New London, Missouri has city zoning, but we could not confirm the operative building-permit requirements; ask New London City Hall before construction.1 Private sewage systems inside the city require a written permit from the city Inspector, and state or county health officers may impose additional requirements.2 Ralls County Health Department also requires septic construction permits regardless of lot size.3
At a glance
- Building permits
- City requirements unconfirmed; ask New London City Hall before construction.4
- Zoning
- City zoning applies inside New London; standards depend on the district.1
- Private sewage approval
- City Inspector issues the written permit; state or county health requirements also apply.2
- Septic construction permit
- Health department requires a permit for new systems regardless of lot size, and for repair, replacement or upgrade.3
- Septic lot area
- Subsurface absorption requires at least 15,000 square feet; this is a sewage-system threshold.5
- Sewer permit fees
- City code lists $10 for private sewage permit and inspection; $35 for residential or commercial building-sewer permit and inspection.6
Who to call
Planning & zoning
Ask City Hall for the municipal building-permit and zoning contact; linked page is the city zoning code.
Septic permits
Ralls County Health Department
Domestic onsite sewage permits and environmental health questions
16369 Business 61
Septic permits
Ralls County Health Department — onsite wastewater permit procedures
Septic construction applications, site evaluation and installation inspections.
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in New London means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in New London, MO?
We could not confirm which projects require a building permit in New London or the applicable building code; ask New London City Hall for the current requirements before starting work. The city zoning code lists building-permit application and occupancy-permit provisions, so request the application, inspection schedule and occupancy requirements for your proposed home.4 Ralls County’s zoning order applies to unincorporated land; use the Ralls County guide when the property is outside New London city limits.7
Does New London have zoning, and what about RVs and tiny homes?
New London administers city zoning, with permitted uses and dimensional standards determined by the applicable district.1 The city code lists single-family and two-family residential, multiple-family residential, mobile-home, commercial and industrial districts.8 Ask City Hall to identify the parcel’s district and provide the applicable lot-size, setback, height and dwelling-size rules.1 We could not confirm permission for RV living, temporary camping, tiny homes or accessory dwellings inside New London; ask City Hall about the exact dwelling and proposed duration before buying. Do not treat the mobile-home district listing as approval for a particular manufactured home: the district’s operative use standards remain unconfirmed.8
How do septic permits work inside New London?
New London allows a private sewage-disposal system where public sewer is unavailable under the city sewer provisions; a subsurface absorption system requires at least 15,000 square feet of lot area.5 Before private-system construction, obtain the city Inspector’s written permit and resolve any additional state or county health requirements.2 Ralls County Health Department’s procedures require a septic permit for new systems regardless of lot size and for repair, replacement or upgrade.3 Call the health department at 573-985-7121 to coordinate the county application with the city approval.9 The city code lists a $10 private sewage-disposal permit and inspection fee and a $35 residential or commercial building-sewer permit and inspection fee; ask each office for its current charges.6
What are the steps for building a home in New London?
Start by asking City Hall to identify the zoning district and confirm your proposed residential use and dimensional requirements.1 Request the city building-permit application and occupancy requirements before committing to construction plans.4 Resolve public-sewer availability with the city Inspector before designing a private sewage system.5 For septic, the health department’s procedures call for a registered soil scientist’s evaluation, a registered installer and an application for review; construction must wait until the permit is issued.3 Notify the city Inspector for final private-sewage inspection before covering underground portions, and complete installation to the Inspector’s satisfaction.10
What should you check before buying land in New London?
Ask City Hall about subdivision approval if you intend to split the parcel: New London publishes subdivision regulations, but the specific plat and improvement requirements remain unconfirmed.11 For a septic proposal, a sufficient lot area does not replace a soil evaluation; the health department requires soil testing and engineered plans for non-conventional systems.3 Ralls County’s soils rated not limited for conventional drain fields account for only 1.7% of county land; this county-wide rating calls for site evaluation and does not mean septic is impossible on a New London lot.12 Missouri requires a permit for all floodplain development; ask City Hall to identify the applicable community floodplain administrator before grading or building.13 We could not confirm New London’s private-well or driveway-access requirements; request those answers from City Hall before closing.
Watch-outs
- A larger lot does not remove the health department’s septic-permit requirement: its procedures require permits regardless of lot size.3
- The city’s private-sewage permit and health department septic construction permit need separate attention; coordinate both offices before installation.23
- We could not confirm RV or tiny-home occupancy inside New London; ask City Hall before using either as a residence.4
Sources
- Chapter 405: Zoning Regulations - City of New London, MO (New London), quoted and re-checked
- Chapter 705 Public and Private Sewers - City of New London, MO (New London), quoted and re-checked
- Ralls County Health Department — onsite wastewater permit procedures (rallscountyhealth.org)
- New London City Hall (ecode360.com)
- Chapter 705 Public and Private Sewers - City of New London, MO (New London), quoted and re-checked
- Chapter 705 Public and Private Sewers - City of New London, MO (New London), quoted and re-checked
- Planning & Zoning – Ralls County Missouri, quoted and re-checked
- Chapter 405: Zoning Regulations - City of New London, MO (New London), quoted and re-checked
- Ralls County Health Department (rallscountyhealth.org)
- Chapter 705 Public and Private Sewers - City of New London, MO (New London), quoted and re-checked
- Chapter 410: Subdivision Regulations - City of New London, MO (New London), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Floodplain Forms (Missouri statewide rule), quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.