Grantwood Village, Missouri (St. Louis County) runs its own zoning, and construction there needs a Village zoning permit plus a St. Louis County building permit12. Every structure must connect to the Metropolitan St. Louis Sewer District, so a private septic system is not the normal path inside the Village3. The zoning permit application fee is $254.
At a glance
- Zoning
- Yes, the Village divides its land into named zoning districts15
- Building permit
- St. Louis County building permit required, then Village authorization to proceed26
- Zoning permit fee
- $25 application fee, non-refundable4
- Sewer / septic
- Every structure drains to an MSD sewer3
- Residence lot width
- 100 feet at the building line in a Residence District7
- Residence setbacks
- At least 35 feet rear yard and 20 feet each side yard8
- Height limit
- 2½ stories or 40 feet9
- Moving into a purchased home
- St. Louis County occupancy permit required first10
Who to call
Zoning
Town of Grantwood Village (Board of Trustees)
Zoning permit applications and authorization to proceed with construction inside Grantwood Village
1 Missionary Ridge, Saint Louis, Missouri 63123
Building permits
St. Louis County Department of Transportation and Public Works — Codes and Ordinances
County building permits and plan review, which the Village requires before it authorizes construction
41 South Central Avenue, 6th Floor, Clayton, MO 63105
Septic permits
St. Louis County Department of Public Health
Onsite wastewater (septic) questions for St. Louis County; the first call if a Grantwood Village lot ever lacks a sewer connection
6121 North Hanley Road, Berkeley, MO 63134
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in Town of Grantwood Village means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Grantwood Village, Missouri have zoning?
Yes. Grantwood Village, a town in St. Louis County, divides its land into named zoning districts1. The districts are A through E Residence, FP Flood Plain, G Animal Preserve, H Commercial, P Park and T Trail5. St. Louis County's own zoning covers unincorporated land only; inside a municipality, the municipal zoning officer approves zoning11.
The Village's published rules for a Residence District require a lot width of 100 feet at the building line7. New or structurally altered buildings need a rear yard of at least 35 feet and a side yard of at least 20 feet on each side8. No structure may exceed 2½ stories or 40 feet in height9. Lot width and setbacks are written for a Residence District, so confirm which district your parcel sits in before you plan.
We could not confirm Village rules on RVs, temporary camping, tiny homes, minimum house size, lot coverage or short-term rentals. Ask the Village at [email protected] before assuming any of them is allowed.
Do you need a building permit in Grantwood Village, and who issues it?
Two approvals are involved. The Village issues a zoning permit, and St. Louis County issues the building permit. Construction inside the Village cannot begin until the applicant submits a copy of the St. Louis County building permit and approved plans to the Village212. The Village then issues authorization to proceed with start and end dates6.
The Village's zoning permit application fee is $25, it must accompany every application, and it is not refundable; the form also provides for a separate fee based on construction cost4. Work done without a zoning permit is a violation under the Village's rules6.
St. Louis County's building code requires the owner to apply to the building official and obtain a permit before constructing, altering, repairing or demolishing a building; it lists exemptions such as one-story detached sheds of 120 square feet or less13. A Village tree permit is also required if construction will affect trees12. We could not confirm which building-code edition the Village itself has adopted; ask the Village.
How do septic permits work in Grantwood Village?
Inside Grantwood Village, septic is mostly a non-issue because the Village code says every structure must drain sewage and runoff into a sewer system that is part of the Metropolitan St. Louis Sewer District, through an enclosed and concealed connection3. Off-grid sanitation is therefore limited to what that rule allows14.
We could not confirm any Village rule on septic permits, septic inspections or private wells. If a lot lacks a sewer connection, ask the St. Louis County Department of Public Health, which the state lists as an ordinance authority for onsite wastewater in the county15. Missouri requires a construction permit before installing or repairing most onsite wastewater systems16.
What about floods and driveways in Grantwood Village?
The Village has an FP Flood Plain District5. In Village lands mapped as A or AE flood zones, no development is allowed without a floodplain development permit from the Village or its designated representative17. New subdivisions and other new development in special flood hazard areas must also meet the Village's floodplain safeguards18.
For driveways, parcels with a paved surface get one driveway opening per street frontage. Additional openings need Site Development Plan approval and 100 feet of frontage for each extra opening, and openings may not exceed 30 feet in width unless the plan approves a wider one19.
Building or buying a home in Grantwood Village: the steps, in order
- Confirm your parcel's zoning district with the Village ([email protected]) and check the flood zone517.
- Apply to St. Louis County for the building permit and plan approval2.
- Submit the county permit, approved plans and the $25 application fee to the Village64.
- Wait for the Village's authorization with start and end dates before work begins6.
- Connect to the MSD sewer3.
- If you bought an existing home, obtain a St. Louis County occupancy permit before moving in10.
What stays with St. Louis County, and what to check before you buy
The Village decides zoning and issues its own authorization, but building permits and the occupancy permit come from St. Louis County210. For land outside Village limits, use the St. Louis County page; county rules for unincorporated land do not apply inside the Village.
Before buying, check the zoning district, the flood zone and the sewer connection. Subdivision indentures may impose additional private restrictions on top of municipal zoning20. For context, St. Louis County's effective property tax rate is 1.2%21, and its typical home value is about $293,45822.
Watch-outs
- The Village's lot-width, setback and height figures are written for a Residence District, so a parcel in another district may follow different numbers78.
- We could not confirm Village rules on RVs, tiny homes, minimum house size, owner-builder work, private wells or septic; call the Village at 314-842-4409 or email [email protected] before relying on any of them12.
- Construction cannot start on a county permit alone; the Village must authorize it in writing first6.
Sources
- Grantwood Village Code, Title IV: Land Use (Town of Grantwood Village), quoted and re-checked
- Grantwood Village Zoning Permit Application (Town of Grantwood Village), quoted and re-checked
- Grantwood Village Code, Title IV: Land Use (Town of Grantwood Village), quoted and re-checked
- Grantwood Village Zoning Permit Application (Town of Grantwood Village), quoted and re-checked
- Grantwood Village Code, Title IV: Land Use (Town of Grantwood Village), quoted and re-checked
- Grantwood Village Zoning Permit Application (Town of Grantwood Village), quoted and re-checked
- Grantwood Village Code, Title IV: Land Use (Town of Grantwood Village), quoted and re-checked
- Grantwood Village Code, Title IV: Land Use (Town of Grantwood Village), quoted and re-checked
- Grantwood Village Code, Title IV: Land Use (Town of Grantwood Village), quoted and re-checked
- Resident Information - Grantwood Village (Town of Grantwood Village), quoted and re-checked
- Single-Family Dwelling Design Checklist, quoted and re-checked
- Town of Grantwood Village (Board of Trustees) (grantwoodvillage.org)
- Chapter 1115 - Building Code, quoted and re-checked
- Grantwood Village Code, Title IV: Land Use (Town of Grantwood Village), quoted and re-checked
- OWTS Construction Permit Process — St. Louis County authorities, quoted and re-checked
- OWTS Construction Permit Process, quoted and re-checked
- Grantwood Village Code, Title IV: Land Use (Town of Grantwood Village), quoted and re-checked
- grantwoodvillage.org (Town of Grantwood Village), quoted and re-checked
- Grantwood Village Code, Title IV: Land Use (Town of Grantwood Village), quoted and re-checked
- Single-Family Dwelling Design Checklist, quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- Typical home value (Zillow): Bolthole Index county data
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.