Bolthole Index

Amite County, Mississippi

Building permits, zoning and land rules in Amite County, Mississippi

75Index Score / 100
#19 of 82 in Mississippi

Amite County, Mississippi requires a county development permit for work in regulated floodplain areas, but we could not confirm a general residential building-permit requirement outside that process1. We could not confirm countywide zoning either; the Town of Centreville has its own planning and zoning review2,3. Septic permits for every Amite County address go through the Mississippi State Department of Health, not the county or the town4.

Do you need a building permit in Amite County, Mississippi?

Amite County requires a development permit for work in or affecting a regulated floodplain.

Amite County requires a development permit for work in or affecting a regulated floodplain1. Development includes buildings and structures as well as filling, grading, paving, excavating, drilling and permanent storage1. Floodway or flood-zone work may require engineering data, surveyed elevation certification and flood-proofing information9. We could not confirm whether Amite County requires a separate general residential building permit or general inspections outside the floodplain process, so ask county government before construction1. Mississippi law required counties and municipalities to enact uniform building codes unless they opted out before November 30, 2014, and the available material does not show whether Amite County adopted a code or opted out10. Septic permits are a separate state-run process, covered below4.

Who handles floodplain, building and septic permits in Amite County, Mississippi?

Amite County Emergency Management administers floodplain permitting and regulatory work; its office is at 185 Irene St. in Liberty and its phone number is 601-657-1011.

Amite County Emergency Management administers floodplain permitting and regulatory work; its office is at 185 Irene St. in Liberty and its phone number is 601-657-10119. The county directs applicants seeking a new 911 address to the Central Repair Facility at 720 Industrial Park Dr. in Liberty to complete the floodplain application5. The proposed driveway location must be marked so the county can locate it for addressing1. The floodplain application used to obtain a 911 address costs $20, payable by cash or check; that published amount is not a general building-permit fee schedule5. Septic permits are not issued by either county office; they come from the Mississippi State Department of Health, listed below11.

Does Amite County have zoning?

We could not confirm whether unincorporated Amite County has countywide zoning.

We could not confirm whether unincorporated Amite County has countywide zoning2. The Town of Centreville has a Planning and Zoning Commission that reviews zoning amendments, site plans and plat applications, so land in Centreville has a separate municipal review layer3. The town's Code Enforcement Division enforces its zoning and sanitation codes, though the town's zoning districts and dimensional standards were not published on the pages we could find12. Septic permits for a Centreville address still come through MSDH4. We could not confirm county rules for setbacks, minimum lot size, minimum dwelling size, building height or agricultural-building exemptions2. Ask county government about unincorporated parcels and the relevant town about land inside municipal limits13. MSDH also reviews wastewater for subdivisions, with its own lot-count and feasibility-study triggers6.

How do septic permits work in Amite County?

The Mississippi State Department of Health handles onsite wastewater permitting for Amite County through its South Region.

The Mississippi State Department of Health handles onsite wastewater permitting for Amite County through its South Region4. A complete application needs property documentation, a plot plan, a site and soil evaluation, and payment5,6. Properties within one mile of a sewer line are referred to the sewer provider first, and MSDH may require a rejection letter before proceeding with septic6. An installation inspection can be requested and may be required by a lender, utility, municipality or another entity, but Mississippi does not require a septic inspection simply because property is being sold14. Only 7.8% of county soils are rated without severe limits for a conventional drain field, so settle wastewater feasibility before fixing the house site15.

Can you live in an RV or tiny home on land in Amite County?

We could not confirm an Amite County rule allowing or barring long-term RV living, tiny-home occupancy, temporary camping or a minimum dwelling size on private unincorporated land.

We could not confirm an Amite County rule allowing or barring long-term RV living, tiny-home occupancy, temporary camping or a minimum dwelling size on private unincorporated land2. The county address application mentions proposed structure types, but the application is not an occupancy approval5. Mississippi does not treat gray water as a separate disposal category: wastewater must go to sewer or septic rather than onto the ground, into a ditch or into a body of water6. A local authority may allow a temporary portable toilet until septic is installed, but that does not answer whether residential RV or tiny-home occupancy is allowed6. A permanent water meter requires an available sewer or septic solution6.

Building a home in Amite County: what are the steps?

Ask county government whether the parcel needs any general residential building approval in addition to the floodplain process.

  1. Ask county government whether the parcel needs any general residential building approval in addition to the floodplain process1.
  1. Complete the county address/development-permit packet, mark the proposed driveway, and pay its published fee1,5.
  1. If the parcel is in Centreville, take zoning, site-plan or plat questions to the town's Planning and Zoning Commission3.
  1. Give MSDH the property documents and plot plan for its onsite wastewater site and soil evaluation5.
  1. Resolve sewer availability before seeking septic approval or permanent water service6.
  1. Ask MSDH whether an installation inspection is requested or required for the project14.
  1. If the driveway connects to a state highway, obtain the required state access permit16. An owner-builder licensing exemption may apply to work on the owner's own residence, but it does not erase local permits or inspections7.

What should you check before buying land in Amite County?

Check flood status with Amite County Emergency Management before choosing a homesite because regulated floodplain work can trigger engineering, elevation and flood-proofing documentation.

Check flood status with Amite County Emergency Management before choosing a homesite because regulated floodplain work can trigger engineering, elevation and flood-proofing documentation9. Arrange the MSDH site and soil evaluation early because only 7.8% of county soils are rated without severe limitations for a conventional drain field15. For a proposed well, ask the Mississippi Office of Land and Water Resources whether a Water Use Permit applies before drilling; permitted wells require completion information afterward and must be drilled by a state-licensed water-well contractor8. Confirm access separately because marking a driveway for addressing does not establish whether another access approval applies1. Budget for an effective property-tax rate of about 0.5% and a median annual bill of about $43515.

Watch-outs

  • A county floodplain development permit is documented, but a separate general home-permit, inspection or certificate-of-occupancy rule remains unconfirmed1.
  • The county's published $20 fee applies to its floodplain application for a 911 address, not a published general building-permit fee schedule5.
  • A permanent water connection requires a sewer or septic solution, and nearby sewer availability can affect whether MSDH proceeds with a septic application6.
  • Centreville has municipal planning and zoning review; do not treat the unconfirmed countywide zoning status as an answer for property inside town2,3.
  • MSDH wastewater review applies to subdivisions, while Amite County's separate plat or land-division process remains unconfirmed6.
  • Amite County's address packet asks for a $20 check or money order payable to "Amite county permit fee" mailed to P.O. Box 699, Liberty, MS 39645, while the FAQ describes paying in person by cash or check at the Central Repair Facility1,5.

Sources

16 official pages, each quoted and re-checked · written October 9, 2026

Found land here? Start a Property Hunt →

Compared with neighboring counties

RuleAmite CountyPike CountyFranklin CountyWilkinson CountyLincoln CountyAdams CountyWalthall County
Building permitLimitedNot publishedNot publishedNot publishedNot publishedNot publishedLimited
County zoningNot publishedNoNoNot publishedNoNoNo
Septic permitsMS State Dept. of HealthMSDHMS State Dept. of HealthMS State Dept. of HealthMS State Dept. of HealthMSDHMSDH

County locator

Amite County in Mississippi

75
County map
Amite County highlighted among the Mississippi counties · colored by Index score

How Amite County scores

75 / 100 · #19 of 82 in Mississippi · six factors, land price, tax, rain and climate

Seclusion76100% ev.
Self-Sufficiency68100% ev.
Admin Boringness6345% ev.
Durability55100% ev.
Property Autonomy39100% ev.
Carry Cost86100% ev.

Evidence strength: 91%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$145kTypical home
0.5%Property tax
$3,315Land / acre
62.7"Annual rain
6.2% of yrsSevere drought
8.9 / yr (+8.2)Mid-century 100°F days
15.8 daysMid-century dry spell
3.11" (+5.4%)Mid-century 1-day rain
1.39×Wildfire change factor
100%Forward climate coverage
$2,081Home insurance / yr
0.9% / yrInsurance growth
0.95%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
5,249People within 30 min
1,974,757People within 2 hr
14,500Radius comparison (15 mi)
17People / sq mi
7.6%Federal land
86.4%Land at 15% slope or less
7.8%Soils rated "not limited" for septic (strict USDA rating)
36,250 acWorkable land screen
79.9%Wooded land
55.6 tonsBiomass / forest ac
66°FAvg temp

Scout Amite County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Amite County. Listing sites control their own results and filters.

Sell land in Amite County? Be the only seller on this page →

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Amite County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Answers from the rulebook for Amite County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Amite County rules

  • Building permitLimited

    Development in or affecting regulated floodplain areas of Amite County.

    • The county development permit identifies development as including buildings, structures, filling, grading, paving, excavating, drilling, and permanent storage.
    • Floodway or flood-zone projects may require engineering certification, supporting data, surveyed certification, and flood-proofing information.
    • The permit must comply with the Amite County Flood Damage Prevention Ordinance and other applicable laws or ordinances.
    “Development Standards Data (Ref: Amite County Flood Damage Prevention Ordinance)”
  • Building in a floodplainRequired

    Development in regulated floodplain areas of Amite County.

    • The county floodplain administration program includes permitting and regulatory work.
    • Inside regulatory floodways or areas without an established regulatory floodway, engineering certification and supporting data are required.
    • Lowest-floor elevations, surveyed certifications, and flood-proofing information may be required.
    • Issuance is contingent on correct information and required plans and supporting data.
    “The floodplain administration program includes permitting and regulatory work associated with the floodplain in Amite County.”
  • Permit feesPublished (with conditions)

    The Amite County floodplain/911-address application process.

    • The county FAQ states that the $20 fee is for the floodplain application used to obtain a 911 address.
    • The source does not establish fees for general residential building permits or inspections.

    floodplain application fee: 20 USD (cash or check)

    “You apply for a 911 address by going to the Amite County Central Repair facility located at 720 Industrial Park Dr. Liberty, MS 39645 and fill out a floodplain application and pay a $20 fee via cash or check.”
    One more reviewed finding on this topic
    • Published (with conditions) — The county's published address/development-permit packet, including the floodplain administration process; this does not establish a general building-permit fee schedule.
      “Once you have completed the permit please mail it back along with a check or money order in the amount of $20 made out to Amite county permit fee P.O. Box 699 Liberty, MS 39645”
  • Permit processPartial

    Amite County floodplain and 911-address process for proposed structures.

    • Applicants go to the Central Repair facility at 720 Industrial Park Drive in Liberty.
    • Applicants complete a floodplain application and pay $20 by cash or check.
    • The county verifies that the proposed structure is not inside a regulatory floodway before issuing the 911 address.
    • The county FAQ identifies the structure type, property location, directions, and parcel/owner information as requested application details.

    floodplain application fee: 20 USD (cash or check)

    “This form allows us to verify the flood zone status of the proposed location and issue a 911 address.”
    One more reviewed finding on this topic
    • Partial — Amite County development permits administered through the county Emergency Management, Fire Services, and Floodplain Administration process.
      “Applicant acknowledgement: I understand that the issuance of this permit is contingent upon the above information being correct and the plans and supporting data have been or shall be provided as required.”

Mississippi rules that apply here

  • Owner-builder exemptionAvailable (with conditions)

    A person undertaking construction or improvement on the person's own residence or acting as the person's own general contractor for construction or improvement on that residence, for purposes of Mississippi residential builder and remodeler licensing requirements.

    • The exemption concerns the licensing chapter for residential builders and remodelers; it does not by itself establish exemption from a locally required building permit or inspection.
    • The same official legislative text also states that related exemptions have limits on permit applications or residences constructed within a one-year period, depending on the subsection and circumstances.
    “(1) This chapter shall not apply to: [...] (b) Any person who undertakes construction or improvement on his own residence, or who acts as his own general contractor in the performance of construction or improvement on his own residence;”
  • Building code adoptedPartial

    The Mississippi Fire Prevention Code and State Fire Marshal enforcement for state-owned or state-agency buildings, public-assembly buildings, and buildings at least 75 feet high, subject to local fire-prevention-code exceptions stated in the statute.

    • The State Fire Marshal's Office adopted the 2024 editions of the International Fire Code and International Building Code effective July 1, 2024.
    • The Mississippi Fire Prevention Code applies to all buildings owned by the State or State Agencies.
    • It applies to all buildings utilized for public assembly except in a county or municipality that has adopted a fire-prevention code with standards not less stringent than the Mississippi Fire Prevention Code.
    • It applies to buildings whose construction permits were issued after the statutory effective date and that are not less than 75 feet in height, unless the county or municipality has adopted a fire-prevention code with standards not less stringent than the Mississippi Fire Prevention Code.

    International Fire Code edition: 2024 edition · International Building Code edition: 2024 edition · effective date: 2024-07-01 · height threshold: >= 75 feet (Local fire-prevention code exception applies where stated.)

    “AS OF JULY 1, 2024, THE STATE OF MISSISSIPPI – OFFICE OF THE STATE FIRE MARSHAL HAS ADOPTED THE 2024 ADDITION”
    4 more reviewed findings on this topic
    • Partial — Building-code adoption framework applicable to Mississippi counties, including Amite County.
      “Under Senate Bill 2378 of 2014, all counties and municipalities must enact uniform building codes unless they opt out prior to Nov. 30, 2014.”
    • Partial — All Mississippi counties and municipalities subject to Senate Bill 2378 of 2014, including Amite County unless it timely opted out.
      “Under Senate Bill 2378 of 2014, all counties and municipalities must enact uniform building codes unless they opt out prior to Nov. 30, 2014. Please complete the following information regarding your county or municipality’s building code policies.”
    • Partial — Mississippi counties and municipalities subject to the statewide uniform-building-code framework.
      “Under Senate Bill 2378 of 2014, all counties and municipalities must enact uniform building codes unless they opt out prior to Nov. 30, 2014. Please complete the following information regarding your county or municipality’s building code policies.”
    • Partial — Mississippi counties and municipalities, including residential building-code adoption subject to the statewide uniform-building-code framework.
      “Under Senate Bill 2378 of 2014, all counties and municipalities must enact uniform building codes unless they opt out prior to Nov. 30, 2014.”
  • InspectionsLimited

    Pediatric skilled nursing facilities regulated by the Mississippi State Department of Health.

    • Upon completion of construction, the Licensing Agency must inspect and approve the facility before occupancy.
    • The state and county health departments may access the job site during regular business hours and conduct construction progress inspections as deemed necessary by the agency.
    “Upon completion of construction, an inspection shall be made by the Licensing Agency and approval given prior to occupying the building or any part thereof. The state and county health departments shall have access to the job site during regular business hours and shall conduct construction progress inspections as deemed necessary by the agency.”
  • Certificate of occupancyLimited

    Pediatric skilled nursing facilities regulated by the Mississippi State Department of Health at final inspection and close-out.

    • At final inspection, the State Agency must receive a Certificate of Occupancy or statement of approval from the local building official permitting occupancy for the facility's intended use.
    • If there is no local building authority, approval from the local fire authority having jurisdiction must be provided.
    • If the facility is state-owned and subject to the State Bureau of Buildings, Grounds and Real Estate Management, approval of occupancy must be coordinated between the state agencies involved.
    “A copy of the Certificate of Occupancy or statement of approval from the local building official permitting occupancy of the facility for its intended use. In the absence of a local building authority, approval of a local fire authority having jurisdiction shall be provided. If the facility is owned by the State of Mississippi and subject to the State Bureau of Buildings Grounds and Real Estate Management, approval of occupancy shall be coordinated between the state agencies involved;”
  • SetbacksSpecified

    Individual on-site wastewater disposal systems using aggregate disposal systems in Mississippi.

    • The 50-foot measurement is the minimum distance from the water edge for all listed non-gravel soil textural classes and for slopes both less than and more than 8 percent.
    • Gravel is marked "NOT APPLICABLE."
    • The regulation states that these setbacks apply to all individual on-site wastewater disposal systems except spray-irrigation disposal and overland discharge.
    • This is an on-site-wastewater setback, not a statewide zoning setback for the dwelling or other structures.

    minimum distance from water edge: 50 feet (Aggregate systems in coarse sand, medium sand, fine sand, loamy sand, sandy loam, light loam, heavy loam, silt loam, sandy clay loam, light clay loam, heavy clay loam, light silty clay loam, heavy silty clay loam, sandy clay, silty clay, and clay; both slope categories shown in Table 1.)

    “TABLE 1 - SETBACK REQUIREMENTS FROM SENSITIVE WATER (Aggregate Systems) Minimum Distance from the Water Edge [...] Coarse Sand 50 feet 50 feet”
  • Living in an RVLimited

    RVs at a hunting camp where the camp uses the Mississippi Department of Health on-site wastewater application process.

    • The camp is treated by MSDH as a residential application.
    • Three or more trailers, cabins, or RVs on the property must be applied for as a commercial development.
    • For a permanent water meter, state law requires a permanent sewage-disposal solution; it may be a sewer line or septic system. If public sewer is unavailable, the applicant must apply to MSDH for the required paperwork.
    • Local jurisdictions have separate land ordinances; this claim does not establish a statewide land-use permission for RV occupancy.

    trailers/cabins/RVs triggering commercial-development application: >= 3 units (On the hunting-camp property.)

    “Yes. This is considered a residential application with us. If there will be three (3) or more trailers/cabins/RVs on the property, this will need to be applied for as a commercial development.”
  • Tiny homesLimited

    A tiny house or home intended for use as a residential dwelling that is within the State Fire Marshal's factory-built-home regulation.

    • The defined tiny house or home ranges from 80 to less than 400 square feet and may or may not be constructed on a chassis with or without axles or wheels.
    • If intended as a residential dwelling, it is treated as a modular home for design and construction requirements and must comply with the most current residential building code adopted by the Mississippi Building Codes Council.
    • When designed for permanent installation at its final destination, it must be installed on an approved foundation complying with the manufacturer's installation guidelines concerning manufacturing-facility and retail-entity licensure and occupant-safety installation standards.
    • The amended regulation superseded prior versions and became effective July 1, 2026.
    • Counties and municipalities may regulate zoning, utility connections, foundations, and permits for modular homes; local land-use controls may therefore add requirements.

    tiny-home floor area: 80 to less than 400 square feet (Definition in Rule 3.01.3(42).)

    ““Tiny House or Home”: Any closed structure, building assembly or systems of assemblies designed for use as a residential dwelling and ranging from 80 to less than 400 square feet in size, which may or may not be constructed on a chassis (with or without axels or wheels).”
  • Manufactured homesLimited

    Occupation of Factory-Built homes, including manufactured homes, sited anywhere in Mississippi and installed on or after July 1, 2009.

    • The home must undergo inspection under the Mississippi Inspection Program before occupation.
    • The inspection is conducted by an inspector assigned by the State Fire Marshal’s Office to verify compliance with the manufacturer’s published installation instructions and Mississippi Installation Standards.
    • The retailer/developer and/or installer/transporter must submit a Property Locator/Certificate of Installation Form certifying compliant installation.
    • For new or used residential homes involving a retailer, the form and required photographs must be submitted within three business days after installation and before porches, decks, or skirting are installed.
    • For secondary sitings without a retailer, the installer/transporter must submit the form and required photographs within three business days after installation and before porches, decks, or skirting are installed.
    • All necessary state-law or local-authority-having-jurisdiction permits must be obtained before installation.
    • Inspection fees are paid by the installer/transporter, developer, or retailer, not the purchaser; failure to pay an invoice within 45 days is a regulatory violation.
    • Factory-Built homes designated and properly certified not to be used for human habitation, such as hunting/fishing camps or storage, are excepted from the human-habitation installation requirements.

    installation inspection applicability date: 2009-07-01 · current regulation effective date: 2026-07-01 · certificate submission deadline: <= 3 business days after installation (Must also be before installation of porches, decks, or skirting; secondary sitings without a retailer follow the installer/transporter rule.) · inspection scheduling window: 7 to 10 business days after receipt of Property Locator/Certificate of Installation (May be adjusted for Division resource and manpower shortages.) · inspection invoice payment deadline: <= 45 days from invoice date (Nonpayment is a violation and numerous unpaid invoices may delay or deny license issuance.)

    “Beginning July 1, 2009, every Factory-Built home that is sited within the State of Mississippi shall be subject to inspection under the MS Inspection Program prior to occupation.”
  • Who permits septicState

    Individual onsite wastewater systems, recreational vehicle campgrounds/lodging parks, septage pumpers/haulers, and individual water supplies serving Amite County.

    • Amite County is listed in the MSDH South Region.
    • Local ordinances may affect an MSDH application.
    “The On-site Wastewater program develops policy and regulations [...] South Region Adams, Amite, Covington”
    2 more reviewed findings on this topic
    • State (with conditions) — Residential and commercial onsite wastewater systems and related inspections in Amite County.
      “The On-site Wastewater program develops policy and regulations and provides technical assistance to regional environmentalists in designing and inspecting Individual On-site Wastewater Disposal Systems (IOWDS), recreational vehicle campgrounds/lodging parks, septage pumpers/haulers and individual water supplies.”
    • Mixed — Statewide individual onsite wastewater disposal systems; the Mississippi State Department of Health establishes the rules and the appropriate county Department of Health performs local inspections.
      “Notify the Department at least 48 hours before beginning construction if acting as the Certified Installer of an Individual On-site Wastewater Disposal System and, at that time, schedule a time for inspection of the system with the appropriate county Department of Health.”
  • Septic permitRequired

    Design, construction, or installation of an individual on-site wastewater disposal system in Mississippi.

    • MSDH approval is required except for the statutory exemption in Mississippi Code Section 41-67-6(7).
    • For a two-acre-or-larger lot or tract, approval requirements are exempt only if all wastewater is contained on the lot or tract, no Mississippi or United States watercourse is impacted, and the installer submits a signed affidavit attesting to those conditions.
    • An individual on-site wastewater disposal system is acceptable only where centralized treatment is unavailable or infeasible, existing area disposal systems function satisfactorily, site conditions are satisfactory for underground absorption, private-water-supply separation/protection requirements are met, and applicable water-quality requirements are met.
    • Construction or installation designed by a certified professional evaluator or licensed professional engineer may not begin before Department authorization.

    statutory approval-exemption lot size: >= 2 acres (All wastewater must be contained on the tract, no covered watercourse may be impacted, and an installer affidavit is required.) · private water supply separation from IOWDS: >= 50 feet (Private supply must be at a higher elevation or properly protected.) · private water supply separation from disposal field: >= 100 feet

    “Approval of the design, construction or installation of an individual on-site wastewater disposal system by the department is required, except as otherwise provided in Section 41-67-6(7).”
    2 more reviewed findings on this topic
    • Required — Installation of an onsite wastewater disposal system in Amite County.
      “The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
    • Required — Installation of an onsite wastewater disposal system and obtaining a permanent water meter in Amite County.
      “The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
  • Septic inspectionLimited

    Installation of an individual on-site wastewater disposal system in Mississippi.

    • For the ordinary Notice-of-Intent and Final-Approval process, the certified installer must contact MSDH 24 hours before construction to schedule an inspection.
    • A two-acre exemption applicant receives a site evaluation and disposal-system recommendation, but MSDH does not inspect during installation.
    • For the two-acre exemption, the Department reserves the right to inspect an installed system after it has been in use for more than 30 days.
    • Final approval requires the installer affidavit; advanced treatment systems also require the property owner's maintenance affidavit.

    advance notice before construction: >= 24 hours (Certified installer must contact the Department to schedule inspection.) · two-acre-exemption post-use inspection threshold: > 30 days (MSDH reserves the right to inspect systems on properties that filed a two-acre exemption.)

    “The Department reserves the right to inspect installed systems after they have been in use for more than thirty (30) days on properties that have filed a two-acre exemption.”
    2 more reviewed findings on this topic
    • Limited — Inspection of onsite wastewater installations and existing residential systems in Amite County.
      “Do you wish for the Department to inspect the installation”
    • Required — New individual onsite wastewater disposal systems in Amite County.
      “The Certified Installer is responsible for contacting the Department 24 hours BEFORE beginning construction to schedule an inspection.”
  • Off-grid sanitationLimited

    Off-grid residential wastewater disposal in Amite County.

    • Mississippi does not recognize gray water.
    • Wastewater must be piped to a central sewer system or septic system; discharge to ground, ditches, or bodies of water is not allowed.
    • A permitted septic system may provide an off-grid sanitation route where public sewer is unavailable.
    “Mississippi does not recognize gray water. Anything that could be considered gray water in other states is classified as wastewater in Mississippi. All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
    One more reviewed finding on this topic
    • Limited — Off-grid wastewater disposal and temporary sanitation in Amite County.
      “Mississippi does not recognize gray water.”
  • Well permitLimited

    Groundwater withdrawal permits for water wells in Mississippi.

    • A groundwater withdrawal permit is required for water wells with surface casing diameters of 6 inches or greater.
    • Some exclusions apply.
    • A separate contractor licensing requirement generally applies, but a landowner may drill without a Water Well Contractor license for a single-family permanent residence or farm livestock use if applicable construction standards are followed.
    • Wells with surface casing diameters below 6 inches may still be regulated by the Mississippi State Department of Health when part of a public water system.

    surface casing diameter threshold: >= 6 inches (Some exclusions apply.)

    “State law requires that you obtain a groundwater withdrawal permit for water wells with surface casing diameters 6-inches or greater in diameter. Some exclusions apply to this requirement.”
    One more reviewed finding on this topic
    • Limited — Groundwater withdrawal and water-well activity in Amite County where a Mississippi Water Use Permit applies.
      “This form is to be filed with the Office of Land and Water Resources (OLWR) before the well is drilled;”
  • Mandatory utility hookupConditional

    Public water connections and connection to centralized wastewater treatment systems for residences, buildings, and facilities in Mississippi.

    • A public water utility may not connect water service without prior written Department approval certifying that the sewage treatment and disposal plan complies with state law.
    • Water utility connections may be made during construction only if the Department approved the sewage plan and the owner agreed to inspection and approval before use or occupancy.
    • Where centralized wastewater treatment is constructed and becomes available, onsite systems must be abandoned and residences, buildings, or facilities connected to the centralized system.
    • Temporary onsite systems may be used only under the stated 36-month centralized-treatment conditions.

    centralized wastewater availability deadline: 36 months (The developer must sign a written agreement to connect when available and install internal sewage collection to the connection point.)

    “Where a Centralized Wastewater Treatment System is available, all places shall have a properly constructed connection to the centralized wastewater treatment system which all human excreta and other liquid waste shall be disposed”
    2 more reviewed findings on this topic
    • Conditional — Permanent water utility connection for residential property in Amite County.
      “State law requires you have permanent sewage disposal solution available to receive a permanent water meter. Permanent sewage disposal solutions can be a sewer line or septic system. You must have a sewer option before a water utility can make a connection to your property.”
    • Conditional — Permanent water utility connection for residential property in Amite County.
      “State law requires you have permanent sewage disposal solution available to receive a permanent water meter. Permanent sewage disposal solutions can be a sewer line or septic system. You must have a sewer option before a water utility can make a connection to your property.”
  • Agricultural exemptionAvailable

    Applicability of Mississippi Code Title 73, Chapter 59 residential-builder and remodeler licensing requirements.

    • The cited exemption applies to the Residential Builders and Remodelers chapter.
    • It covers agricultural buildings, buildings used for agricultural purposes, buildings constructed as a community effort, and tenant houses.
    • The source does not establish an exemption from independently applicable local permits, zoning, floodplain rules, or wastewater requirements.
    “This chapter shall not apply to: (a) Agricultural buildings, buildings used for agricultural purposes, buildings constructed as a community effort, or tenant houses;”
  • Subdividing landRegulated (with conditions)

    Mississippi State Department of Health review of subdivision land divisions for onsite-wastewater suitability; this does not establish that MSDH approves the general land-use plat or replaces county or municipal plat review.

    • A subdivision is defined for this review as land divided into ten (10) or more lots, tracts, sites, or parcels for residential development.
    • Local or county ordinances may reduce the ten-lot threshold.
    • If public water will be used, the Bureau of Public Water Supply may require subdivision review regardless of lot count.
    • Developments of 35 or more lots and additional phases by the same owner require a feasibility study; developments under 35 lots may be required to obtain one case-by-case.
    • No lots may be sold or construction started before evaluation.
    • The subdivision plan-review fee is $325 plus $6.50 per lot; online payment is subject to a processing fee and fees may change.
    • The plan review is voided if the developer alters the plat without notifying MSDH; MSDH determines whether a new review is required.
    • MSDH reviews lots for general suitability of onsite wastewater treatment and disposal for one residence per lot; septic, soil, wetland, water-supply, and other health requirements remain applicable.

    residential subdivision threshold: >= 10 lots (Local ordinances may reduce the minimum below ten lots.) · feasibility-study threshold: >= 35 lots (Additional phases by the same owner also require a feasibility study; smaller developments may be required case-by-case.) · subdivision plan-review fee: 325 USD (Plus $6.50 per lot; online payment processing fee and possible additional costs may apply.)

    “All lots are reviewed for general suitability of on-site wastewater treatment and disposal for a single residence per lot.”
    One more reviewed finding on this topic
    • Regulated (with conditions) — Onsite wastewater review for subdivisions involving Amite County property.
      “Subdivision is currently $325 + $6.50/lot”
  • Driveway accessRequired

    Driveways and specified changes of use connecting to Mississippi state highways.

    • A permit is required for new driveways.
    • A permit is required for alterations to existing drives.
    • A permit is required for a change of use causing a daily-trip increase of 10% or 100 daily trips, whichever is greater.
    • A permit is required for property-use changes from non-commercial to commercial.
    • If access is expected to exceed 100 peak-hour trips, a traffic-impact study must be submitted.
    • If the permitted land use changes, the original permit is revoked and a new permit must be applied for.
    • A denied permit may be appealed within 10 days after receipt of the denial notification.

    daily trip increase threshold: 10 percent (or 100 daily trips, whichever is greater) · traffic impact study threshold: > 100 peak-hour trips · appeal deadline: 10 days (after receipt of denial notification)

    “For State Highways a permit is required for: 1. New driveways; 2. Alterations to existing drives;”
  • Campground & park staysLimited

    Recreational-vehicle occupancy at campgrounds under the jurisdiction of the Pearl River Valley Water Supply District, including Coal Bluff, Goshen Springs, Leake County Water Park, Low Head Dam, and Timberlake.

    • The rules apply within all campgrounds under the District’s jurisdiction.
    • Campgrounds are not intended to be permanent domiciles for campground guests.
    • A recreational vehicle must be in operable road-worthy condition, properly registered and insured in its domicile state or province, with a current license plate affixed.
    • Campers may not stay on any pad longer than 12 consecutive months; Standard Plus campers may move to another available pad after 12 months, but the District is not responsible for making a pad available.
    • Campsites are typically designed for trailers or recreational vehicles no longer than 32 feet or wider than 8 feet, subject to the stated RVIA-seal, holding-tank, facility-capacity, and prohibited-unit conditions.
    • Primitive camping areas without water, electricity, or sewer are not intended for recreational vehicles.
    • No permanent structures may be erected on a campsite; temporary accessibility stairs, stoops, steps, or ramps require the stated approvals and size limits.
    • Camping is confined to designated campground or overflow areas, and no more than one camping unit is allowed per pad without Campground Manager approval.

    maximum stay on one pad: <= 12 consecutive months (Campers may move to a different available pad after 12 months.) · typical campsite RV length: <= 32 feet (Larger units may be accepted if they satisfy the stated RVIA seal, holding-tank, and facility-capacity conditions.) · typical campsite RV width: <= 8 feet (Larger units may be accepted if they satisfy the stated RVIA seal, holding-tank, and facility-capacity conditions.)

    “Campers shall not stay on any pad longer than 12 consecutive months”
    One more reviewed finding on this topic
  • county building authorityGeneral

    Mississippi county boards of supervisors' authority and obligation to adopt uniform building codes, including in unincorporated county territory, subject to the statutory opt-out framework.

    • All counties and municipalities must enact uniform building codes unless they opted out before November 30, 2014.
    • A county board of supervisors adopting building codes after July 1, 2008 must adopt as minimum codes codes established and promulgated by the Mississippi Building Codes Council.
    • The statewide source does not identify current county-by-county residential permit enforcement or opt-out status.

    opt-out deadline: 2014-11-30 · minimum-code requirement for codes adopted after: >= 2008-07-01

    “Under Senate Bill 2378 of 2014, all counties and municipalities must enact uniform building codes unless they opt out prior to Nov. 30, 2014.”

Inside cities and towns in Amite County

Municipal rules found while researching the county. They apply inside that city or town, not to unincorporated land.

  • Local zoningPresent (with conditions)

    Land-use planning and zoning within the Town of Centreville, a municipality located partly in Amite County.

    • The Town of Centreville Planning & Zoning Commission reviews proposed amendments to zoning ordinances, site plans and plat applications.
    • The Commission makes recommendations to the Town Council regarding current and future development.
    • The source does not establish the precise geographic extent of Centreville within Amite County or provide the ordinance's dimensional standards, district rules, fees, or exceptions.
    “The Planning & Zoning Commission reviews proposed amendments to zoning ordinances, site plans and plat applications, and also makes recommendations to the Council regarding the current and future development of the Town of Centreville.”
    One more reviewed finding on this topic
    • Present (with conditions) — Planning, zoning, site-plan, plat-review, code-enforcement, and land-development-code administration within the Town of Centreville, Mississippi.
      “The Code Enforcement Division helps to protect the Town of Centreville public’s well-being and enhance the quality of life by enforcing the health, safety, zoning and sanitation codes. Please check back; we will be adding more information soon.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • County-wide zoning — Countywide zoning in unincorporated Amite County
  • Zoning districts — Published zoning districts or zoning maps for Amite County.
  • Minimum dwelling size — Minimum dwelling size in unincorporated Amite County
  • Minimum lot size — Minimum lot size in unincorporated Amite County
  • Lot coverage — Lot coverage in unincorporated Amite County.
4 more unanswered
  • Building height
  • Camping on your land
  • Accessory dwellings
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Amite County, Mississippi

Is Amite County a good place to live off-grid or homestead?

Amite County scores 75/100 on the Bolthole Index, a strong county profile. Its strengths: manageable long-term carry cost and sparse surroundings — about 5,249 people within a 30-minute drive. Watch-outs: a weaker property-autonomy legal backdrop.

How much does land cost in Amite County, Mississippi?

Land in Amite County runs about $3,315 per acre, based on the latest county data.

What is the water situation in Amite County?

Amite County gets about 62.7" of rain a year, with severe drought in roughly 6.2% of years.

How remote is Amite County?

A representative private-land location has about 5,249 people within a 30-minute drive and 1,974,757 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Amite compares in Mississippi