Hertford County, North Carolina
Town of Como is a town in Hertford County, North Carolina. Septic permits inside Town of Como come from the state health agency. 9 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Hertford County page.
Town of Como does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Construction, reconstruction, alteration, repair, movement, removal, or demolition of a building or structure inside Como town limits.
general no-permit cost threshold: <= 40000 USD (Only qualifying work in a single-family residence, farm building, or commercial building under G.S. 160D-1110(c); listed exceptions still require a permit.)
“Except as provided in subsection (c) of this section, and subsection (h) of G.S. 160D-1110.1, no person shall commence or proceed with any of the following without first securing all permits required by the North Carolina State Building Code and any other State or local laws applicable to any of the following activities:”
Construction inside Como town limits subject to North Carolina building-permit law.
“A building permit shall be in writing and shall contain a provision that the work done shall comply with the North Carolina State Building Code and all other applicable State and local laws.”
Work inside Como town limits done under a building permit.
“At the conclusion of all work done under a building permit, the appropriate inspector shall make a final inspection, and, if the completed work complies with all applicable State and local laws and with the terms of the permit, the inspector shall issue a certificate of compliance.”
New buildings, additions, enlargements, altered buildings, and moved buildings inside Como town limits.
“Except as provided by subsection (b) of this section, no new building or part thereof may be occupied, no addition or enlargement of an existing building may be occupied, and no existing building that has been altered or moved may be occupied, until the inspection department has issued a certificate of compliance.”
On-site wastewater systems inside Como town limits where the site is not served by an approved wastewater system.
“The local health department shall issue a construction authorization authorizing work to proceed and the installation or repair of a wastewater system when it has determined after a field investigation that the system can be installed and operated in compliance with this Article and rules adopted pursuant to this Article.”
Installation, construction, or repair of an on-site wastewater system inside Como town limits.
“No person shall commence or assist in the installation, construction, or repair of a wastewater system unless an improvement permit and a construction authorization have been obtained from the Department or the local health department unless that person is acting in accordance with the conditions and criteria of an engineered option permit pursuant to G.S. 130A-336.1 or the Authorized On-Site Wastewater Evaluator permit option pursuant to G.S. 130A-336.2.”
On-site wastewater systems inside Como town limits before they are covered or placed into use.
“No system of wastewater collection, treatment and disposal shall be covered or placed into use by any person until an inspection by the local health department has determined that the system has been installed or repaired in accordance with any conditions of the Improvement Permit, the rules, and this Article.”
Off-grid/on-site wastewater systems serving residences, businesses, or places of public assembly inside Como town limits.
“A person owning or controlling a residence, place of business or a place of public assembly shall provide an approved wastewater system.”
State-law building-permit process applicable to covered work inside Como town limits.
initial residential plan-review timeframe: <= 15 business days (Applies when a local government chooses to review residential building plans.)
“If a local government chooses to review residential building plans for any structures subject to regulation under the North Carolina Residential Code, all initial reviews for the building permit shall be performed within 15 business days of submission of the plans.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Como or Hertford County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Como publishes no rule on the point, not that none exists. Hertford County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Como means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.