Unincorporated Bollinger County, Missouri does not require a building permit and has no countywide zoning ordinance1. The Missouri Department of Health and Senior Services handles onsite wastewater permits for Bollinger County2,3. Marble Hill has its own zoning process, and development in a mapped floodplain still requires a floodplain permit4,5.
Do you need a building permit in Bollinger County, Missouri?
Unincorporated Bollinger County does not require a building permit: the state's own county-by-county building-code inventory lists no adopted residential, commercial or energy code for the county.
Unincorporated Bollinger County does not require a building permit: the state's own county-by-county building-code inventory lists no adopted residential, commercial or energy code for the county1. Missouri law only lets counties of the first and second classification adopt a building-permit and inspection program under RSMo 64.170, and a county that had not adopted one before August 28, 2001 needs voter approval to start9. One exception applies everywhere in the county: if any part of a project sits in a mapped Special Flood Hazard Area, some type of floodplain development permit must be issued before that specific work, even though ordinary buildable land outside the floodplain needs no permit5. If a project disturbs one acre or more of land, or is part of a larger development that will eventually disturb an acre, a separate state land-disturbance stormwater permit is required regardless of the county's own building-permit status8.
Who handles building, zoning and environmental permitting in Bollinger County?
Bollinger County has no separate building, planning or zoning department.
Bollinger County has no separate building, planning or zoning department1. The County Commission, based at the courthouse in Marble Hill, is the county's general governing body and the right first call for county-road access or a land-use question without a dedicated office10. The County Clerk handles county records and administration and can point callers to the appropriate county office10. The Bollinger County Health Center handles environmental services, including sewage questions, sewage-permit fees and private-water-system information11. Missouri DHSS, rather than the county health center, is the identified onsite wastewater permitting authority for Bollinger County2,3. For a floodplain development permit, ask the County Commission or Health Center for the current local contact because a separate floodplain-office number could not be confirmed5,10,11.
Does Bollinger County have zoning?
Bollinger County has no countywide zoning ordinance for unincorporated land.
Bollinger County has no countywide zoning ordinance for unincorporated land1. That county answer does not extend inside Marble Hill: the city publishes a zoning-change application, so confirm the parcel's district and current standards with the city before buying or building there4. Zoning in Glen Allen and Sedgewickville could not be confirmed. Minimum lot size, setbacks, building height and lot coverage also remain unconfirmed for unincorporated Bollinger County, so ask the County Commission about the specific parcel rather than treating the land as unrestricted10. Missouri law allows qualifying non-charter counties to adopt zoning for unincorporated territory only after voter approval12. Missouri's agricultural protections are conditional, not a blanket exemption from every land-use rule: qualifying farm buildings used for agricultural purposes receive protection outside mapped flood-hazard areas, and county fire-prevention ordinances cannot require permits for qualifying farm structures13,14. New manufactured homes generally must still be anchored and tied down7.
How do septic permits work in Bollinger County?
The Missouri Department of Health and Senior Services is the onsite wastewater permitting authority for Bollinger County.
The Missouri Department of Health and Senior Services is the onsite wastewater permitting authority for Bollinger County2,3. A construction permit is required to install or repair an onsite system on most residential property under 3 acres, although a single-family tract may qualify for an exemption that DHSS should confirm for the parcel15. Only 5.8% of Bollinger County's soils are rated free of severe limits for a conventional drain field, so get the site evaluated before assuming a conventional system will work16. The Bollinger County Health Center says sewage permits are available for a fee but does not publish the amount, so confirm both the process and current cost with DHSS or the Health Center11. Missouri does not require a local health-agency inspection before most real-estate transfers, so buyers should not assume an existing system has already been checked17.
Can you live in an RV, mobile home or tiny home on your land in Bollinger County?
Long-term RV occupancy, temporary camping and tiny-home occupancy on a private unincorporated parcel in Bollinger County could not be confirmed; ask the County Commission and DHSS before relying on any of those uses.
Long-term RV occupancy, temporary camping and tiny-home occupancy on a private unincorporated parcel in Bollinger County could not be confirmed; ask the County Commission and DHSS before relying on any of those uses3,10. Missouri's separate rule for a campground does not answer the private-parcel question: DNR approval is required when a campground or RV park plans to use onsite wastewater treatment2. Marble Hill has a local zoning process, so property inside the city needs a separate city review4. New manufactured homes have a statewide siting rule: they generally must be anchored and tied down against overturning and sliding unless permanently attached to a foundation whose structural elements make separate anchoring unnecessary7. That anchoring requirement does not settle septic, floodplain or parcel-specific land-use questions7.
Building a home in Bollinger County: the steps, in order
Confirm whether the parcel is in unincorporated Bollinger County, where ordinary construction does not require a county building permit, or inside Marble Hill, where local zoning applies.
- Confirm whether the parcel is in unincorporated Bollinger County, where ordinary construction does not require a county building permit, or inside Marble Hill, where local zoning applies1,4.
- Check the flood map; development in a Special Flood Hazard Area needs a floodplain permit, and work in the regulatory floodway first needs an Engineering No-Rise Certificate5.
- If the project will disturb 1 acre or more, obtain the state land-disturbance stormwater permit before grading8.
- Contact Missouri DHSS about the septic construction permit before installing or repairing an onsite system on residential property under 3 acres2,3,15.
- Decide how the property will get water. A Bollinger County landowner may install their own private well or pump without the state installer permit, but hired well construction, repair or pump work requires the appropriate permitted installer6.
- Ask the County Commission about access from a county road10. For a new or modified driveway within MoDOT right-of-way, submit MoDOT's initial online request; MoDOT may require plans, studies, analysis, traffic control or a bond18.
- Keep the MoDOT permit and approved plans at the job site, submit any lane-closure request at least 2 working days ahead, and contact the Traffic Specialist at least 48 hours before work begins19.
- Arrange the required anchoring for a new manufactured home unless its permanent foundation makes separate anchoring unnecessary7.
What to check before you buy land in Bollinger County
Soils: only 5.8% of Bollinger County's soils are rated free of severe limits for a conventional septic drain field, so get a DHSS site evaluation before assuming a conventional system will work.
Soils: only 5.8% of Bollinger County's soils are rated free of severe limits for a conventional septic drain field, so get a DHSS site evaluation before assuming a conventional system will work3,16. Water: confirm the source and well condition; a landowner may install their own private well or pump without the state installer permit, but hired construction, repair or pump work requires a permitted installer6. Terrain: 63.7% of the land is at 15% slope or less and 62.5% is wooded, which can affect clearing, driveway grades and septic layout16. Flood risk: development in a mapped Special Flood Hazard Area requires a floodplain permit5. Access: a new or modified driveway within MoDOT right-of-way needs a MoDOT permit, while county-road access should be checked with the County Commission10,18. Jurisdiction: confirm whether the parcel is unincorporated or inside Marble Hill because the city has its own zoning process1,4. Taxes: Bollinger County's effective property tax rate is about 0.6%, and the median annual property tax bill is about $87416. Market: the typical home value is about $198,050, while farmland averages roughly $3,609 per acre16.
Watch-outs
- For anything not covered here, start with the Bollinger County Commission or County Clerk at the courthouse in Marble Hill, or the Bollinger County Health Center for environmental questions, and expect to be referred to the right office10,11.
- Long-term RV use, temporary camping and tiny-home occupancy on a private unincorporated parcel remain unconfirmed; the state wastewater rule for campgrounds does not answer those private-parcel questions2.
- A floodplain development permit is required for all development inside Bollinger County's mapped Special Flood Hazard Areas even though ordinary land outside the floodplain needs no building permit at all, so check the flood map before you buy5.
Sources
19 official pages, each quoted and re-checked · written October 3, 2026
- Bollinger County 2025 Multi-Jurisdictional Hazard Mitigation Plan (2026 county census)
- OWTS Construction Permit Process
- Missouri DHSS Onsite Wastewater Treatment Program (Bollinger County) (health.mo.gov)
- City of Marble Hill - Your Community, Your Voice
- Floodplain Forms
- Water Wells - PUB2945
- Missouri Revised Statutes Section 700.065
- Construction Land Disturbance Permits
- RSMo § 64.170 — County commissions control construction and issue building permits (Missouri statewide rule)
- Bollinger County Presiding Commissioner (mocounties.com)
- Bollinger County Health Center (bollingercountyhealth.org)
- RSMo § 64.090 — Planning and zoning powers of county commission (Missouri statewide rule)
- RSMo Section 64.620 — Building restrictions — limitations on regulations
- RSMo Section 64.003 — Farm buildings and farm structures (Missouri statewide rule)
- OWTS Construction Permit Process
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Onsite Wastewater Treatment System Inspections Versus Evaluations (Missouri statewide rule)
- Permits
- Permits
Written October 3, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Bollinger County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.