Unincorporated Dade County, Missouri appears not to require a residential building permit; confirm the project with the County Clerk1. Greenfield and Lockwood issue city building permits, and Greenfield has city zoning2,3. The Dade County Health Department requires septic construction permits regardless of property size; Lockwood also requires a city permit for private sewage systems4,5.

Do you need a building permit in Dade County, Missouri?

A residential building permit appears not to be required in unincorporated Dade County, Missouri; ask the County Clerk to confirm the rule for the parcel and project before construction.

A residential building permit appears not to be required in unincorporated Dade County, Missouri; ask the County Clerk to confirm the rule for the parcel and project before construction1. Missouri does not impose one uniform statewide building code; qualifying counties adopt codes locally under state-law procedures12. Inside Greenfield and Lockwood, city building permits are required before covered construction begins2,3. City building permits do not replace Dade County Health Department septic construction permits, and Lockwood also requires its Superintendent’s written permit for a private sewage system4,5,6.

Who issues building permits in Dade County?

For building-permit questions on unincorporated Dade County land, contact the County Clerk and Commission through the Dade County Courthouse.

For building-permit questions on unincorporated Dade County land, contact the County Clerk and Commission through the Dade County Courthouse1. The residential building-permit answer appears to be no, but we could not confirm a direct county statement; ask about inspections and occupancy approval for the proposed project as well1. Greenfield requires city building permits for residential structures, including tiny residences2. Lockwood requires city building permits for covered construction, improvements, exterior-dimension alterations and excavation3. Start septic questions with the Dade County Health Department; within Lockwood, also obtain the city’s private-sewage permit where public sanitary sewer is unavailable5,6.

Does Dade County have zoning?

We could not confirm an adopted zoning ordinance or map for unincorporated Dade County; ask the County Clerk about the parcel’s zoning, setbacks and minimum dwelling size.

We could not confirm an adopted zoning ordinance or map for unincorporated Dade County; ask the County Clerk about the parcel’s zoning, setbacks and minimum dwelling size1. Greenfield has city zoning, including a Medium Density Residential Zone identified for tiny houses2. City zoning does not replace the Dade County Health Department’s septic construction-permit requirement4,6. Missouri law excludes qualifying agricultural buildings outside incorporated territory and mapped flood-hazard areas from specified county land-use restrictions; the exemption is limited, and the statute preserves certain older county ordinances10,11. A farm-building exemption does not eliminate the separate floodplain development-permit requirement for work in a mapped floodplain7.

How do septic permits work in Dade County?

The Dade County Health Department administers onsite-wastewater permitting under a county ordinance that may exceed state minimum standards.

The Dade County Health Department administers onsite-wastewater permitting under a county ordinance that may exceed state minimum standards6. Dade County requires a septic “permit to construct” for every onsite system, including renovation or repair, and states that there are no property-size exemptions4. Missouri’s general acreage exclusions therefore do not remove Dade County’s permit requirement; obtain the county permit before work begins4,6,13. Use a Missouri-registered installer and keep required work open for inspection with advance notice to the permitting authority4,14. State application fees are temporarily suspended; ask the Health Department about charges under its local process6,15. Inside Lockwood, private sewage systems also need the Superintendent’s written permit where public sewer is unavailable5. Only about 2.9% of Dade County land is rated without severe limitations for conventional septic drain fields, making a soil evaluation a priority before choosing a homesite16.

Can you live in an RV, tiny home or manufactured home on your land in Dade County?

We could not confirm whether unincorporated Dade County allows residential occupancy in an RV, tiny home or manufactured home; ask the County Clerk about occupancy and dwelling requirements before buying for that use.

We could not confirm whether unincorporated Dade County allows residential occupancy in an RV, tiny home or manufactured home; ask the County Clerk about occupancy and dwelling requirements before buying for that use1. Inside Greenfield, tiny residences require city building permits, and the city identifies a Medium Density Residential Zone for tiny houses2. Off-grid living still requires sanitary disposal of domestic sewage and a registered onsite-system installer; the state acreage exclusions do not override Dade County’s no-property-size-exemption permit rule4,13. Where central sewer is unavailable, an onsite system must meet the county ordinance; wastewater cannot be discharged onto the ground or into a road ditch17.

Building a home in Dade County: the steps, in order

Establish jurisdiction: Greenfield and Lockwood require city building permits for covered projects; for unincorporated land, confirm the building-permit answer with the County Clerk.

  1. Establish jurisdiction: Greenfield and Lockwood require city building permits for covered projects; for unincorporated land, confirm the building-permit answer with the County Clerk1,2,3.
  2. Confirm zoning and occupancy requirements with the County Clerk for unincorporated land; Greenfield has its own city zoning1,2.
  3. Apply to the Dade County Health Department for the septic construction permit before installing or repairing an onsite system, regardless of acreage; Lockwood also requires a city private-sewage permit4,5,6.
  4. Obtain a floodplain development permit before work in a mapped floodplain and an engineering No-Rise Certificate for regulatory-floodway work7.
  5. Arrange well work with a properly permitted contractor, or follow the landowner exception for installing your own private well or pump8.
  6. Obtain a MoDOT driveway permit before constructing or modifying access on state highway right-of-way18.

What to check before you buy land in Dade County

Soils: only about 2.9% of Dade County land is rated without severe limitations for a conventional septic drain field, so have the site evaluated before assuming a standard system will work.

Soils: only about 2.9% of Dade County land is rated without severe limitations for a conventional septic drain field, so have the site evaluated before assuming a standard system will work16. Flooding: development in a mapped floodplain needs a permit, and work in the regulatory floodway needs an engineering No-Rise Certificate before the permit can be issued7. Water: well construction, repair and pump installation generally require state permits, but a landowner may install a private well or pump without one under Missouri law8. Access: a new or modified driveway on MoDOT right-of-way requires a state permit; we could not confirm a separate county driveway rule18. Taxes: the effective property-tax rate is about 0.7%, and the median annual bill is about $1,02216. The nearest city of 100,000 or more is about 37 miles from the county center16.

Watch-outs

  • We could not confirm county building-permit, zoning or alternative-dwelling occupancy rules directly; ask the County Clerk before committing to a project in unincorporated Dade County1.
  • Dade County’s septic construction-permit requirement has no property-size exemption, even where Missouri’s general acreage exclusions would otherwise apply4,13.
  • Lockwood requires a city private-sewage permit where public sewer is unavailable and prohibits subsurface absorption systems on lots smaller than 15,000 square feet5.

Sources

18 official pages, each quoted and re-checked · written October 12, 2026

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like 3 of the 4 neighbors with published rules, Dade County has no countywide zoning.

RuleDade CountyCedar CountyLawrence CountyPolk CountyBarton CountyGreene CountyJasper County
Building permitNot requiredNot requiredNot requiredNot requiredNot requiredRequiredRequired
County zoningNoNoNoNoNot publishedYesNot published
Septic permitsCounty Health Dept.County Health Dept.County Health Dept.County Health CenterCounty Health Dept.County Resource Management Env. Div.County Health Dept.

County locator

Dade County in Missouri

76
County map
Dade County highlighted among the Missouri counties · colored by Index score

How Dade County scores

76 / 100 · #24 of 115 in Missouri · six factors, land price, tax, rain and climate

Seclusion70100% ev.
Self-Sufficiency63100% ev.
Admin Boringness8790% ev.
Durability48100% ev.
Property Autonomy47100% ev.
Carry Cost83100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$203kTypical home
0.7%Property tax
$3,520Land / acre
44.8"Annual rain
6.8% of yrsSevere drought
16.1 / yr (+12.7)Mid-century 100°F days
18 daysMid-century dry spell
2.21" (+4.7%)Mid-century 1-day rain
1.62×Wildfire change factor
100%Forward climate coverage
$1,749Home insurance / yr
2.2% / yrInsurance growth
1.6%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
7,008People within 30 min
1,250,694People within 2 hr
15,568Radius comparison (15 mi)
15.7People / sq mi
5.2%Federal land
93%Land at 15% slope or less
2.9%Soils rated "not limited" for septic (strict USDA rating)
8,868 acWorkable land screen
21.1%Wooded land
49.1 tonsBiomass / forest ac
56.8°FAvg temp

Scout Dade County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Dade County. Listing sites control their own results and filters.

Sell land in Dade County? Be the only seller on this page →

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Dade County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Not yet covered: Village of Arcola · Village of Dadeville · Village of South Greenfield

Answers from the rulebook for Dade County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Dade County rules

  • Who permits septicCounty

    Onsite wastewater system construction and existing-system repairs in Dade County.

    • The Dade County Health Department is identified by DHSS as the ordinance authority for Dade County.
    • DHSS staff may also regulate construction and repairs according to state standards.
    • DNR regulates other wastewater facilities, including systems with flows greater than 3,000 gallons per day, systems discharging to surface waters, industrial wastewater, and non-single-family lagoons.
    “Agency: Dade County Health Dept. Authority Type: Ordinance [...] County: Dade [...] Contact the agency above for onsite wastewater permitting instructions. This county has their own Onsite Wastewater Ordinance and may have additional requirements beyond the state minimum construction standards.”
    One more reviewed finding on this topic
  • Septic permitRequired

    All onsite sewage disposal systems in Dade County, including construction and renovation or repair of systems.

    • Dade County states there are no property-size exemptions.
    • Work should not begin until a permit has been issued or an exemption has been confirmed by the appropriate permitting authority.
    • DNR jurisdiction applies to other wastewater facilities, including non-single-family lagoons, systems discharging to surface waters, systems over 3,000 gallons per day, and industrial wastewater.
    • Since 2004, systems must be installed by an installer registered with the Missouri Department of Health.

    permit requirement start: 1996 year · application fees for onsite sewage construction, modifications, and repairs: temporarily suspended (Effective August 28, 2026; suspension is due to changes to RSMo 701.046)

    “In Dade County Missouri, all on-site sewage disposal systems have been required to get a "permit to construct" since 1996. [...] Do I need a permit to renovate the sewage disposal system? Yes”
    One more reviewed finding on this topic
    • Required — Installing or repairing most onsite wastewater treatment systems in unincorporated Dade County.
      “A construction permit is required before installing or repairing most onsite wastewater treatment systems (OWTS). Some single family residential lots may be exempt from permitting.”
  • Off-grid sanitationAllowed (with conditions)

    Use of onsite wastewater treatment systems where central sewer service is unavailable in unincorporated Dade County.

    • The system must comply with the Dade County onsite wastewater ordinance and any requirements beyond state minimum standards.
    • A construction permit is generally required before installation or repair unless the applicable exemption is confirmed.
    • Wastewater may not be discharged into a road ditch or onto the ground.
    • Systems serving more than 3,000 gallons per day, discharging to surface waters, or otherwise outside DHSS jurisdiction may be regulated by DNR.

    domestic wastewater flow threshold: <= 3000 gallons per day (Other wastewater systems fall under DNR jurisdiction.)

    “In Missouri, where central sewer service is not available, homeowners and small business owners use various types of onsite wastewater treatment systems (OWTS).”
  • County-wide zoningAbsent

    Dade County has no countywide zoning department or ordinance for unincorporated areas; only incorporated cities such as Greenfield have local zoning.

    Dade County, Missouri - Government Offices ↗From the county’s own site, awaiting a second reviewer

Missouri rules that apply here

  • Building permitLimited

    Building permits for construction in Missouri: no statewide permit is shown; first and second classification counties may adopt building regulations and permits if voters have approved

    • Authority is an option for county commissions in counties of the first and second classification, not a statewide mandate
    • A county that had not adopted a building code before August 28, 2001 needs voter approval, voted only by voters outside incorporated territory
    • Municipalities and other counties must be checked locally
    • This claim is about the county enabling authority only; the state septic rule (RSMo 701.031) was not used as a building-permit requirement
    “the county commission in all counties of the first and second classification, as provided by law, is for this purpose empowered, subject to the provisions of subsections 2 and 3 of this section, to adopt by order or ordinance regulations to control the construction”
  • Owner-builder exemptionAvailable (with conditions)

    A property owner installing, modifying, or repairing that owner's on-site sewage disposal system.

    • The owner must comply with RSMo 701.025 to 701.059.
    • The statute separately provides that an owner need not obtain a permit or contractor registration merely to clean that owner's on-site sewage disposal system.
    “Nothing in sections 701.053 to 701.055 shall preclude property owners from installing, modifying or repairing their own on-site sewage disposal system”
  • Building code adoptedPartial

    Missouri statewide legal framework for building-code adoption by counties and other communities; the statutes authorize local adoption rather than establishing one uniformly adopted statewide building code.

    • County authority under RSMo 64.170 applies to counties of the first and second classification.
    • A county that had not adopted a building code before August 28, 2001 must obtain voter approval before adopting under RSMo 64.170 to 64.200.
    • The adoption vote is limited to voters in the affected area; a code affecting a county is not voted on by citizens of incorporated territory.
    • A county adopting under RSMo 64.180 must use a current nationally recognized building code edition from calendar year 1999 or later, as amended.
    • A county building ordinance may not conflict with liquefied petroleum gas installation requirements governed by RSMo 323.020.
    • A community may incorporate a code by reference only if it otherwise has legal power to adopt the ordinance.
    • A code incorporated by reference must be filed with the community clerk and available for public inspection for 90 days before adoption.
    • An ordinance adopting a code by reference must state the penalty separately rather than incorporate the penalty by reference.
    • RSMo 67.280 defines community to include any county, fire protection district, or municipality, and municipality to include an incorporated city, town, or village.
    “Because fire and building codes are adopted at the local level in Missouri”
    2 more reviewed findings on this topic
  • InspectionsLimited

    Construction, major modification, or major repair of an on-site sewage disposal system for which RSMo 701.046 requires notice and an application; this is not a general statewide inspection rule for all buildings.

    • The city, county, or department must receive notice and an opportunity to inspect before completion.
    • A registered contractor must notify the authority before 9:00 a.m. on the day before completion; an unregistered person must notify it before 9:00 a.m. on the second day before completion.
    • The system must remain available for a complete inspection under the state standard until 3:00 p.m. on the completion day unless the authority confirms earlier inspection and approval.
    • The system may not be closed or completed if inspection finds it does not meet the state standard; the authority must provide conspicuous notice at inspection and written confirmation of the result, or of no inspection, within three working days of completion.
    “without providing notice and an opportunity for inspection by the city, county or department as provided in this section.”
  • Zoning districtsPartial

    Missouri statutory authority for counties to create zoning districts in unincorporated territory; this does not establish or publish the actual zoning districts for any particular county.

    • The statute applies to unincorporated territory of counties subject to sections 64.211 to 64.295.
    • Actual district boundaries, regulations, and maps depend on county adoption and are not supplied by this statewide statute.
    • District regulations must be uniform for each class or kind of building or land use within each district, although regulations may differ between districts.
    • The regulations must be made in accordance with a comprehensive plan.
    “the unincorporated territory may be divided into districts of such number, shape and area as may be deemed best suited”
  • Minimum dwelling sizeDistrict specific (with conditions)

    Potential county zoning controls on the size of residential buildings in unincorporated portions of first-class counties other than first-class counties without a charter form of government.

    • The county commission is authorized to regulate by order in accordance with a comprehensive plan.
    • The statute does not state a statewide minimum dwelling-size measurement.
    • The statute expressly excludes incorporated portions of counties and identifies additional agricultural, rice-farming, flood-irrigation, farm-structure, and underground-mining exclusions.
    “except in counties of the first class not having a charter form of government [...] in the unincorporated portions of the county [...] size of buildings”
  • SetbacksSpecified

    Size of yards, courts and other open spaces in unincorporated portions of second- and third-class counties with county zoning; setbacks left to such counties

    • Power exists only for counties to which sections 64.510 to 64.690 apply under section 64.510
    • Exercised only after approval by vote of the people as provided in section 64.530
    • Must be done by order of record and in accordance with a comprehensive plan
    • Applies only to unincorporated portions of the county
    • Does not apply to crops, livestock, orchards, forestry, or farm buildings used for such purposes outside the flood hazard area map area
    • Existing lawful uses protected; ordinances adopted before March 4, 1991 unaffected
    “the size of yards, courts and other open spaces”
  • Lot coverageSpecified

    Percentage of lots that may be occupied in unincorporated portions of second- and third-class counties with county zoning; lot coverage left to such counties

    • Power exists only for counties to which sections 64.510 to 64.690 apply under section 64.510
    • Exercised only after approval by vote of the people as provided in section 64.530
    • Must be done by order of record and in accordance with a comprehensive plan
    • Applies only to unincorporated portions of the county
    • Does not apply to crops, livestock, orchards, forestry, or farm buildings used for such purposes outside the flood hazard area map area
    • Existing lawful uses protected; ordinances adopted before March 4, 1991 unaffected
    “the percentage of lots that may be occupied”
  • Camping on your landLimited

    Developments where land is sold or leased for camping in recreational vehicles (recreational developments) under the state wastewater rule 10 CSR 20-6.030; this is a wastewater-disposal rule, not a zoning rule on camping generally

    • Applies only when land is sold or leased for the purpose of camping in recreational vehicles.
    • To qualify as a recreational development, restrictive covenants must prohibit continuous year-round living on the lot, and no cabins or other structures that could be used for year-round residential purposes are allowed.
    • Minimum lot size of 20,000 sq ft applies where individual on-site wastewater treatment facilities are used; no reduction from the minimum lot size determined by the geohydrologic evaluation, though a one-half reduction as indicated by the soils report may be allowed.
    • Where sewage dump stations provide collection and treatment, they count as centralized collection and treatment.
    • The developer must submit a copy of the restrictive covenants with any plans for dump stations or centralized systems.
    • Any residential housing development required to obtain department approval must get written approval before sale or lease of any lot or start of construction.
    • Rule text says it does not preclude local, municipal, county or other lawful authority from adopting equal or more stringent subdivision, sewer or on-site system regulations.
    • Rule was last amended with an effective date of Jan. 30, 2025.
    • The state rule does not itself regulate temporary camping on private land outside such developments; that is left to local zoning.

    minimum lot size, recreational development with individual on-site wastewater treatment: >= 20000 square feet (one-half reduction per soils report may be allowed; no reduction from geohydrologic evaluation minimum)

    “a development is considered recreational when land is sold or leased for the purpose of camping in recreational vehicles. in order to be considered a recreational development, restrictive covenants must prohibit continuous year-round living on the lot and no cabins or other structures will be allowed that could be used for year-round residential purposes.”
  • Septic inspectionRequired

    Construction, major modification, or major repair of an on-site sewage disposal system when notice and application are required under RSMo 701.046.

    • The person must provide notice and an opportunity for inspection before completion.
    • Registered contractors must notify the city, county, or department before 9:00 a.m. on the day preceding completion.
    • Persons not registered under RSMo 701.053 to 701.055 must notify before 9:00 a.m. on the second day preceding completion.
    • The system must remain open and inspectable until 3:00 p.m. on the day of completion unless the agency confirms earlier inspection and approval.
    • The system may not be closed or completed if inspection determines it fails the state standard.
    • The agency must provide written inspection results, or confirmation that it did not inspect, within three working days after completion.
    • The requirement is limited by the exceptions in RSMo 701.046 and RSMo 701.031.

    registered-contractor notice deadline: 9:00 a.m. on the day preceding completion · unregistered-person notice deadline: 9:00 a.m. on the second day preceding completion · inspection availability deadline: 3:00 p.m. on the day of completion (Unless earlier inspection and approval is confirmed) · written inspection result deadline: within three working days (After the day of completion)

    “No person required to provide notice and apply to the city, county or department under section 701.046 may complete the construction, major modification or major repair of an on-site sewage disposal system* without providing notice and an opportunity for inspection by the city, county or department as provided in this section.”
    2 more reviewed findings on this topic
    • Limited — Inspection or evaluation of existing onsite wastewater systems in connection with Missouri real-estate transfers.
      “For the most part, local public health agencies no longer inspect existing systems related to real estate transfer. The help of a licensed inspector can be obtained to check the condition of the system.”
    • Limited — Inspections of existing onsite sewage systems in connection with property sales statewide in Missouri.
      “Missouri Department of Health and Senior Services' (DHSS) rules governing onsite sewage systems cover minimum construction requirements, system inspections at the time of property sales, and requirements for percolation testers and soil evaluators.”
  • Well permitLimited

    Construction or alteration of a public well serving a Missouri public water system.

    • Public water systems must receive written approval from the Missouri Department of Natural Resources Public Drinking Water Branch before constructing or altering a public well.
    • The requirement does not apply when the system meets the charitable-and-benevolent-organization exemptions in section 640.116, RSMo.
    • Anyone proposing to install a public well must contact the department’s regional office for a well-site survey.
    • The survey addresses minimum isolation or setback distances from known or potential contaminant sources, including septic tanks, sanitary sewer lines, and landfills.
    • Before applying for construction authorization, the public water system must obtain an estimated casing-depth letter from the Missouri Geological Survey Water Resources Center.
    • There is no fee for the well-site-survey and estimated-casing-depth-letter services.
    • Failure to obtain construction authorization may result in approval delays and possibly require the owner to properly plug the well and drill a new one according to 10 CSR 60-3.

    public water system threshold: at least 15 service connections or regularly serves an average of at least 25 individuals daily, at least 60 days per calendar year

    “Public water systems must receive written approval from the PDWB before constructing or altering a public well”
    5 more reviewed findings on this topic
    • Limited — Private and domestic water wells in Dade County, Missouri.
      “A restricted water well or pump installation permit is required for someone to contract these activities or to direct the installation. Landowners may install their own well or pump without a permit pursuant to the above mentioned law and rules.”
    • Required — Water wells serving a Missouri public water system, including qualifying public systems in Dade County.
      “Public water systems must receive written approval from the PDWB before constructing or altering a public well, unless the system meets the charitable and benevolent organization exemptions in section 640.116, RSMo.”
    • Limited — Water-well construction, repair, pump installation, and contracted well work applicable in Dade County under Missouri law.
      “A non-restricted water well installation permit is required to construct or repair a water well in Missouri. A non-restricted pump installation permit is required to install or replace a pump in a water well.”
    • Required — A person or contractor conducting regulated work to drill, construct, repair, reconstruct, plug, or install pumps or pumping equipment in a water well, heat-pump well, monitoring well, or related well in Missouri.
      “A non-restricted permit is required to drill, construct, repair, reconstruct, plug, or install pumps or pumping equipment in a well.”
    • Limited — Construction or repair of water wells, installation or replacement of pumps, and associated plumbing and electrical work in Missouri.
      “A non-restricted water well installation permit is required to construct or repair a water well in Missouri.”
  • Mandatory utility hookupSewer (with conditions)

    Missouri state law preserves the authority of specified local governments and districts that own or operate a sewage-collection-and-treatment sewer system to require connection by owners of houses, buildings, or other facilities within that entity's territory.

    • This is an authorization for the applicable city, town, village, sewer district, public water supply district, municipality, political subdivision, or district; it is not a statewide mandate that every property connect.
    • The entity must own or operate a sewer system providing collection and treatment of sewage.
    • The house, building, or other facility must be within the municipality, political subdivision, or district.
    • The sewer system must be available.
    • The statute identifies sewer districts organized under chapter 204 or chapter 249 and public water supply districts organized under chapter 247 among the entities whose authority is preserved.
    “to require the owners of all houses, buildings or other facilities [...] to connect to the sewer system [...] when such sewer system is available.”
  • Agricultural exemptionAvailable (with conditions)

    County building and land-use restrictions affecting agricultural activities and farm buildings or farm structures in Missouri, including unincorporated Dade County.

    • The exemption does not apply to incorporated portions of counties.
    • The exemption does not apply to the raising of crops, livestock, orchards or forestry.
    • The exemption does not apply to seasonal or temporary impoundments used for rice farming or flood irrigation; rice-farming or flood-irrigation berms are defined as small berms no more than eighteen inches high placed around a field to hold water.
    • The exemption applies to erection, maintenance, repair, alteration or extension of farm buildings or farm structures used for agricultural purposes only when the area is not within the area shown on the flood hazard area map.
    • The section does not apply to underground mining where entrance is through an existing shaft or shafts or through a shaft or shafts not within the area shown on the flood hazard area map.
    • The statute preserves the use or maintenance of existing property for the purpose to which it was lawfully devoted, judicial review of the reasonableness of regulations and powers, and authorized public utility services.
    • The statute does not affect the existence or validity of a county ordinance or order adopted before March 4, 1991.
    “The provisions of this section shall not apply [...] nor to the raising of crops, livestock, orchards or forestry”
    6 more reviewed findings on this topic
    • Conditional — Agricultural activities and farm buildings or farm structures in Dade County, a Missouri third-class county, insofar as Missouri county planning and zoning powers under sections 64.510 to 64.690 apply.
      “The provisions of this section shall not apply to the incorporated portions of the counties, or to the raising of crops, livestock, orchards, or forestry, or to seasonal or temporary impoundments used for rice farming or flood irrigation. As used in this section, the term "rice farming or flood irrigation" means small berms of no more than eighteen inches high that are placed around a field to hold water for use for growing rice or for flood irrigation. This section shall not apply to the erection, maintenance, repair, alteration or extension of farm buildings or farm structures used for such purposes in an area not within the area shown on the flood hazard area map. This section shall not apply to underground mining where entrance is through an existing shaft or shafts or through a shaft or shafts not within the area shown on the flood hazard area map.”
    • Available (with conditions) — Erection, maintenance, repair, alteration, or extension of farm buildings or farm structures as against county fire-protection or fire-prevention ordinances.
      “Notwithstanding any provision of law to the contrary, no fire protection or fire prevention ordinance adopted by any county in this state shall be exercised so as to impose regulations or to require permits with respect to the erection, maintenance, repair, alteration, or extension of farm buildings or farm structures.”
    • Available (with conditions) — Erection, maintenance, repair, alteration, or extension of farm buildings or farm structures used for agricultural purposes under RSMo section 64.890, outside incorporated portions of counties and outside areas shown on flood hazard area maps.
      “This section shall not apply to the erection, maintenance, repair, alteration or extension of farm buildings or farm structures used for such purposes [...]”
    • Available (with conditions) — Farm buildings and farm structures statewide, with respect to county fire-protection and fire-prevention ordinances.
      “no fire protection or fire prevention ordinance adopted by any county in this state shall be exercised so as to impose regulations or to require permits [...]”
    • Available — Erection, maintenance, repair, alteration, or extension of farm buildings or farm structures with respect to county fire-protection or fire-prevention ordinances.
      “Notwithstanding any provision of law to the contrary, no fire protection or fire prevention ordinance adopted by any county in this state shall be exercised so as to impose regulations or to require permits with respect to the erection, maintenance, repair, alteration, or extension of farm buildings or farm structures.”
    • Available (with conditions) — Farm buildings and farm structures used for agricultural purposes under the county building and land-use restriction provisions of RSMo sections 64.800 to 64.905.
      “This section shall not apply to the erection, maintenance, repair, alteration or extension of farm buildings or farm structures used for such purposes in an area not within the area shown on the flood hazard area map.”
  • Subdividing landLimited

    Subdivision plats in the unincorporated areas of counties covered by RSMo section 64.070 after the county commission adopts subdivision regulations.

    • The county commission must first adopt subdivision regulations.
    • The plat must first be submitted to the planning commission.
    • If the county planning commission does not report upon the plat within thirty days, it may then be deemed approved.
    • If amended or rejected by the planning commission, the action may be overruled and the plat approved only by the county commission, with the reasons for overruling spread upon the county commission minutes.
    • The recorder of deeds may not record the plat until receiving a certificate of authority from the county zoning enforcement officer.
    • The statute also permits a county planning commission, upon written request of an incorporated area's legislative body where there is no municipal planning commission, to pass upon subdivision plats within that incorporated area; those plats are subject to county planning commission rules and approval procedures.

    planning commission reporting period: 30 days (If no report is made, the plat may then be deemed approved.)

    “After the county commission shall have adopted such subdivision regulations, no plat of a subdivision of land within the unincorporated area of such county [...]”
    One more reviewed finding on this topic
    • Limited — Subdivision regulations adopted by Missouri cities, towns, or villages under RSMo section 89.410.
      “The planning commission shall recommend and the council may by ordinance adopt regulations governing the subdivision of land within its jurisdiction.”
  • Driveway accessRequired

    Construction or modification of driveways within MoDOT right-of-way statewide.

    • A permit is required for construction of driveways and modifications to existing driveways on MoDOT right-of-way.
    • An initial online request must be submitted for each planned listed activity.
    • Engineered plans, traffic studies, hydraulic analysis, traffic-control plans, surety deposits, or performance bonds may be required depending on the work.
    • The rule does not establish a permit requirement for driveways outside MoDOT right-of-way.
    “We require you to obtain a permit to work on MoDOT's Right of Way for: Construction of driveways”
  • Building in a floodplainLimited

    Projects including mining, dredging, building construction, and other dirt-moving activities in designated flood hazard areas within participating Missouri jurisdictions.

    • The source describes local county or city flood damage reduction ordinances rather than one uniform statewide ordinance.
    • The project must be within a participating jurisdiction.
    • The project must be within a designated flood hazard area.
    • The cited rule does not apply if either condition is absent.
    • Covered projects must not raise flood heights.
    “Some jurisdictions (for example, county, city) require any projects in certain floodplains do not raise flood heights.”
    2 more reviewed findings on this topic
    • Required — Development in a floodplain in Missouri, including development administered by the Dade County floodplain administrator.
      “Regardless, some type of permit MUST be issued for ALL development in the floodplain. An Engineering “No-Rise” Certificate is required for all proposed development in the regulatory floodway, and must be obtained by the community before the floodplain development permit may be issued.”
    • Required — All development in a Missouri floodplain, administered through the applicable community floodplain permitting process.
      “Regardless, some type of permit MUST be issued for ALL development in the floodplain.”
  • Permit feesPublished (with conditions)

    Missouri Department of Natural Resources air construction permits statewide.

    • Fees apply to air construction permits, not to every Missouri building or land-use permit.
    • Construction permit fees include a filing fee and an hourly processing fee.
    • The filing fee depends on the type of construction permit.
    • The listed fees are effective January 1, 2026.
    • Fees applicable until December 31, 2025 are available on the Air Construction Permit Fees white sheet.
    • A convenience fee is charged for electronic payment.

    portable source relocation filing fee: 300 USD · minor permit filing fee: 300 USD · minor permit processing fee: per 100 USD (hour) · general permit filing fee: 700 USD · new source review filing fee: 6000 USD (plus $100 per hour processing fee) · prevention of significant deterioration filing fee: 6000 USD (plus $100 per hour processing fee) · hazardous air pollutant filing fee: 6000 USD (plus $100 per hour processing fee) · temporary or pilot filing fee: 250 USD (plus $100 per hour processing fee)

    “Construction permit fees include a filing fee and an hourly processing fee. The filing fee is dependent on the type of construction permit.”
    One more reviewed finding on this topic
    • Published (with conditions) — Missouri onsite wastewater treatment system construction, modification, and repair application fees administered under the statewide DHSS OWTS program.
      “Effective August 28, 2026, [...] the application fees associated with on-site sewage disposal system construction, modifications, and repairs will be temporarily suspended.”
  • Permit processPublished (with conditions)

    Installation or repair of most onsite wastewater treatment systems in Missouri.

    • Some single-family residential lots may be exempt from permitting.
    • The applicant must determine which agency has permitting authority where the work is being done.
    • DHSS permitting may be administered by the DHSS Onsite Program, a local authority under contract, or a local authority via ordinance.
    • Work should not begin until a permit has been issued or an exemption has been confirmed.
    • DHSS regulates single-family residential systems and onsite or cluster systems treating domestic wastewater flows of 3,000 gallons per day or less that disperse wastewater through soil treatment or absorption systems.
    • DNR regulates other systems, including non-single-family lagoons, systems discharging to surface waters, systems over 3,000 gallons per day, and industrial wastewater systems.
    • DNR must approve subdivisions, mobile home parks, and campgrounds if OWTS use is planned.

    domestic wastewater flow threshold: <= 3000 gallons per day (Systems above this threshold are regulated by DNR when they disperse wastewater through soil treatment or absorption systems.)

    “A construction permit is required before installing or repairing most onsite wastewater treatment systems (OWTS). Some single family residential lots may be exempt from permitting.”
    One more reviewed finding on this topic
    • Published (with conditions) — Permit applications for work on Missouri Department of Transportation right-of-way statewide.
      “Contact the Traffic Specialist a minimum of 48 hours prior to beginning work and for all necessary inspections.”
  • county zoning authorityLimited

    Missouri county zoning authority over unincorporated land.

    • RSMo § 64.850 applies to counties of the first class without a charter and counties of the second, third, or fourth class.
    • RSMo § 64.620 applies to counties of the second or third class to which §§ 64.510–64.690 apply.
    • Adoption under §§ 64.510–64.690 requires approval by vote of the people under § 64.530.
    • The authority applies in unincorporated portions and not incorporated portions.
    • The regulations must be in accordance with a comprehensive plan.
    • Under § 64.090, the zoning power does not apply to raising crops, livestock, orchards, or forestry; seasonal or temporary rice-farming or flood-irrigation impoundments; specified farm structures outside mapped flood-hazard areas; or underground mining entered through shafts outside mapped flood-hazard areas.
    • Existing lawful uses and specified public-utility services are protected under the cited statutory schemes.
    “the county commission of any county of the first class not having a charter form of government, or of any county of the second, third or fourth class may, after approval by vote of the people as provided in section 64.845, regulate and restrict, by order of record, in the unincorporated portions of the county, the height, number of stories, and size of buildings, the percentage of lots that may be occupied, the size of yards, courts and other open spaces, the density of population, the location and use of buildings, structures and land for trade, industry, residence or other purposes.”
    2 more reviewed findings on this topic
  • county building authorityLimited

    County authority to regulate residential construction and issue building permits in unincorporated areas of Missouri.

    • The authority under sections 64.170 to 64.200 applies to counties of the first and second classification.
    • A county that had not adopted a building code before August 28, 2001, must obtain voter approval before adopting one under those sections.
    • Only voters in the area affected by the proposed code may vote; incorporated-territory citizens cannot vote on a code affecting a county.
    • The county commission must hold at least three public hearings and provide the statutory newspaper publication and county posting notices before adoption.
    • Regulations adopted under section 64.180 apply to unincorporated territory, except as otherwise provided.
    • Adopted or amended codes after August 28, 2001, must use a current, calendar year 1999 or later edition of a nationally recognized building code, as amended.
    • A county building ordinance may not conflict with liquefied petroleum gas installations governed by section 323.020.

    public hearings before adoption: >= 3 hearings minimum (Section 64.180(3)) · newspaper notice: >= 15 days (Notice of hearing time and place must be published in at least two newspapers having general circulation within the county) · posted notice: >= 15 days (Notice must be posted in four conspicuous places in the county) · minimum nationally recognized building-code edition: >= calendar year 1999 edition year (Applies after August 28, 2001, under section 64.180)

    “The regulations adopted shall be applicable to the unincorporated territory of the county, except as otherwise provided herein”
    2 more reviewed findings on this topic
    • Limited — County regulation of construction and issuance of building permits for buildings, including residential construction, in Missouri counties, with the practical focus on county-controlled areas outside incorporated territory.
      “the county commission in all counties of the first and second classification [...] is for this purpose empowered [...] to adopt [...] regulations to control the construction”
    • Limited — Missouri counties' authority to require permits and regulate residential construction in unincorporated areas.
      “Before the adoption of such code of regulations, the county commission shall hold at least three public hearings thereon”

Inside cities and towns in Dade County

Municipal rules found while researching the county. They apply inside that city or town, not to unincorporated land.

  • Building code adoptedAdopted (with conditions)

    Buildings and structures within the City of Greenfield, including detached one- and two-family dwellings, multiple single-family dwellings not more than three stories above grade plane with separate egress, accessory structures, and other structures.

    • For detached one- and two-family dwellings and specified related structures, the code states that the BOCA National Building Code, Thirteenth Edition, 1996, is adopted.
    • For other structures, the International Building Code, 2012 Edition, including Appendix Chapters D, E, and F, is adopted.
    • The page states that Ordinance No. 8-2013 was adopted on November 19, 2013.
    • The page provides a building or occupancy permit fee schedule of $50 for the first 2,000 square feet plus $0.05 per square foot thereafter.
    • The page states the ordinance's effective date is the date it was passed and approved by the City's aldermen.

    building or occupancy permit fee: 50 USD for first 2000 square feet (plus $0.05 per square foot thereafter) · building or occupancy permit fee after first 2000 square feet: per 0.05 USD per square foot

    “being marked and designated as the International Building Code, 2012 Edition [...] be and is hereby adopted as the Building Code of the City of Greenfield”
  • Local zoningPresent (with conditions)

    Land-use controls within the corporate limits of the City of Greenfield, Dade County, Missouri.

    • The code includes chapters concerning subdivision plats, manufactured homes, temporary housing, and a special economic redevelopment zone.
    • The cited page is the City of Greenfield municipal code hosted by eCode360.
    “Title IV Zoning Code [...] Chapter 400 Subdivision Plats — Acceptance [...] Chapter 405 Manufactured Homes”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Certificate of occupancy — Certificates of occupancy for residential buildings in Dade County, including unincorporated areas.
  • Minimum lot size — Minimum lot size in unincorporated Dade County, Missouri.
  • Building height — Building height in unincorporated Dade County, Missouri.
  • Living in an RV — Long-term or residential occupancy of recreational vehicles on private land in Dade County, including unincorporated areas.
  • Tiny homes — Occupancy of tiny homes on private land in Dade County, including unincorporated areas.
3 more unanswered
  • Manufactured homes
  • Accessory dwellings
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Dade County, Missouri

Is Dade County a good place to live off-grid or homestead?

Dade County scores 76/100 on the Bolthole Index, a strong county profile. Its strengths: low administrative friction for a quiet rural property and manageable long-term carry cost.

How much does land cost in Dade County, Missouri?

Land in Dade County runs about $3,520 per acre, based on the latest county data.

What is the water situation in Dade County?

Dade County gets about 44.8" of rain a year, with severe drought in roughly 6.8% of years.

How remote is Dade County?

A representative private-land location has about 7,008 people within a 30-minute drive and 1,250,694 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Dade compares in Missouri