McComb, Mississippi issues building permits through its Zoning, Inspections & Permits Department and administers zoning inside city limits.12 For a McComb property in Pike County, ask city Public Works about sewer service; onsite wastewater falls under Mississippi State Department of Health rules, with local inspections handled through the county health department.34
At a glance
- Building permits
- City Zoning, Inspections & Permits Department issues building and trade permits1
- Zoning
- City zoning applies inside McComb city limits2
- Septic
- MSDH rules; coordinate local inspections with the county health department4
- Lot size
- R-80: 10,000 square feet; R-50: 5,000 square feet56
- Manufactured-home size
- R-50: minimum 720 square feet and main-body width of 11 feet 6 inches7
- Owner-builder
- State licensing exemption for your own residence; city building permits and inspections remain separate8
Who to call
Building permits
McComb Zoning, Inspections & Permits Department
City building and trade permits, plan review, zoning and inspections; ask for the city Floodplain Administrator.
122 South Broadway Street
Also useful
McComb Public Works — Water & Sewer Division
Water and sewer service, new taps and sewer-line questions.
Septic permits
Mississippi State Department of Health — Division of On-Site Wastewater
Onsite wastewater applications, soil and site evaluations, and assistance arranging the appropriate local review.
570 East Woodrow Wilson Drive Jackson, MS 39216
Septic permits
Local MSDH contact; ask to be connected to onsite wastewater inspection staff.
114 East Presley Blvd McComb, MS 39648
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in McComb means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in McComb, MS?
McComb’s Inspection Department issues building, electrical, plumbing, gas, mechanical, sign and fire inspection permits, and reviews plans for new construction and alterations.1 Start a proposed home or remodeling project with the city Zoning, Inspections & Permits Department, and request the building-permit checklist and applicable trade applications.1
McComb lists the 2018 International Residential and International Building codes and the 2017 National Electrical Code on its building-code page.9 McComb performs trade inspections on new and altered buildings for code compliance; ask the department which inspection stages apply before scheduling work.10
Who issues building permits in McComb, and where do you apply?
The McComb Zoning, Inspections & Permits Department is the city contact for building permits and zoning questions at 601-249-3054.1 McComb’s application page directs in-person returns to the Zoning Department at 122 S Broadway Street, McComb, MS 39648, or mailed returns to PO Box 667, Attn: Zoning, McComb, MS 39649.11 Ask the city for current building-permit fees, required drawings and review timing before submitting.11
Mississippi provides a residential-builder licensing exemption for a person constructing or improving their own residence or acting as their own general contractor, subject to statutory limits.8 That licensing exemption does not establish an exemption from McComb’s building permits or inspections.8
Does McComb have zoning, lot-size rules and setbacks?
McComb administers zoning and land-use requirements inside city limits, so ask the city Zoning Department to identify the parcel’s district before selecting a home plan.2 In McComb’s R-80 Single-Family Residential district, every dwelling needs a lot of at least 10,000 square feet with 80 feet of width at the Building Setback Line.5 In McComb’s R-50 One- and Two-Family Residential and Manufactured Housing district, the corresponding minimums are 5,000 square feet and 50 feet of width.6
McComb limits buildings and structures in both R-80 and R-50 to 35 feet in height.1213 Request the parcel’s front, side and rear setbacks from the Zoning Department before placing a house, accessory building or manufactured home.1
How do septic permits and sewer connections work in McComb?
For a new McComb water and sewer tap, residents must apply at Public Works and finish the process with the Utility Service Representative at City Hall; the tap payment excludes the water deposit.14 Ask Public Works whether sewer service is available to the specific parcel before planning an onsite system.3 Mississippi requires connection where centralized wastewater treatment is available.15
For a McComb project needing onsite wastewater, MSDH provides online applications and soil/site evaluations resulting in a permit or recommendation required for a water meter.16 MSDH sends an online fee-payment link after receiving a complete application and does not accept environmental-fee cash or checks at county offices.16 Mississippi’s onsite wastewater rules place local inspection coordination with the appropriate county health department; the Pike County Health Department is in McComb.417
Can you live in an RV or tiny home in McComb?
We could not confirm McComb’s rule for living in an RV on a private lot or occupying a tiny home; ask the city Zoning Department about your proposed dwelling and parcel before buying either.1 McComb has city zoning, so request a district-specific answer about temporary occupancy during construction and permanent residential use.2
McComb’s R-50 district requires mobile or manufactured homes to have at least 720 square feet of floor area and a main-body width of at least 11 feet 6 inches; that provision does not establish a citywide minimum for every dwelling type.7 Mississippi also requires factory-built homes covered by its installation program to be inspected before occupation, with necessary local approvals obtained before installation.18
Building a home in McComb: what are the steps, in order?
- Ask McComb’s Zoning Department to identify the parcel’s zoning district and confirm the proposed residential use and layout.2
- Ask McComb Public Works about water and sewer availability and the new-tap application; if onsite wastewater is needed, contact MSDH for the application and site evaluation.316
- Submit the city building-permit materials through the Zoning Department and arrange the applicable construction inspections.1110
- Ask the city about flood-zone requirements before finalizing the floor elevation: in McComb special flood hazard areas with base flood elevation data, new or substantially improved residential buildings and manufactured homes need their lowest floor, including basement, at least 1 foot above base flood elevation.19
What should you check before buying land in McComb?
Ask the city Zoning Department about district requirements and Public Works about utility service before committing to a McComb lot.13 For a parcel needing septic, Pike County’s soil rating provides useful caution: only 0.1% of county soils are rated “not limited” for conventional drain fields, making site evaluation essential rather than proving septic impossible.20
Mississippi generally requires a groundwater withdrawal permit for wells with surface casing diameters of 6 inches or greater, subject to exclusions; ask about a proposed well rather than assuming city water can be replaced without review.21 For land outside McComb city limits, use the Pike County guide for the unincorporated-area building-permit question, which remains unconfirmed.22
Watch-outs
- McComb’s R-50 manufactured-home minimum is district- and dwelling-specific; do not treat it as permission for an RV or every tiny-home design.7
- McComb flood-elevation requirements can change the home layout and foundation plan in special flood hazard areas.19
- We could not confirm McComb rules for off-grid sanitation or accessory dwellings; ask the city Zoning Department and MSDH about the specific proposal.116
Sources
- McComb Zoning, Inspections & Permits Department (mccomb-ms.gov)
- Zoning, Inspections & Permits (McComb), quoted and re-checked
- Water & Sewer Division (McComb), quoted and re-checked
- Mississippi State Department of Health Current Regulations: On-site Wastewater (Mississippi statewide rule), quoted and re-checked
- Sec. 3.1. - R-80 Single-Family Residential (McComb), quoted and re-checked
- Sec. 3.3. - R-50 One- and Two-Family Residential and Manufactured Housing (McComb), quoted and re-checked
- Sec. 3.3. - R-50 One- and Two-Family Residential and Manufactured Housing (McComb), quoted and re-checked
- Mississippi Senate Journal, March 9, 2022 (Mississippi statewide rule), quoted and re-checked
- Building Codes (McComb), quoted and re-checked
- Zoning, Inspections & Permits (McComb), quoted and re-checked
- Zoning, Inspections & Permits (McComb), quoted and re-checked
- Sec. 3.1. - R-80 Single-Family Residential (McComb), quoted and re-checked
- Sec. 3.3. - R-50 One- and Two-Family Residential and Manufactured Housing (McComb), quoted and re-checked
- McComb Public Works — Water & Sewer Division (mccomb-ms.gov)
- Mississippi State Department of Health Current Regulations: On-site Wastewater (Mississippi statewide rule), quoted and re-checked
- Mississippi State Department of Health — Division of On-Site Wastewater (msdh.ms.gov)
- Pike County Health Department (msdh.ms.gov)
- MH-5 Uniform Standards Code for Factory-Built Homes Law (Mississippi statewide rule), quoted and re-checked
- Sec. 62-85. - Same—Specific (McComb), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Guidelines for Securing the Services of a Water Well Driller (Mississippi statewide rule), quoted and re-checked
- (2026 county census)
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.