Dickey County, North Dakota
Fullerton is a city in Dickey County, North Dakota. Septic permits inside Fullerton come from the county and state together. 8 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Dickey County page.
Fullerton does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
An owner installing an onsite wastewater treatment system on the owner's own premises inside Fullerton city limits.
“An individual installing a system on the individual's premises is exempt from the requirements of this section. The individual shall obtain a permit for the system in accordance with section 33.1-21-01-06.”
Onsite wastewater treatment systems, commonly called septic systems, inside Fullerton city limits.
“Except as otherwise provided by law, the department has the exclusive authority to adopt rules regarding licensing, permitting, and inspections of onsite wastewater treatment systems.”
Construction, alteration, repair, or extension of an onsite wastewater treatment system inside Fullerton city limits.
permit validity: <= 12 months (From date of issuance.) · engineering-review threshold: >= 2500 gallons per day (Plans/specifications and Department of Environmental Quality approval are required before construction begins.)
“A person may not construct, alter, repair, or extend any system without first obtaining a permit from the permitting authority. Regular system maintenance does not require a permit.”
Use of an onsite wastewater treatment system instead of public sewer inside Fullerton city limits.
minimum lot size for new onsite system: >= 1 acre
“The minimum lot size in which a new system may be installed is one acre [.405 hectares]. [...] Water carried from bathrooms, kitchens, laundry fixtures, and other household plumbing must pass through a septic tank or higher level of treatment prior to its discharge into the soil. If underground dispersal for treatment is not feasible, the permitting authority may review alternative methods of collection and disposal.”
A proposed onsite wastewater treatment system inside Fullerton city limits where public sewer availability is relevant to the septic permit.
public sewer distance from property line: <= 200 feet (The permitting authority may deny the onsite-system permit unless the sewer authority provides written documentation of denial of connection.)
“The permitting authority may deny a permit for the construction of a system if a public sewer system is available within two hundred feet [60.96 meters] of the property line unless written documentation indicates denial of connection from the sewer authority.”
Buildings used for agricultural purposes inside Fullerton city limits to the extent the state building-code chapter applies.
“Any building used for agricultural purposes, unless a place of human habitation or for use by the public, is exempt from this chapter.”
Onsite wastewater treatment-system permits inside Fullerton city limits.
“The permit must be issued by the permitting authority within the jurisdictional limits where the work is being done. The fee for the permit must be set by the permitting authority.”
Process for an onsite wastewater treatment-system permit inside Fullerton city limits.
permit validity: <= 12 months (From date of issuance.)
“The permit must be issued by the permitting authority within the jurisdictional limits where the work is being done. [...] Permit approval, modification, denial, or revocation must be done in writing. Permit conditions that vary from the provisions of this chapter must be related to a request for variance in accordance with section 33.1-21-01-15.”
We looked and could not find an official answer yet. Silence is not permission; ask Fullerton or Dickey County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Fullerton publishes no rule on the point, not that none exists. Dickey County’s page lists the county offices to call.