Bolthole Index

Stoddard County, Missouri

Building permits, zoning and septic rules in Bloomfield, Missouri

Bloomfield, Missouri requires a building permit before constructing, adding to or locating a building inside city limits; applications go to the City Clerk at City Hall.1 Bloomfield requires at least 600 square feet for any habitable structure, but we could not confirm the city’s zoning districts.2 For private sewage disposal, Bloomfield requires Missouri health approval; DHSS lists itself as Stoddard County’s onsite wastewater authority, so confirm the city-address process with DHSS and the City Clerk.34

At a glance

Building permit
Required before construction, additions or placement of a building; apply to the City Clerk1
Building permit fee
$20 upon approval5
Zoning and setbacks
We could not confirm zoning districts or numeric setbacks; ask the City Clerk for parcel requirements1
Minimum home size
At least 600 square feet for any habitable structure inside city limits2
Septic approval
Missouri health approval for private sewage disposal; confirm the city-address permit process with DHSS34
RV living
We could not confirm general RV occupancy or temporary camping rules; ask the City Clerk before planning a stay1
Floodplain development
Separate city floodplain development permit in regulated areas; Water Superintendent administers the program6

Who to call

Building permits

Bloomfield City Clerk — Building Permits

Building permit applications and issuance at City Hall; ask for parcel-specific zoning and setback requirements.

Also useful

Bloomfield City Hall

City Hall contact for reaching the City Clerk and Water Superintendent.

(573)568-3464

Floodplain permits

Bloomfield Water Superintendent — Floodplain Administrator

City floodplain development applications and approval.

Septic permits

Missouri Department of Health and Senior Services, Onsite Wastewater Treatment Program

DHSS onsite wastewater construction permitting contact for Stoddard County; confirm the process for an address inside Bloomfield.

573-751-6095

[email protected]

PO Box 570, Jefferson City, MO 65102-0570

Online permits →

Contact details are copied from each office’s official page and were checked against it on October 12, 2026.

Off-grid gear

Going off-grid in Bloomfield means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Bloomfield, MO?

Bloomfield requires a building permit before constructing or erecting a building, adding an addition, or placing a relocated or preconstructed building on land inside city limits.1 Bloomfield’s building permit fee is $20 after approval.5 The city inspector must inspect the premises within 7 days after the application is filed and approve or disapprove the application.7

Bloomfield has adopted the BOCA Basic Building Code of 1970, Fifth Edition, along with housing, plumbing, electrical and fire standards.8 Ask the City Clerk which adopted standards and later amendments apply to your proposed work before ordering plans.9 We could not confirm a city owner-builder exemption or certificate-of-occupancy procedure; ask the City Clerk about both before scheduling construction.9

Who issues building permits in Bloomfield, and how do you apply?

The Bloomfield City Clerk receives building permit applications at City Hall and issues approved building permits.10 Call Bloomfield City Hall at (573)568-3464 to reach the City Clerk.11 The application must include the applicant’s name and address, the structure’s location and a drawing showing property lines relative to the structure.10

Bloomfield prohibits placing a building, structure or addition over a city-maintained sewer or water line or on a city-owned easement.1 Mark those constraints on your proposed layout and ask the City Clerk to confirm the location before committing to a foundation.1 A public-sewer connection has its own written permit from the City Clerk for each house or building, with plans, specifications or an acceptable written description.10

Does Bloomfield have zoning, and can you build a tiny home?

We could not confirm Bloomfield’s operative zoning districts, district map or numeric lot-size and setback schedule; ask the City Clerk for the rules applying to your parcel.9 Bloomfield’s building-permit provision requires compliance with any city setback ordinance and other city code or zoning ordinance.1

Bloomfield requires at least 600 square feet for any structure to be habitable within city limits, so a smaller habitable tiny home would not meet that requirement.2 Meeting the area threshold does not remove Bloomfield’s building permit requirement for constructing or placing a building.21 We could not confirm general RV occupancy, temporary camping, manufactured-home occupancy or accessory-dwelling rules; describe the proposed use to the City Clerk and request the applicable ordinance before buying a unit.9

How do septic permits and sewer connections work inside Bloomfield?

For a Bloomfield residence or building without water-carried sewerage, the city requires a sanitary pit privy or another sanitary excreta-disposal method approved by Missouri’s Division of Health.3 Missouri DHSS lists itself as Stoddard County’s onsite wastewater authority, but confirm the permitting arrangement for your Bloomfield address with DHSS and the City Clerk.49

Most onsite wastewater installations or repairs require a construction permit; residential property under 3 acres requires one under the state rule, and any claimed exemption must be confirmed before work begins.12 DHSS application fees for onsite sewage construction, modification and repair are temporarily suspended effective August 28, 2026; the suspension does not remove the permit requirement.1312

For city sewer, Bloomfield lists a $75 connection permit fee per house or building, including tapping and connection, plus a separate $25 sewer application fee for premises not connected to the city sewer system.5 Ask the City Clerk which connection charges apply to the parcel.9

What are the steps to building a home in Bloomfield?

Start with a parcel drawing rather than a construction date: Bloomfield’s building application requires property lines and the proposed structure location.10

  • Ask the City Clerk for parcel-specific setbacks, easements and allowable use before finalizing the layout; Bloomfield bars structures over city utility lines and city easements.1
  • Size a proposed habitable structure to meet Bloomfield’s minimum of 600 square feet.2
  • Ask the Water Superintendent whether the site needs a separate floodplain development permit before construction or other development.6
  • Arrange the city sewer-connection permit, or obtain the applicable private wastewater permit or confirmed exemption before onsite wastewater work.1012
  • File the building application with the City Clerk; the inspector must inspect within 7 days, and an approved permit is issued after the $20 fee is paid.10

What should you check before buying land in Bloomfield?

Bloomfield’s Water Superintendent administers city floodplain development approval; regulated areas require a separate permit for each structure or other development, including manufactured-home placement.6 Ask that office to review the proposed site before treating a vacant parcel as ready to build.14

Stoddard County’s soil ratings show only 6.6% of soils rated “not limited” for conventional septic drain fields; that county-wide figure supports a site evaluation, not a conclusion that septic is impossible on a Bloomfield lot.15 Missouri requires a permit for driveway construction or modification on MoDOT right-of-way; we could not confirm a separate Bloomfield driveway-access procedure.16 Ask the City Clerk about city access requirements.9

For a parcel outside Bloomfield city limits, consult the Stoddard County guide for the county’s answer; Missouri’s county zoning authority applies to unincorporated territory.17

Watch-outs

  • Bloomfield’s 600-square-foot minimum applies to any habitable structure; ask the City Clerk about RV occupancy separately before planning to live on the parcel during construction.29
  • Bloomfield’s building permit and public-sewer connection permit are separate approvals, and private sewage disposal requires Missouri health approval.103
  • DHSS’s temporary septic application fee suspension does not authorize installation or repair before a permit or confirmed exemption.1312

Sources

  1. Section 500.080 Permits Required (Bloomfield), quoted and re-checked
  2. Section 500.075 Square Feet Requirements (Bloomfield), quoted and re-checked
  3. Sections 700.050 and 700.060 Sewage Disposal (Bloomfield), quoted and re-checked
  4. OWTS Construction Permit Process — Stoddard County, quoted and re-checked
  5. Section 500.080 Permits Required (Bloomfield), quoted and re-checked
  6. Section 410.040 Lands to Which Chapter Applies (Bloomfield), quoted and re-checked
  7. Section 500.080 Permits Required (Bloomfield), quoted and re-checked
  8. Chapter 500, Article I: Adoption of Standards (Bloomfield), quoted and re-checked
  9. Bloomfield City Clerk — Building Permits (ecode360.com)
  10. Section 500.080 Permits Required (Bloomfield), quoted and re-checked
  11. Bloomfield City Hall (cityofbloomfield.info)
  12. OWTS Construction Permit Process, quoted and re-checked
  13. OWTS Construction Permit Process — Temporary Permit Fee Suspension, quoted and re-checked
  14. Bloomfield Water Superintendent — Floodplain Administrator (ecode360.com)
  15. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  16. Permits | Missouri Department of Transportation (Missouri statewide rule), quoted and re-checked
  17. RSMo § 64.090 — Planning and zoning powers of county commission (Missouri statewide rule), quoted and re-checked

Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Bloomfield

Bloomfield’s own rules

  • Building permitRequired

    Constructing, erecting, adding an addition to, or locating a building on real estate within Bloomfield city.

    • Application is made at the City Clerk's office at City Hall.
    • The application must state applicant name and address, structure location, and include a drawing showing property lines in relation to the structure.
    • No building, structure, or addition may be placed over a city-maintained sewer or water line or city easement.
    • The structure must comply with any city setback ordinance and other city code or zoning ordinance.
    • Unpermitted construction is subject to prosecution and a $50 to $500 fine; every day is a separate offense.

    building permit fee: 20 USD

    “required to obtain a building permit prior to constructing”
  • Building code adoptedAdopted

    Building construction, erection, repair, removal, demolition, use, and occupancy within Bloomfield city.

    • The adopted text is The BOCA Basic Building Code of 1970, Fifth Edition.
    • The same section separately adopts the Basic Housing Code, BOCA Basic Plumbing Code, National Electrical Code ANSI C1-1971, and BOCA Fire Prevention Code, Second Edition, 1970.
    “its provisions are hereby adopted in their entirety.”
  • InspectionsRequired

    Applications for building permits in Bloomfield city.

    • The inspector must inspect the premises within seven days after the application is filed.
    • The inspector approves or disapproves the application for issuance of the building permit.

    inspection deadline: <= 7 days (after filing the building permit application)

    “inspector shall inspect the premises within seven (7) days”
  • Minimum dwelling sizeSpecified

    Any habitable structure within Bloomfield city limits; no district limitation is stated in the cited section.

    • The requirement applies to any structure to be habitable within the city limits.
    • The ordinance is identified as Ordinance No. 2024.21 dated October 31, 2024.

    minimum habitable structure area: >= 600 square feet

    “The minimum square feet for any structure to be habitable within the City limits of Bloomfield, Missouri, shall be six hundred (600) square feet.”
  • Off-grid sanitationLimited

    Sanitation for residences or buildings inside Bloomfield city without a water-carried sewerage system.

    • A sanitary pit privy or other sanitary excreta-disposal method approved by the Division of Health of Missouri must be installed.
    • Other disposal of sewage is unlawful under the city code.
    “In case a residence or building is not provided with a water-carried sewerage system, a sanitary pit privy, or other sanitary method of excreta disposal approved by the Division of Health of Missouri shall be installed.”
  • Building in a floodplainRequired

    Construction or other development, including manufactured-home placement, in Bloomfield city areas identified as unnumbered A Zones on the FIRM or FHBM dated August 5, 1986, as amended, and future revisions.

    • A separate floodplain development permit is required for each structure or other development.
    • The Water Superintendent is the Floodplain Administrator.
    • The application must be written and identify the land, work, intended occupancy, assessed and fair-market values, base-flood and proposed elevations, and include plans/specifications and an authorized signature.
    “A floodplain development permit shall be required for all proposed construction or other development”
  • Permit feesPublished (with conditions)

    Bloomfield city building permits and sewer-connection permits.

    • Building permit fee is $20 upon approval.
    • Sewer-connection permit fee is $75 per house or building and includes tapping and making the public-sewer connection.
    • A separate sewer application fee of $25 also applies to premises not connected to the city's sewer system.
    • Water connection fees are $450 for service lines no larger than one inch and $600 plus additional material costs for larger lines.

    building permit fee: 20 USD · sewer connection permit fee: 75 USD (per house or building; includes tapping and connection to public sewer) · sewer application fee: 25 USD (for premises not connected to the city sewer system)

    “If the application is approved for the issuance of a building permit, the City Clerk shall issue the building permit to the applicant upon the payment of twenty dollars ($20.00).”
  • Permit processPublished (with conditions)

    Building permits and sewer-connection permits inside Bloomfield city.

    • Building permit applications go to the City Clerk at City Hall.
    • Building applications require applicant identity/address, site address, and a property-line drawing.
    • The inspector acts within seven days of filing.
    • An approved building permit is issued after payment of $20.
    • Sewer connections require a written permit from the City Clerk, a separate permit for each house or building, an application, and plans/specifications or an acceptable written description.
    • The sewer application is retained as a permanent city record.

    building inspection response period: <= 7 days (after building permit application filing) · building permit fee: 20 USD · sewer connection permit fee: 75 USD (per house or building)

    “The application shall state the name and address of the person or entity applying for the permit, the address of the location where the structure is to be erected or placed and a drawing showing the property lines in relation to the location of the structure.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Bloomfield or Stoddard County directly.

  • Owner-builder exemption — Owner-builder exemption from Bloomfield city building requirements.
  • Certificate of occupancy — Certificate-of-occupancy requirements for buildings inside Bloomfield city.
  • Local zoning — Land inside Bloomfield city limits.
  • Zoning districts — Zoning districts and district schedules inside Bloomfield city.
  • Minimum lot size — Minimum lot size inside Bloomfield city.
15 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic permit
  • Septic inspection
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Bloomfield publishes no rule on the point, not that none exists. Stoddard County’s page lists the county offices to call.

← All of Stoddard County: county rules, score and offices