Noxubee County, Mississippi

Building permits, zoning and land rules in Noxubee County, Mississippi

73Index Score / 100
#28 of 82 in Mississippi

Noxubee County, Mississippi requires a building permit, and the county publishes an application for new construction, additions, alterations and repairs1. Countywide zoning and the locally adopted building code could not be confirmed, so verify parcel rules before designing a home2,3. The Mississippi State Department of Health handles septic permitting4.

Do you need a building permit in Noxubee County, Mississippi?

Yes.

Yes. Noxubee County records a building permit as required, and the official county site publishes an application labeled for a building permit1. The application covers new work, additions, alterations and repairs, and it requests the job address, legal description, owner, contractor, design professionals, use, work description and valuation9. The form warns that an issued permit becomes void if construction does not begin within 6 months or is suspended or abandoned for 6 months after work begins9. The county-specific adopted building code, inspection stages and certificate-of-occupancy process could not be confirmed. Mississippi's statewide framework says counties and municipalities must enact uniform codes unless they opted out before November 30, 2014, but that framework alone does not establish Noxubee County's present code3.

Who handles Noxubee County building permits, and how do you reach them?

The official county site places the building-permit application among the Noxubee County Tax Assessor/Collector forms and lists the county contact at (662) 726-4744, info@noxubeecounty.org, 2832 Jefferson Street Suite-2, Macon, MS 39341.

The official county site places the building-permit application among the Noxubee County Tax Assessor/Collector forms and lists the county contact at (662) 726-4744, info@noxubeecounty.org, 2832 Jefferson Street Suite-2, Macon, MS 393411. The page does not identify a separate building department or inspector, so use that county contact to confirm where to submit the form, what plans are needed and who schedules inspections. The application provides lines for the owner, contractor, architect and engineer and includes a signature line for an owner-builder9. It also shows a valuation-based fee table, but the layout of the extracted form does not reliably pair every fee with its bracket; ask the county for the current fee calculation rather than estimating from the PDF9.

Does Noxubee County have zoning?

Countywide zoning for unincorporated Noxubee County could not be confirmed from an official ordinance or zoning map.

Countywide zoning for unincorporated Noxubee County could not be confirmed from an official ordinance or zoning map2. That unknown does not mean a parcel is unrestricted: incorporated places may apply their own land-use rules, and the statewide building-code framework is separate from zoning3. Before fixing a house site, ask the county contact whether the parcel is inside unincorporated Noxubee County and whether setbacks, subdivision review, floodplain review or another site approval applies1. If the parcel lies inside a municipality, ask that municipality about zoning and building review because a city rule does not establish the rule for unincorporated county land2. Minimum lot size, minimum dwelling size, setbacks, lot coverage and building height also could not be confirmed, so obtain a parcel-specific written answer before commissioning plans2.

How do septic and well permits work in Noxubee County?

The Mississippi State Department of Health Division of On-Site Wastewater administers septic work in Noxubee County, which MSDH places in its North Region.

The Mississippi State Department of Health Division of On-Site Wastewater administers septic work in Noxubee County, which MSDH places in its North Region4,6. For a new individual system, apply to MSDH for a soil and site evaluation and the resulting permit or recommendation; MSDH says that document is required to obtain a water meter5,10. MSDH offers an exemption pathway only for a new single-family home installing a septic system for the first time, on the first residence of a parcel of 2 or more acres or the second residence of a parcel of 5 or more acres; replacement systems and commercial properties do not qualify, MSDH does not inspect the system during installation, and the applicant stays responsible for keeping wastewater on the property5. Either way, a licensed installer must build the system from the MSDH-issued permit or recommendation, and lenders, utilities or covenants may still require final approval5. Only about 1.3% of county soils are rated without severe limitations for a conventional septic drain field, so treat soil evaluation as an early feasibility step rather than a closing-day detail11. For help, contact the wastewater call center at 1-855-220-0192 or wastewater@msdh.ms.gov6. A groundwater-withdrawal permit is required for wells with surface casing at least 6 inches in diameter, subject to exclusions8.

Can you live in an RV or tiny home on your land in Noxubee County?

A Noxubee County rule allowing or prohibiting long-term RV occupancy on private land could not be confirmed.

A Noxubee County rule allowing or prohibiting long-term RV occupancy on private land could not be confirmed2. The available statewide RV material concerns campgrounds in a different water-supply district, so it does not answer the private-parcel question in Noxubee County. Ask the county contact and, when applicable, the municipality about occupancy, temporary utility connections, sewage disposal and placement before moving an RV onto the property1,5. A county-specific tiny-home rule and minimum dwelling size also could not be confirmed2. A tiny home built or placed as a residence should be taken through the county's permit inquiry and MSDH wastewater review rather than assumed exempt because of its size1,5. The Mississippi owner-builder exemption concerns residential-contractor licensing on a person's own residence; it does not itself waive a local permit or inspection7.

How do you build a home in Noxubee County, step by step?

Confirm whether the parcel is in unincorporated Noxubee County or a municipality, then ask the appropriate local office about zoning, setbacks, floodplain review and subdivision restrictions.

  1. Confirm whether the parcel is in unincorporated Noxubee County or a municipality, then ask the appropriate local office about zoning, setbacks, floodplain review and subdivision restrictions1,2.
  2. Apply to MSDH for a soil and site evaluation and septic permit or recommendation before settling the house location5,6.
  3. If the driveway connects to a Mississippi state highway, obtain the required state permit for a new driveway or alteration12.
  4. Complete the county building-permit application with the site, ownership, contractor, design, use, valuation and work information it requests9.
  5. Call the county at (662) 726-4744 to confirm the submission location, current fee, required plans and inspection sequence because those process details are not stated on the county page1.
  6. Do not occupy the finished home until the county confirms whether a final inspection or certificate of occupancy is required.

What should you check before buying land in Noxubee County?

Check buildability at the proposed homesite, not just across the tract.

Check buildability at the proposed homesite, not just across the tract. Only about 1.3% of Noxubee County soils are rated without severe limits for a conventional septic drain field, although about 93.8% of the land has a slope of 15% or less11. About 59.3% of the county is wooded, so compare clearing and access costs between candidate sites11. Confirm legal access, and remember that a new or altered driveway connecting to a state highway requires an MDOT permit12. The effective property-tax rate is about 1%, and the median annual property-tax bill is about $86111. The nearest city of 100,000 or more is about 61 miles from the county's center, a useful signal when budgeting trips for materials and specialized trades11. Confirm flood exposure and any local floodplain review with the county because an operative Noxubee County floodplain permit rule could not be confirmed.

Watch-outs

  • The county publishes a permit form, but the adopted code, inspection sequence and certificate-of-occupancy requirement could not be confirmed; ask the county before work begins1.
  • A septic permit or recommendation is tied to the actual soil and site, and only about 1.3% of county soils are rated without severe limits for a conventional drain field5,11.
  • The owner-builder provision is a contractor-license exemption for work on a person's own residence, not an exemption from the county building-permit process1,7.

Sources

12 official pages, each quoted and re-checked · written October 10, 2026

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like 4 of the 5 neighbors with published rules, Noxubee County requires a building permit for a home.

RuleNoxubee CountyKemper CountyOktibbeha CountyWinston CountyLowndes CountyNeshoba CountyClay County
Building permitRequiredRequiredRequiredNot publishedRequiredRequiredLimited
County zoningNot publishedNot publishedYesNoNoNoYes
Septic permitsMS State Dept. of HealthMS State Dept. of HealthMSDHMS State Dept. of HealthMS State Dept. of HealthMS State Dept. of HealthMS State Dept. of Health

County locator

Noxubee County in Mississippi

73
County map
Noxubee County highlighted among the Mississippi counties · colored by Index score

How Noxubee County scores

73 / 100 · #28 of 82 in Mississippi · six factors, land price, tax, rain and climate

Seclusion72100% ev.
Self-Sufficiency67100% ev.
Admin Boringness5477% ev.
Durability61100% ev.
Property Autonomy39100% ev.
Carry Cost86100% ev.

Evidence strength: 96%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$103kTypical home
1%Property tax
$3,616Land / acre
55.4"Annual rain
5.2% of yrsSevere drought
18.6 / yr (+16.1)Mid-century 100°F days
16.8 daysMid-century dry spell
2.8" (+6.7%)Mid-century 1-day rain
1.45×Wildfire change factor
100%Forward climate coverage
$1,610Home insurance / yr
-0.7% / yrInsurance growth
2.05%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
10,125People within 30 min
968,473People within 2 hr
12,162Radius comparison (15 mi)
14.3People / sq mi
3%Federal land
93.8%Land at 15% slope or less
1.3%Soils rated "not limited" for septic (strict USDA rating)
5,935 acWorkable land screen
59.3%Wooded land
51.5 tonsBiomass / forest ac
63.6°FAvg temp

Scout Noxubee County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Noxubee County. Listing sites control their own results and filters.

Sell land in Noxubee County? Be the only seller on this page →

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Noxubee County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Not yet covered: Macon

Answers from the rulebook for Noxubee County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Mississippi rules that apply here

  • Building permitRequired

    Commercial places of Public Assembly subject to the Mississippi Fire Prevention Code.

    • Permit/compliance inspections are required for buildings defined in Miss. Code § 45-11-101(a-f), pursuant to Miss. Code § 45-11-105(2).
    • The code applies to buildings used for public assembly except where a county or municipality has adopted a fire-prevention code with standards not less stringent than the Mississippi Fire Prevention Code; the local provisions and enforcement mechanism apply instead.
    • Permit fees are not less than $400 and include, but are not limited to, each on-site inspection, attorney fees, architect or engineer plan-review fees, and other fees and reasonable and necessary travel expenses.
    • The regulation supersedes prior versions of Mississippi Administrative Code Title 19, Part 7, Chapter 7, and became effective January 1, 2025.

    permit fee: >= 400 USD (Includes but is not limited to each on-site inspection, attorney fees, architect or engineer plan-review fees, other fees, and reasonable and necessary travel expenses.)

    “Permits are required for commercial places of Public Assembly as follows: A. Permit/Compliance inspections are required for all buildings defined in Miss. Code § 45-11-101(a-f) pursuant to Miss. Code § 45-11-105(2).”
  • Owner-builder exemptionAvailable (with conditions)

    A person undertaking construction or improvement on the person's own residence or acting as the person's own general contractor for construction or improvement on that residence, for purposes of Mississippi residential builder and remodeler licensing requirements.

    • The exemption concerns the licensing chapter for residential builders and remodelers; it does not by itself establish exemption from a locally required building permit or inspection.
    • The same official legislative text also states that related exemptions have limits on permit applications or residences constructed within a one-year period, depending on the subsection and circumstances.
    “(1) This chapter shall not apply to: [...] (b) Any person who undertakes construction or improvement on his own residence, or who acts as his own general contractor in the performance of construction or improvement on his own residence;”
  • Building code adoptedPartial

    The Mississippi Fire Prevention Code and State Fire Marshal enforcement for state-owned or state-agency buildings, public-assembly buildings, and buildings at least 75 feet high, subject to local fire-prevention-code exceptions stated in the statute.

    • The State Fire Marshal's Office adopted the 2024 editions of the International Fire Code and International Building Code effective July 1, 2024.
    • The Mississippi Fire Prevention Code applies to all buildings owned by the State or State Agencies.
    • It applies to all buildings utilized for public assembly except in a county or municipality that has adopted a fire-prevention code with standards not less stringent than the Mississippi Fire Prevention Code.
    • It applies to buildings whose construction permits were issued after the statutory effective date and that are not less than 75 feet in height, unless the county or municipality has adopted a fire-prevention code with standards not less stringent than the Mississippi Fire Prevention Code.

    International Fire Code edition: 2024 edition · International Building Code edition: 2024 edition · effective date: 2024-07-01 · height threshold: >= 75 feet (Local fire-prevention code exception applies where stated.)

    “AS OF JULY 1, 2024, THE STATE OF MISSISSIPPI – OFFICE OF THE STATE FIRE MARSHAL HAS ADOPTED THE 2024 ADDITION”
    2 more reviewed findings on this topic
    • Partial — Mississippi counties and municipalities subject to the statewide uniform-building-code framework.
      “Under Senate Bill 2378 of 2014, all counties and municipalities must enact uniform building codes unless they opt out prior to Nov. 30, 2014. Please complete the following information regarding your county or municipality’s building code policies.”
    • Partial — Mississippi counties and municipalities, including residential building-code adoption subject to the statewide uniform-building-code framework.
      “Under Senate Bill 2378 of 2014, all counties and municipalities must enact uniform building codes unless they opt out prior to Nov. 30, 2014.”
  • InspectionsLimited

    Pediatric skilled nursing facilities regulated by the Mississippi State Department of Health.

    • Upon completion of construction, the Licensing Agency must inspect and approve the facility before occupancy.
    • The state and county health departments may access the job site during regular business hours and conduct construction progress inspections as deemed necessary by the agency.
    “Upon completion of construction, an inspection shall be made by the Licensing Agency and approval given prior to occupying the building or any part thereof. The state and county health departments shall have access to the job site during regular business hours and shall conduct construction progress inspections as deemed necessary by the agency.”
  • Certificate of occupancyLimited

    Pediatric skilled nursing facilities regulated by the Mississippi State Department of Health at final inspection and close-out.

    • At final inspection, the State Agency must receive a Certificate of Occupancy or statement of approval from the local building official permitting occupancy for the facility's intended use.
    • If there is no local building authority, approval from the local fire authority having jurisdiction must be provided.
    • If the facility is state-owned and subject to the State Bureau of Buildings, Grounds and Real Estate Management, approval of occupancy must be coordinated between the state agencies involved.
    “A copy of the Certificate of Occupancy or statement of approval from the local building official permitting occupancy of the facility for its intended use. In the absence of a local building authority, approval of a local fire authority having jurisdiction shall be provided. If the facility is owned by the State of Mississippi and subject to the State Bureau of Buildings Grounds and Real Estate Management, approval of occupancy shall be coordinated between the state agencies involved;”
  • SetbacksSpecified

    Individual on-site wastewater disposal systems using aggregate disposal systems in Mississippi.

    • The 50-foot measurement is the minimum distance from the water edge for all listed non-gravel soil textural classes and for slopes both less than and more than 8 percent.
    • Gravel is marked "NOT APPLICABLE."
    • The regulation states that these setbacks apply to all individual on-site wastewater disposal systems except spray-irrigation disposal and overland discharge.
    • This is an on-site-wastewater setback, not a statewide zoning setback for the dwelling or other structures.

    minimum distance from water edge: 50 feet (Aggregate systems in coarse sand, medium sand, fine sand, loamy sand, sandy loam, light loam, heavy loam, silt loam, sandy clay loam, light clay loam, heavy clay loam, light silty clay loam, heavy silty clay loam, sandy clay, silty clay, and clay; both slope categories shown in Table 1.)

    “TABLE 1 - SETBACK REQUIREMENTS FROM SENSITIVE WATER (Aggregate Systems) Minimum Distance from the Water Edge [...] Coarse Sand 50 feet 50 feet”
  • Living in an RVLimited

    RVs at a hunting camp where the camp uses the Mississippi Department of Health on-site wastewater application process.

    • The camp is treated by MSDH as a residential application.
    • Three or more trailers, cabins, or RVs on the property must be applied for as a commercial development.
    • For a permanent water meter, state law requires a permanent sewage-disposal solution; it may be a sewer line or septic system. If public sewer is unavailable, the applicant must apply to MSDH for the required paperwork.
    • Local jurisdictions have separate land ordinances; this claim does not establish a statewide land-use permission for RV occupancy.

    trailers/cabins/RVs triggering commercial-development application: >= 3 units (On the hunting-camp property.)

    “Yes. This is considered a residential application with us. If there will be three (3) or more trailers/cabins/RVs on the property, this will need to be applied for as a commercial development.”
  • Tiny homesLimited

    A tiny house or home intended for use as a residential dwelling that is within the State Fire Marshal's factory-built-home regulation.

    • The defined tiny house or home ranges from 80 to less than 400 square feet and may or may not be constructed on a chassis with or without axles or wheels.
    • If intended as a residential dwelling, it is treated as a modular home for design and construction requirements and must comply with the most current residential building code adopted by the Mississippi Building Codes Council.
    • When designed for permanent installation at its final destination, it must be installed on an approved foundation complying with the manufacturer's installation guidelines concerning manufacturing-facility and retail-entity licensure and occupant-safety installation standards.
    • The amended regulation superseded prior versions and became effective July 1, 2026.
    • Counties and municipalities may regulate zoning, utility connections, foundations, and permits for modular homes; local land-use controls may therefore add requirements.

    tiny-home floor area: 80 to less than 400 square feet (Definition in Rule 3.01.3(42).)

    ““Tiny House or Home”: Any closed structure, building assembly or systems of assemblies designed for use as a residential dwelling and ranging from 80 to less than 400 square feet in size, which may or may not be constructed on a chassis (with or without axels or wheels).”
  • Manufactured homesLimited

    Occupation of Factory-Built homes, including manufactured homes, sited anywhere in Mississippi and installed on or after July 1, 2009.

    • The home must undergo inspection under the Mississippi Inspection Program before occupation.
    • The inspection is conducted by an inspector assigned by the State Fire Marshal’s Office to verify compliance with the manufacturer’s published installation instructions and Mississippi Installation Standards.
    • The retailer/developer and/or installer/transporter must submit a Property Locator/Certificate of Installation Form certifying compliant installation.
    • For new or used residential homes involving a retailer, the form and required photographs must be submitted within three business days after installation and before porches, decks, or skirting are installed.
    • For secondary sitings without a retailer, the installer/transporter must submit the form and required photographs within three business days after installation and before porches, decks, or skirting are installed.
    • All necessary state-law or local-authority-having-jurisdiction permits must be obtained before installation.
    • Inspection fees are paid by the installer/transporter, developer, or retailer, not the purchaser; failure to pay an invoice within 45 days is a regulatory violation.
    • Factory-Built homes designated and properly certified not to be used for human habitation, such as hunting/fishing camps or storage, are excepted from the human-habitation installation requirements.

    installation inspection applicability date: 2009-07-01 · current regulation effective date: 2026-07-01 · certificate submission deadline: <= 3 business days after installation (Must also be before installation of porches, decks, or skirting; secondary sitings without a retailer follow the installer/transporter rule.) · inspection scheduling window: 7 to 10 business days after receipt of Property Locator/Certificate of Installation (May be adjusted for Division resource and manpower shortages.) · inspection invoice payment deadline: <= 45 days from invoice date (Nonpayment is a violation and numerous unpaid invoices may delay or deny license issuance.)

    “Beginning July 1, 2009, every Factory-Built home that is sited within the State of Mississippi shall be subject to inspection under the MS Inspection Program prior to occupation.”
  • Who permits septicState

    Individual on-site wastewater disposal systems in Noxubee County.

    • The Mississippi State Department of Health Division of On-site Wastewater administers the statewide program.
    • Noxubee County is listed in the MSDH North Region.
    “The On-site Wastewater program develops policy and regulations [...] North Region Alcorn, [...] Noxubee, [...]”
    One more reviewed finding on this topic
    • Mixed — Statewide individual onsite wastewater disposal systems; the Mississippi State Department of Health establishes the rules and the appropriate county Department of Health performs local inspections.
      “Notify the Department at least 48 hours before beginning construction if acting as the Certified Installer of an Individual On-site Wastewater Disposal System and, at that time, schedule a time for inspection of the system with the appropriate county Department of Health.”
  • Septic permitRequired

    Design, construction, or installation of an individual on-site wastewater disposal system in Mississippi.

    • MSDH approval is required except for the statutory exemption in Mississippi Code Section 41-67-6(7).
    • For a two-acre-or-larger lot or tract, approval requirements are exempt only if all wastewater is contained on the lot or tract, no Mississippi or United States watercourse is impacted, and the installer submits a signed affidavit attesting to those conditions.
    • An individual on-site wastewater disposal system is acceptable only where centralized treatment is unavailable or infeasible, existing area disposal systems function satisfactorily, site conditions are satisfactory for underground absorption, private-water-supply separation/protection requirements are met, and applicable water-quality requirements are met.
    • Construction or installation designed by a certified professional evaluator or licensed professional engineer may not begin before Department authorization.

    statutory approval-exemption lot size: >= 2 acres (All wastewater must be contained on the tract, no covered watercourse may be impacted, and an installer affidavit is required.) · private water supply separation from IOWDS: >= 50 feet (Private supply must be at a higher elevation or properly protected.) · private water supply separation from disposal field: >= 100 feet

    “Approval of the design, construction or installation of an individual on-site wastewater disposal system by the department is required, except as otherwise provided in Section 41-67-6(7).”
    One more reviewed finding on this topic
  • Septic inspectionLimited

    Individual on-site wastewater disposal system installations in Noxubee County under Mississippi State Department of Health jurisdiction.

    • MSDH inspection and approval apply to the regular application pathway.
    • The exemption pathway is exclusively for new, single-family residences installing a septic system for the first time.
    • Commercial properties and replacement systems are not eligible for the exemption.
    • The exemption may apply to the first residence on a parcel of two (2) or more acres or the second residence on a parcel of five (5) or more acres.
    • Under the exemption, MSDH will not inspect the system during installation.
    • The applicant remains responsible for ensuring that wastewater does not leave the property or impact a Mississippi or United States watercourse.
    • The exemption application invoice is $100 plus a processing fee; the FAQ states fees are subject to change.
    • A septic system must still be installed from the MSDH-issued permit or recommendation by a licensed installer, and proper paperwork must be submitted.

    first residence parcel acreage threshold: >= 2 acres (exemption pathway) · second residence parcel acreage threshold: >= 5 acres (exemption pathway) · exemption application fee: 100 USD (plus processing fee; fees subject to change)

    “The exemption application is exclusively for new, single-family residences installing a septic system for the first time. Any property that is commercial or replacing an existing system are not eligible. It may be applied for the first residence on a parcel of land of two (2) or more acres or second residence on a parcel of land of five (5) or more acres. There are two differences between the exemption and the regular application. The first difference is the exemption is nearly half the cost of a regular application. The second difference means we do not go out to approve the installation, which is why the application costs less.”
    One more reviewed finding on this topic
  • Well permitLimited

    Groundwater withdrawal permits for water wells in Mississippi.

    • A groundwater withdrawal permit is required for water wells with surface casing diameters of 6 inches or greater.
    • Some exclusions apply.
    • A separate contractor licensing requirement generally applies, but a landowner may drill without a Water Well Contractor license for a single-family permanent residence or farm livestock use if applicable construction standards are followed.
    • Wells with surface casing diameters below 6 inches may still be regulated by the Mississippi State Department of Health when part of a public water system.

    surface casing diameter threshold: >= 6 inches (Some exclusions apply.)

    “State law requires that you obtain a groundwater withdrawal permit for water wells with surface casing diameters 6-inches or greater in diameter. Some exclusions apply to this requirement.”
  • Mandatory utility hookupConditional

    Public water connections and connection to centralized wastewater treatment systems for residences, buildings, and facilities in Mississippi.

    • A public water utility may not connect water service without prior written Department approval certifying that the sewage treatment and disposal plan complies with state law.
    • Water utility connections may be made during construction only if the Department approved the sewage plan and the owner agreed to inspection and approval before use or occupancy.
    • Where centralized wastewater treatment is constructed and becomes available, onsite systems must be abandoned and residences, buildings, or facilities connected to the centralized system.
    • Temporary onsite systems may be used only under the stated 36-month centralized-treatment conditions.

    centralized wastewater availability deadline: 36 months (The developer must sign a written agreement to connect when available and install internal sewage collection to the connection point.)

    “Where a Centralized Wastewater Treatment System is available, all places shall have a properly constructed connection to the centralized wastewater treatment system which all human excreta and other liquid waste shall be disposed”
    One more reviewed finding on this topic
  • Agricultural exemptionAvailable

    Applicability of Mississippi Code Title 73, Chapter 59 residential-builder and remodeler licensing requirements.

    • The cited exemption applies to the Residential Builders and Remodelers chapter.
    • It covers agricultural buildings, buildings used for agricultural purposes, buildings constructed as a community effort, and tenant houses.
    • The source does not establish an exemption from independently applicable local permits, zoning, floodplain rules, or wastewater requirements.
    “This chapter shall not apply to: (a) Agricultural buildings, buildings used for agricultural purposes, buildings constructed as a community effort, or tenant houses;”
  • Subdividing landRegulated (with conditions)

    Mississippi State Department of Health review of subdivision land divisions for onsite-wastewater suitability; this does not establish that MSDH approves the general land-use plat or replaces county or municipal plat review.

    • A subdivision is defined for this review as land divided into ten (10) or more lots, tracts, sites, or parcels for residential development.
    • Local or county ordinances may reduce the ten-lot threshold.
    • If public water will be used, the Bureau of Public Water Supply may require subdivision review regardless of lot count.
    • Developments of 35 or more lots and additional phases by the same owner require a feasibility study; developments under 35 lots may be required to obtain one case-by-case.
    • No lots may be sold or construction started before evaluation.
    • The subdivision plan-review fee is $325 plus $6.50 per lot; online payment is subject to a processing fee and fees may change.
    • The plan review is voided if the developer alters the plat without notifying MSDH; MSDH determines whether a new review is required.
    • MSDH reviews lots for general suitability of onsite wastewater treatment and disposal for one residence per lot; septic, soil, wetland, water-supply, and other health requirements remain applicable.

    residential subdivision threshold: >= 10 lots (Local ordinances may reduce the minimum below ten lots.) · feasibility-study threshold: >= 35 lots (Additional phases by the same owner also require a feasibility study; smaller developments may be required case-by-case.) · subdivision plan-review fee: 325 USD (Plus $6.50 per lot; online payment processing fee and possible additional costs may apply.)

    “All lots are reviewed for general suitability of on-site wastewater treatment and disposal for a single residence per lot.”
  • Driveway accessRequired

    Driveways and specified changes of use connecting to Mississippi state highways.

    • A permit is required for new driveways.
    • A permit is required for alterations to existing drives.
    • A permit is required for a change of use causing a daily-trip increase of 10% or 100 daily trips, whichever is greater.
    • A permit is required for property-use changes from non-commercial to commercial.
    • If access is expected to exceed 100 peak-hour trips, a traffic-impact study must be submitted.
    • If the permitted land use changes, the original permit is revoked and a new permit must be applied for.
    • A denied permit may be appealed within 10 days after receipt of the denial notification.

    daily trip increase threshold: 10 percent (or 100 daily trips, whichever is greater) · traffic impact study threshold: > 100 peak-hour trips · appeal deadline: 10 days (after receipt of denial notification)

    “For State Highways a permit is required for: 1. New driveways; 2. Alterations to existing drives;”
  • Building in a floodplainRequired

    Development or improvement activity on state-owned Mississippi property or buildings located in FEMA Special Flood Hazard Area zones A, AE, V, or VE.

    • The requirement applies to state-owned property or buildings.
    • For existing structures determined to involve less than a Substantial Improvement, no additional forms or approval are required after Step One.
    • For new development or a Substantial Improvement, the applicant must complete the Step Two form, obtain a Control Code, provide all required attachments, and submit final elevation certification and complete drawings and specifications.
    • Approval produces an initial approval letter and, after final requirements are approved, a final approval letter.
    • If Step Two is not approved and the project cannot be brought into compliance, a denial letter is issued.

    covered FEMA zones: A, AE, V, VE · substantial improvement threshold: less than a Substantial Improvement (no additional forms or approval required for the development project)

    “A development or improvement activity to state-owned property or building, [...] must complete a Floodplain Management Permit Application.”
  • Permit feesPublished (with conditions)

    Mississippi Department of Transportation over-dimensional and related permits statewide.

    • The published schedule applies to MDOT permit types, not a general statewide building-permit fee schedule.
    • Blanket permits are not prorated and are issued for one year unless otherwise specified.
    • Blanket permits must have valid insurance or a valid U.S. DOT number; if insurance expires or cancels, the blanket permit becomes invalid.
    • Overweight charges apply to weight exceeding 80,000 pounds or specified axle limits.

    oversize permit fee: 10 USD · oversize blanket fee: 100 USD · 72-hour legal trip permit fee: 25 USD · harvest permit fee: 25 USD · port permit fee: 170 USD per year · pole blanket fee: 200 USD

    “Oversize permit $10.00 Oversize Blanket $100.00”
  • Permit processPartial

    Mississippi local permitting for businesses and business-related construction or land development.

    • Permits may be required from city or county governments.
    • Different locations have different requirements.
    • Building permits generally come from the city or county building and planning department for constructing or modifying a place of business.
    • Zoning permits generally come from the city or county building and planning department for developing land for specific commercial use.
    “You may be required to apply for permits and licenses from your local government (e.g., city or county). Different locations have different requirements.”
  • Campground & park staysLimited

    Recreational-vehicle occupancy at campgrounds under the jurisdiction of the Pearl River Valley Water Supply District, including Coal Bluff, Goshen Springs, Leake County Water Park, Low Head Dam, and Timberlake.

    • The rules apply within all campgrounds under the District’s jurisdiction.
    • Campgrounds are not intended to be permanent domiciles for campground guests.
    • A recreational vehicle must be in operable road-worthy condition, properly registered and insured in its domicile state or province, with a current license plate affixed.
    • Campers may not stay on any pad longer than 12 consecutive months; Standard Plus campers may move to another available pad after 12 months, but the District is not responsible for making a pad available.
    • Campsites are typically designed for trailers or recreational vehicles no longer than 32 feet or wider than 8 feet, subject to the stated RVIA-seal, holding-tank, facility-capacity, and prohibited-unit conditions.
    • Primitive camping areas without water, electricity, or sewer are not intended for recreational vehicles.
    • No permanent structures may be erected on a campsite; temporary accessibility stairs, stoops, steps, or ramps require the stated approvals and size limits.
    • Camping is confined to designated campground or overflow areas, and no more than one camping unit is allowed per pad without Campground Manager approval.

    maximum stay on one pad: <= 12 consecutive months (Campers may move to a different available pad after 12 months.) · typical campsite RV length: <= 32 feet (Larger units may be accepted if they satisfy the stated RVIA seal, holding-tank, and facility-capacity conditions.) · typical campsite RV width: <= 8 feet (Larger units may be accepted if they satisfy the stated RVIA seal, holding-tank, and facility-capacity conditions.)

    “Campers shall not stay on any pad longer than 12 consecutive months”
    One more reviewed finding on this topic
  • county building authorityGeneral

    Mississippi county boards of supervisors' authority and obligation to adopt uniform building codes, including in unincorporated county territory, subject to the statutory opt-out framework.

    • All counties and municipalities must enact uniform building codes unless they opted out before November 30, 2014.
    • A county board of supervisors adopting building codes after July 1, 2008 must adopt as minimum codes codes established and promulgated by the Mississippi Building Codes Council.
    • The statewide source does not identify current county-by-county residential permit enforcement or opt-out status.

    opt-out deadline: 2014-11-30 · minimum-code requirement for codes adopted after: >= 2008-07-01

    “Under Senate Bill 2378 of 2014, all counties and municipalities must enact uniform building codes unless they opt out prior to Nov. 30, 2014.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • County-wide zoning — Countywide zoning in Noxubee County, including unincorporated areas.
  • Local zoning — Municipal zoning within Noxubee County (Macon, Shuqualak, Brooksville)
  • Zoning districts — Published zoning districts or zoning maps for Noxubee County.
  • Minimum dwelling size — Minimum dwelling size requirements in Noxubee County.
  • Minimum lot size — Minimum lot-size requirements in Noxubee County.
6 more unanswered
  • Lot coverage
  • Building height
  • Camping on your land
  • Accessory dwellings
  • Off-grid sanitation
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Noxubee County, Mississippi

Is Noxubee County a good place to live off-grid or homestead?

Noxubee County scores 73/100 on the Bolthole Index, a strong county profile. Its strengths: manageable long-term carry cost and sparse surroundings — about 10,125 people within a 30-minute drive. Watch-outs: a weaker property-autonomy legal backdrop.

How much does land cost in Noxubee County, Mississippi?

Land in Noxubee County runs about $3,616 per acre, based on the latest county data.

What is the water situation in Noxubee County?

Noxubee County gets about 55.4" of rain a year, with severe drought in roughly 5.2% of years.

How remote is Noxubee County?

A representative private-land location has about 10,125 people within a 30-minute drive and 968,473 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Noxubee compares in Mississippi