Unincorporated Eddy County, North Dakota requires a permit before construction or excavation for a new rural residential structure1. The county administers zoning, except where a township has lawfully enacted its own regulations, while a local public health permit is required before onsite wastewater work begins2,3. Agricultural buildings have a limited permit exemption, but RV living and tiny-home occupancy remain questions for county officials1,4.
Do you need a building permit in Eddy County, North Dakota?
Yes.
Yes. A person planning a new residential structure in unincorporated Eddy County must obtain a permit from the County Tax Director before construction or excavation begins1. The requirement covers new rural residential buildings or structures added to taxable property and the placement or relocation of mobile and manufactured homes1. Replacing roofs, siding, windows or decks does not require this county building permit, and agland buildings are exempt1. The residential application shows a $10 fee but also points to the county's resolution of fees and schedules, so confirm the current amount for the particular project1. North Dakota's updated state building code took effect January 1, 2026, but we could not confirm which code Eddy County currently administers or what local inspections apply4,7.
Who handles Eddy County building permits, and how do you reach them?
The Eddy County Tax Director administers the zoning code and assists the Zoning Commission and County Commission on zoning and development matters.
The Eddy County Tax Director administers the zoning code and assists the Zoning Commission and County Commission on zoning and development matters1. The county's Zoning Commission contact is 701-947-2434 at 524 Central Avenue, New Rockford, North Dakota 583564. Start there to confirm the parcel's zoning district, get the residential structure application and learn whether the project needs additional review1,4. A complete application includes the legal description, a lot map, structure type and materials, occupied lot area, probable construction cost, and any additional plans or specifications requested by the Tax Director1. The permit can be issued only when the proposal conforms to the applicable zoning and building provisions1. We could not confirm a published inspection schedule or certificate-of-occupancy requirement; ask the Zoning Commission what inspections and closeout documents apply before work starts4.
Does Eddy County have zoning?
Yes.
Yes. Eddy County administers zoning in unincorporated territory through the County Tax Director and Zoning Commission, while municipal and township jurisdictions may have separate authority1. The county ordinance does not affect property in a township that has lawfully enacted its own regulations unless the township relinquishes those powers to the county, so confirm the township first2. The county maintains a zoning map and records for Residential, Agricultural, Recreational, Commercial, Industrial and Vacant categories1. Buildings and structures near county and township rights-of-way must be set back at least 100 feet, including from county-road rights-of-way1. Do not treat that road setback as the only siting rule: we could not confirm current numeric limits for minimum lot size, lot coverage or building height, so have the Zoning Commission check the district and parcel before designing the site4. County-road access also requires a County Commission permit, although farm driveways and field access points are exempt from that access provision1. The Road Department's New Rockford shop is at 104 2nd Ave SE and can be reached at (701) 947-55188.
How do septic permits work in Eddy County?
An onsite wastewater installer in Eddy County needs a North Dakota Department of Environmental Quality license and a permit from the local public health unit before beginning work.
An onsite wastewater installer in Eddy County needs a North Dakota Department of Environmental Quality license and a permit from the local public health unit before beginning work3. Lake Region District Health Unit's published procedure expressly covers Eddy County and directs applicants to complete the onsite sewage treatment system application with a legal description, contact information, a site drawing and payment9. After the application and payment arrive, the health unit grants only a preliminary permit; its process calls for site review and installer design approval before installation proceeds9. Contact Environmental Health at 701.662.7039 or crberg@nd.gov, 524 4th Ave. NE Unit 9, Devils Lake, ND 58301-24909. Site evaluation matters because about 31.4% of Eddy County soils are rated without severe limitations for a conventional septic drain field10. We could not confirm whether every installation receives an inspection or which off-grid sanitation alternatives are allowed; ask Environmental Health before choosing a system9.
Can you live in an RV or tiny home on your land in Eddy County?
We could not confirm whether unincorporated Eddy County allows or prohibits full-time RV occupancy on private land; ask the Eddy County Zoning Commission before arranging utilities or moving onto the parcel.
We could not confirm whether unincorporated Eddy County allows or prohibits full-time RV occupancy on private land; ask the Eddy County Zoning Commission before arranging utilities or moving onto the parcel4. Ask separately whether an RV may be occupied temporarily during construction because the county's residential permit materials do not answer that question4. We also could not confirm a tiny-home occupancy rule or a countywide minimum dwelling size2,4. A tiny home that functions as a new residence should not be assumed exempt: Eddy County's permit requirement covers new rural residential structures, and permits are issued only when the proposal conforms to zoning and building provisions1. A new manufactured home has an additional state installation path requiring a licensed installer and licensed inspector11. No owner-builder exemption from the county permit requirement was confirmed, so self-performing the work should not be treated as an exemption5.
How do you build a home in Eddy County, step by step?
Confirm that the parcel is under Eddy County zoning rather than a municipality or township with separate authority.
- Confirm that the parcel is under Eddy County zoning rather than a municipality or township with separate authority1.
- Call the Zoning Commission at 701-947-2434 to confirm the district, allowed residential use and required application1,4.
- Start the Lake Region District Health Unit septic application and site review before construction; the local permit is required before onsite wastewater work begins3,9.
- Prepare the legal description, lot map, structure details, occupied lot area, probable building cost, and any additional plans requested by the Tax Director1.
- If access connects to a county road, obtain the County Commission access permit and coordinate with the Road Department1,8.
- Submit the residential permit, confirm the applicable fee and wait for approval before construction or excavation1.
- Ask which inspections and final occupancy documents apply because no published county schedule was confirmed4.
What should you check before buying land in Eddy County?
Start with jurisdiction and the zoning map because municipal or township authority may replace the county process on some parcels.
Start with jurisdiction and the zoning map because municipal or township authority may replace the county process on some parcels1. Confirm legal access and whether an existing approach has the required County Commission approval; farm driveways and field access points have a specific exemption, but a residential entrance should not be assumed exempt1. Screen the parcel for flood risk with Eddy County Flood Plain Management at 524 Central Ave, New Rockford, phone (701)-302-8279; the office says work in a special flood hazard area is subject to flood-damage and safety requirements12. Evaluate septic feasibility early because only about 31.4% of county soils avoid severe conventional-drain-field limitations10. For a private well, state water-appropriation permitting begins above 12.5 acre-feet per year, while qualifying lower-use wells must still be reported6. Budget for average annual precipitation of about 19.3 inches and carrying costs near a 0.9% effective property-tax rate with a median annual bill of about $1,02710.
Watch-outs
- A residential permit is required before construction or excavation begins, not after site work is underway1.
- The 100-foot rule is measured from county and township rights-of-way, so verify the right-of-way rather than measuring from the traveled road edge1.
- A preliminary septic permit is not approval to install; Lake Region District Health Unit requires further site and design steps first9.
- RV living, tiny-home occupancy and a minimum dwelling size remain unconfirmed; ask the Zoning Commission for a parcel-specific answer4.
- County zoning does not settle rules in every municipality or township, which may exercise separate authority1.
Sources
12 official pages, each quoted and re-checked · written October 10, 2026
- Eddy County Planning and Zoning / Residential Permit Application
- Eddy County Zoning Ordinance
- On-Site Wastewater Treatment Systems
- Eddy County Zoning Commission (eddycountynd.org)
- Property Tax Exemption for Builders of Certain New Single Family Residential Properties (2026 county census)
- Water Appropriation Permits (North Dakota statewide rule)
- North Dakota Century Code Chapter 54-21.3, State Building Code (North Dakota statewide rule)
- Eddy County Road Department (eddycountynd.org)
- Lake Region District Health Unit Environmental Health Division (0bf4856a-7a65-4813-b674-23a67f3de7ab.filesusr.com)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Manufactured Home Installation Program (North Dakota statewide rule)
- Eddy County Flood Plain Management (eddycountynd.org)
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Eddy County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.