Pagedale, Missouri (St. Louis County) adopts and enforces its own zoning in Chapter 405 of the city code1. Building permits and inspections inside city limits come from the St. Louis County Department of Public Works under an agreement with the city2, while the city issues the certificate of occupancy3. We could not confirm who issues septic permits inside Pagedale; ask the St. Louis County Department of Public Health.
At a glance
- Zoning
- Yes, Pagedale's own Chapter 405, with four districts (A, B, C, D)1
- Building permit
- Required; issued by St. Louis County Public Works under an agreement with the city2
- Certificate of occupancy
- Required; issued by the city building commissioner, $15 fee34
- Single-family lot (A district)
- At least 4,000 sq ft and 45 ft wide5
- Front setback (A district)
- At least 30 ft to the building line6
- Septic
- Not confirmed inside city limits; county Department of Public Health is the listed county authority7
- Floodplain
- Development permit required in mapped A and AE zones8
Who to call
Building permits
City of Pagedale City Hall (Code Enforcement and Permits)
Zoning, certificates of occupancy and floodplain development permits inside Pagedale
1420 Ferguson Avenue, St. Louis, MO 63133
Septic permits
St. Louis County Department of Public Health
County public health office listed by the state as a septic ordinance authority for St. Louis County
6121 North Hanley Road, Berkeley, MO 63134
Contact details are copied from each office’s official page and were checked against it on October 23, 2026.
Off-grid gear
Going off-grid in Pagedale means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Pagedale, MO have zoning, and what does it mean for lots and setbacks?
Yes. The City of Pagedale adopts and administers its own zoning regulations, and the city is divided into four districts: A residence, B four-family, C commercial and D industrial1. The district map is on file with the city clerk rather than published online9.
In the A residence district, a single-family dwelling needs a lot of at least 4,000 square feet, and a lot of record that existed when the code passed may hold one single-family home5. The minimum lot width is 45 feet5. A home in the A district needs a front yard of at least 30 feet, a rear yard of at least 40 feet, and interior side yards of at least 4 feet6. Buildings top out at 35 feet, except churches10.
Pagedale has no agricultural or rural-residential district in its zoning article5. This is a small-lot urban city, not acreage land.
Do you need a building permit in Pagedale, and who issues it?
Yes. Inside Pagedale city limits, the St. Louis County Department of Public Works issues building permits and carries out inspections under an agreement with the city, so the authority is the county, not the city211. Pagedale adopted the 2015 International Code Council model building codes12.
The city still has a step of its own. Where city rules are more restrictive than the county codes, or involve zoning, the city must approve plans before they go to the county for a permit2. Building permit and certificate-of-occupancy applications need a drawing or plat in duplicate showing the building location and dimensions13.
The city building commissioner issues the certificate of occupancy, which costs $1534. For a new building it must be applied for before excavation for the foundation begins13. We could not find the county's building permit fee schedule for Pagedale4.
How do septic permits work inside Pagedale?
We could not confirm who issues septic permits inside Pagedale city limits; the city's health and sanitation chapter was not confirmed to address the question. Across St. Louis County, Missouri's state health agency lists both the county plumbing department and the St. Louis County Department of Public Health as septic ordinance authorities, and notes that incorporated areas may be handled differently7.
Statewide, a construction permit is required before installing or repairing most onsite wastewater systems, and work should not start until a permit is issued or an exemption is confirmed14. Application fees are temporarily suspended from August 28, 202614. Call the15 before planning any septic work, and ask the city whether a sewer connection is available, since we could not confirm whether public sewer connection is required in Pagedale.
Can you live in an RV or tiny home in Pagedale?
We could not confirm any rule on tiny homes or on living in an RV on a residential lot in Pagedale, so ask the city's Code Enforcement and Permits office before buying a lot for either. The one RV rule we found applies only in mapped flood hazard areas: an RV there must be on site fewer than 180 consecutive days, be fully licensed and ready for highway use, or meet the manufactured-home elevation and anchoring requirements16. Manufactured homes in those flood zones must be elevated and anchored17.
The A district allows accessory buildings customarily incident to a home, including servant quarters and one private garage, as long as no business is conducted18. Accessory buildings may cover no more than 20% of the required rear yard and must sit at least 3 feet from any lot line6.
Building a home in Pagedale: the steps, in order
- Confirm the lot's zoning district with the city clerk, since the district map is on file there9.
- Check the lot against flood maps; land in A and AE zones needs a floodplain development permit from the city8.
- Get city plan approval for zoning compliance before submitting to the county2.
- Apply to St. Louis County Public Works for the building permit, with a drawing or plat in duplicate213.
- Apply to the city for the certificate of occupancy before excavation begins13.
- Pass the county inspections the adopted codes require11.
What stays with St. Louis County, and what to check before you buy in Pagedale
Building permits and inspections inside Pagedale run through the county under the city's agreement2. The county's own residential rules, including its building code and zoning review, are written for unincorporated St. Louis County and do not replace Pagedale's zoning; see the St. Louis County page for land outside the city19.
Before buying, check flood status, septic or sewer service, and the city's zoning. Floodplain lots carry the city's development permit requirement8. St. Louis County's effective property tax rate is 1.2%20, and a typical county home is valued at about $293,45821.
Watch-outs
- We could not confirm who issues septic permits inside Pagedale city limits, whether sewer connection is required, or what rules apply to tiny homes, camping or minimum home size; ask the Pagedale city clerk and the St. Louis County Department of Public Health7.
- Zoning approval in Pagedale comes from the city, but the building permit comes from St. Louis County, so budget for two offices and a plan approval step in between2.
- Pagedale's zoning district map is not posted online; request it from the city clerk before assuming a lot's district9.
Sources
- City of Pagedale, MO Table of Contents (eCode360) (Pagedale), quoted and re-checked
- Chapter 500 Article I: Building Codes and Regulations (County Codes) (City of Pagedale, MO eCode360) (Pagedale), quoted and re-checked
- Chapter 405 Zoning Regulations, Article V: Building and Occupancy Permits (City of Pagedale, MO eCode360) (Pagedale), quoted and re-checked
- Chapter 405 Zoning Regulations, Article V: Building and Occupancy Permits (City of Pagedale, MO eCode360) (Pagedale), quoted and re-checked
- Chapter 405 Zoning Regulations, Article II: Districts and District Regulations (City of Pagedale, MO eCode360) (Pagedale), quoted and re-checked
- Chapter 405 Zoning Regulations, Article II: Districts and District Regulations (City of Pagedale, MO eCode360) (Pagedale), quoted and re-checked
- OWTS Construction Permit Process — St. Louis County authorities, quoted and re-checked
- Chapter 415 Floodplain Management (City of Pagedale, MO eCode360) (Pagedale), quoted and re-checked
- Chapter 405 Zoning Regulations, Article II: Districts and District Regulations (City of Pagedale, MO eCode360) (Pagedale), quoted and re-checked
- Chapter 405 Zoning Regulations, Article II: Districts and District Regulations (City of Pagedale, MO eCode360) (Pagedale), quoted and re-checked
- Chapter 500 Article I: Building Codes and Regulations (County Codes) (City of Pagedale, MO eCode360) (Pagedale), quoted and re-checked
- Chapter 500 Article I: Building Codes and Regulations (County Codes) (City of Pagedale, MO eCode360) (Pagedale), quoted and re-checked
- Chapter 405 Zoning Regulations, Article V: Building and Occupancy Permits (City of Pagedale, MO eCode360) (Pagedale), quoted and re-checked
- OWTS Construction Permit Process (Missouri statewide rule), quoted and re-checked
- St. Louis County Department of Public Health (stlouiscountymo.gov)
- Chapter 415 Floodplain Management (City of Pagedale, MO eCode360) (Pagedale), quoted and re-checked
- Chapter 415 Floodplain Management (City of Pagedale, MO eCode360) (Pagedale), quoted and re-checked
- Chapter 405 Zoning Regulations, Article II: Districts and District Regulations (City of Pagedale, MO eCode360) (Pagedale), quoted and re-checked
- Chapter 1115 - Building Code, quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Typical home value (Zillow): Bolthole Index county data
Written October 23, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.