in accordance with paragraph 3 of subdivision c of subsection 2 of North Dakota Century Code section 23-35-02, which requires the inspection to be conducted within one business day of receiving the request for inspection.”
  • Well permitLimited

    Private water-supply wells statewide in North Dakota.

    • A water appropriation permit from the North Dakota Department of Water Resources is required when annual withdrawal exceeds 12.5 acre-feet.
    • A permit is not needed for wells drawing less than 12.5 acre-feet per year, according to the official private-well guide.
    • For domestic, livestock, fish and wildlife, and recreational uses below 12.5 acre-feet per year, the location and capacity of constructed works must be reported to the Department of Water Resources.
    • Anyone hired to construct, install, or repair a well, pump, or pitless unit must be licensed; individuals may install or repair wells on their own property without a license.

    annual water withdrawal threshold: > 12.5 acre-feet per year (Domestic, livestock, fish and wildlife, and recreational uses below this threshold do not require a water appropriation permit but must be reported.) · annual water withdrawal threshold: > 4073137 gallons per year (Equivalent threshold stated by the Department of Water Resources.)

    “Domestic, municipal, public, livestock, fish and wildlife, and recreational water use exceeding 12.5 acre-feet (4,073,137 gallons or 96,979 barrels) per year.”
  • Short-term rentalsLimited

    Transient lodging rentals held out to the public for a charge in North Dakota.

    • A lodging license applies to buildings or structures held out to the public where sleeping accommodations are furnished to transient guests for a charge.
    • The lodging license does not apply to a single structure with five or fewer guest rooms and ten or fewer total occupants.
    • The lodging license also does not apply to a series or group of buildings or structures containing five or fewer guest rooms and ten or fewer total occupants.
    • License applications must be submitted at least 30 days before beginning construction or acquiring new ownership; new construction, renovation, or remodeling also requires the Section 3 Plan Review Checklist; after payment, review may take up to 30 calendar days.

    guest-room exemption threshold: <= 5 guest rooms or fewer (Only when total occupants are ten or fewer.) · occupant exemption threshold: <= 10 occupants or fewer (Only when the structure has five or fewer guest rooms.)

    “The lodging license does not apply to: Single structures with five or fewer guest rooms and ten or fewer total occupants.”
  • Campground & park staysLimited

    Establishment, operation, modification, or enlargement of recreational vehicle parks and campgrounds in North Dakota.

    • A Department of Health and Human Services license is required before a person establishes, maintains, changes use, mixes use, or enlarges a recreational vehicle park or campground.
    • The written license application must be on department forms, be accompanied by the required fee, identify the physical address and type of proposed facility, include local-official approval of compliance with applicable local zoning laws, ordinances, or regulations, and state the proposed water supply, sewerage method, and garbage-disposal method.
    • For new construction or alteration or enlargement, a complete scaled plan and specifications must be submitted to the department for approval.
    • A tent, recreational vehicle, or attachment must be at least ten feet from another tent, recreational vehicle, or part thereof; its location may not create a hazard or restrict emergency services.
    • State- or political-subdivision-owned parks and campgrounds receive a waiver of the department license and inspection requirement under N.D.C.C. 23-10-03(4).
    • Counties may separately regulate the use, condition of use, or occupancy of land under N.D.C.C. ch. 11-33; local zoning compliance is an express component of the state license application.

    minimum separation between tents, recreational vehicles, or attachments: >= 10 feet (Must not create a hazard or restrict emergency vehicles and personnel from performing necessary services.) · annual license fee for 3-10 lots: 110 USD · annual license fee for 11-25 lots: 160 USD · annual license fee for 26-50 lots: 210 USD · annual license fee for 51-100 lots: 265 USD · annual license fee for 101-150 lots: 325 USD · annual license fee for 151-200 lots: 385 USD · annual license fee for 201-250 lots: 445 USD · annual license fee for more than 250 lots: 505 USD · initial-license administration fee: 100 USD (In addition to the annual license fee and, if a plan review application is required, 50 percent of the annual license fee.) · reinspection fee: per 100 USD (For each reinspection required due to failure to correct repeat violations and each subsequent reinspection due to a notice of violation.)

    “A person may not establish [...] a recreational vehicle park, or campground in this state without first obtaining a license from the department.”
    One more reviewed finding on this topic
  • county zoning authorityGeneral

    North Dakota counties adopting zoning regulations for land and buildings within the county, including unincorporated areas.

    • The authority is exercised by the board of county commissioners.
    • Regulation is subject to North Dakota Century Code chapter 54-21.3.
    • The authority covers the location and use of buildings and structures and the use, condition of use, or occupancy of lands for residence, recreation, and other purposes.
    • County zoning regulations must be made in accordance with a comprehensive plan.
    • A county may divide all or any parts of the county into districts, and regulations must be uniform within each district but may differ between districts.
    • County zoning regulations must account for the statutory limitations governing farming, ranching, and animal feeding operations in section 11-33-02.1.
    • The board must state the grounds for approving or disapproving zoning amendments or variances, and written findings must be included in the records.
    • The board must establish zoning requirements for solid waste disposal and incineration facilities before July 1, 1994.
    • The board may impose tipping or other fees on solid waste management and incineration facilities, but may not impose a fee under this section on an energy conversion facility or coal mining operation that disposes of its waste onsite.
    • The board may establish institutional controls addressing environmental concerns with the department of environmental quality under section 23.1-10-16.
    “For the purpose of promoting health, safety, morals, public convenience, general prosperity, and public welfare, the board of county commissioners of any county may regulate and restrict within the county, subject to chapter 54-21.3, the location and the use of buildings and structures and the use, condition of use, or occupancy of lands for residence, recreation, and other purposes.”
    One more reviewed finding on this topic
    • General — North Dakota county boards of commissioners adopting zoning regulations, including regulation of unincorporated county land.
      “the board of county commissioners of any county may regulate and restrict within the county”
  • county building authorityGeneral

    County authority to administer and enforce the state building code, including the residential code, and to provide for building permits for buildings or structures subject to county zoning in unincorporated areas of North Dakota.

    • A county that elects to administer and enforce a building code must adopt and enforce the state building code; it may amend that code to conform to local needs.
    • A county may administer and enforce the state building code only in areas where a city or township does not administer it. A city or township may relinquish that authority to its county under N.D.C.C. § 54-40.5-03; local governments may also agree to joint administration and enforcement or contract for private enforcement.
    • County permit authority under N.D.C.C. § 11-33-18 applies to a building or structure otherwise subject to the County Zoning chapter.
    • If the county provides for permits, it must require the applicant to state whether the structure is reasonably anticipated to have a significant transportation-system impact. A structure has such impact if it will average at least twenty-five motor vehicles per day during one year with gross weight exceeding sixty thousand pounds [27215.54 kilograms].
    • For a structure with significant transportation-system impact, the county must notify the director of the department of transportation and allow an opportunity to comment; director approval is not required.
    • The county may establish and collect reasonable permit fees, which must be credited to the county general fund.
    • A county-adopted building code may not require fire sprinklers in a single-family dwelling or a residential building containing no more than two dwelling units.

    significant transportation-system impact threshold: >= 25 motor vehicles per day (Over a period of one year; vehicles must have gross weight exceeding sixty thousand pounds [27215.54 kilograms].) · fire-sprinkler requirement: false (A county building code may not require sprinklers in a single-family dwelling or residential building with no more than two dwelling units.)

    “The governing body of a city, township, or county that elects to administer and enforce a building code shall adopt and enforce the state building code. However, the state building code may be amended by cities, townships, and counties to conform to local needs.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Certificate of occupancy — Certificate-of-occupancy requirements.
  • Living in an RV — Residential or long-term RV occupancy on private land.
  • Camping on your land — Temporary camping on private land.
  • Tiny homes — Tiny-home occupancy.
  • Accessory dwellings — Accessory dwelling units.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Golden Valley County, North Dakota

Is Golden Valley County a good place to live off-grid or homestead?

Golden Valley County scores 45/100 on the Bolthole Index, a marginal county profile. Its strengths: deep seclusion — about 46 people within a 30-minute drive and manageable long-term carry cost. Watch-outs: thin water margin (16″/yr rainfall) and elevated current hazard exposure.

How much does land cost in Golden Valley County, North Dakota?

Land in Golden Valley County runs about $1,242 per acre, based on the latest county data.

What is the water situation in Golden Valley County?

Golden Valley County gets about 16" of rain a year, with severe drought in roughly 15.5% of years.

How remote is Golden Valley County?

A representative private-land location has about 46 people within a 30-minute drive and 46,438 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Golden Valley compares in North Dakota