Washington, Missouri requires city building permits for new homes and regulates land use through city zoning districts.12 Inside Washington city limits, a private sewage system needs a written permit from the City Building Official when public sewer is unavailable.3 For land outside the city in Franklin County, county building and zoning requirements apply in unincorporated areas.45
At a glance
- Building permits
- City building permits required for new construction1
- Zoning
- City districts and zoning map govern land use2
- Septic permits
- Written City Building Official approval before constructing a private sewage system where public sewer is unavailable3
- RV living and tiny homes
- Residential occupancy rules could not be confirmed; ask city Planning and Zoning before buying6
- Owner-builder
- A city owner-builder exemption could not be confirmed; ask the Building Department7
- Agricultural land
- AG district farms require at least 10 acres; this is not a citywide residential lot minimum8
- Occupancy
- Inspection and certificate of occupancy required before occupying residential premises9
Who to call
Building permits
City of Washington Building Department
City building applications, building inspections and occupancy inspections; contact for the City Building Official
Zoning
City of Washington Planning and Zoning Department
City zoning applications, rezoning, special use permits, variances and parcel zoning questions
405 Jefferson Street, First Floor
Septic permits
City of Washington Building Official
Private sewage disposal system permits and installation inspections inside Washington city limits
Septic permits
Franklin County Building Department
County onsite wastewater approvals; ask whether additional county requirements apply to a proposed private system inside Washington
400 East Locust Union, MO 63084
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Washington means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Washington, MO have zoning, lot-size rules and setbacks?
Washington has its own agricultural, residential, commercial, industrial and planned-development zoning districts; the city zoning map determines which district governs a parcel.2 Ask Washington Planning and Zoning to identify the parcel’s district before choosing a home design or farm use.6
In Washington’s AG Agricultural District, a farm must encompass at least 10 acres, and accessory structures housing livestock or fowl must be at least 200 feet from the agricultural district boundary.810 Those thresholds concern AG farms and livestock structures, rather than every residential lot in Washington.810 In the R1-A Single-Family Residence District, the maximum building height is 35 feet or two and one-half stories.11
Do you need a building permit in Washington, and who issues it?
New homes and other new structures inside Washington require city building permits, and Washington has adopted building codes with local amendments.112 Contact the Washington Building Department at 636-390-1010 or [email protected] and apply through the city’s online permit portal.7
Washington’s new-construction building permit calculation uses gross area and ICC modifiers, with a multiplier of $3 per $1,000 of construction cost; the code also requires a $350 refundable escrow until the final certificate of occupancy.13 Request the city’s calculation for your actual plans before setting the construction budget.7 A city owner-builder exemption could not be confirmed; ask the Building Department before assuming that doing the work yourself removes the building permit requirement.7
How do septic permits work inside Washington, MO?
Where public sewer is unavailable, construction of a private sewage disposal system inside Washington requires a written permit signed by the City Building Official before work starts.3 Submit the city application with plans, specifications and any other information the Building Official requests, and pay the permit and inspection fee when filing.3
Washington requires notification before underground portions are covered and when the system is ready for final inspection; installation must satisfy the Building Official.14 Franklin County also administers an onsite wastewater code: ask the county Building Department whether additional county approval applies to your proposed system, while obtaining Washington’s required city approval.15163 Do not begin installation based on an assumed Missouri exemption; the state process requires an issued permit or a confirmed exemption before work begins.17
Can you live in an RV or tiny home in Washington?
We could not confirm a general rule allowing long-term RV residential occupancy, temporary camping or tiny-home occupancy on private land inside Washington; ask city Planning and Zoning about the proposed address and use before committing to a purchase.6 We also could not confirm a distinct accessory-dwelling rule or minimum dwelling floor area for Washington; include those questions when discussing a small home or second dwelling with the city.6
Washington’s mobile-home provisions require occupied mobile homes to have toilet and bathing facilities and connect to public water and sanitary sewers.18 That mobile-home rule does not establish permission for RV or tiny-home occupancy; obtain a city determination for the particular housing proposal.186
What are the steps to build a home in Washington?
- Ask Washington Planning and Zoning to identify the property’s district and review the proposed use against the city zoning map and district rules.26
- Confirm sewer availability with the City Building Official; where public sewer is unavailable, obtain the city’s private sewage disposal permit before system construction.3
- Create an account in the city permit portal, complete the building application, attach required plans and click Submit so staff receive the application.7
- Allow for the city’s stated 2–3 weeks of plan review, with additional time if more information is needed; pay the fees and obtain the issued building permit before scheduling inspections.7
- Schedule building inspections by phone, calling by 3 PM the business day before the desired inspection date; online scheduling is unavailable.7
- Obtain the required inspection and certificate of occupancy before occupying the Washington home.9
What stays with Franklin County or Missouri, and what should buyers check?
Outside Washington city limits, Franklin County’s Building Department issues building permits for new construction in unincorporated areas, and county Planning and Zoning regulates unincorporated land use.45 Washington’s own building and zoning rules govern the city property described in this guide.12
Missouri requires licensing or permitting of people who construct wells; the available rule does not establish a separate Franklin County homeowner well permit.19 Floodplain development needs approval through the applicable community’s floodplain permitting process, so ask Washington’s city offices about floodplain review before planning construction.206 Franklin County’s soil ratings show only 2.2% rated not limited for conventional septic drain fields; that countywide figure supports budgeting for a site evaluation, rather than assuming septic is impossible or treating the figure as a Washington parcel assessment.21
Watch-outs
- Washington requires an inspection and certificate of occupancy upon a change of occupancy, so an existing-home purchase can involve city approval as well as a new build.22
- An agricultural building permit exemption inside Washington could not be confirmed; ask the city Building Department rather than applying an unincorporated-county exemption to city land.7
- Missouri’s temporary suspension of state onsite wastewater application fees does not establish that Washington’s city permit and inspection fees are waived; Washington’s code requires those fees when filing.233
Sources
- Article IV: Supplementary Regulations - City of Washington, MO (Washington), quoted and re-checked
- Table of Contents - City of Washington, MO (Washington), quoted and re-checked
- Article VI: Private Sewage Disposal Systems - City of Washington, MO (Washington), quoted and re-checked
- Building | Franklin County, MO, quoted and re-checked
- Planning & Zoning Department, quoted and re-checked
- City of Washington Planning and Zoning Department (washmo.gov)
- City of Washington Building Department (ci-washington-mo.smartgovcommunity.com)
- Article III: District Regulations - City of Washington, MO (Washington), quoted and re-checked
- Chapter 500: Building Code - City of Washington, MO (Washington), quoted and re-checked
- Article III: District Regulations - City of Washington, MO (Washington), quoted and re-checked
- Article III: District Regulations - City of Washington, MO (Washington), quoted and re-checked
- Chapter 500: Building Code - City of Washington, MO (Washington), quoted and re-checked
- Chapter 500: Building Code - City of Washington, MO (Washington), quoted and re-checked
- Article VI: Private Sewage Disposal Systems - City of Washington, MO (Washington), quoted and re-checked
- County of Franklin On-Site Wastewater Disposal Code, quoted and re-checked
- Franklin County Building Department (franklinmo.gov)
- OWTS Construction Permit Process (Missouri statewide rule), quoted and re-checked
- Article IV: Supplementary Regulations - City of Washington, MO (Washington), quoted and re-checked
- Permits Needed for Well Driller Businesses, quoted and re-checked
- Floodplain Forms (Missouri statewide rule), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Chapter 500: Building Code - City of Washington, MO (Washington), quoted and re-checked
- OWTS Construction Permit Process (Missouri statewide rule), quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.