Bolthole Index

Bollinger County, Missouri

Building permits, zoning and septic rules in Bollinger County, Missouri

80Index Score / 100
#3 of 115 in Missouri

Unincorporated Bollinger County, Missouri does not require a building permit and has no countywide zoning ordinance1. The Missouri Department of Health and Senior Services handles onsite wastewater permits for Bollinger County2,3. Marble Hill has its own zoning process, and development in a mapped floodplain still requires a floodplain permit4,5.

Do you need a building permit in Bollinger County, Missouri?

Unincorporated Bollinger County does not require a building permit: the state's own county-by-county building-code inventory lists no adopted residential, commercial or energy code for the county.

Unincorporated Bollinger County does not require a building permit: the state's own county-by-county building-code inventory lists no adopted residential, commercial or energy code for the county1. Missouri law only lets counties of the first and second classification adopt a building-permit and inspection program under RSMo 64.170, and a county that had not adopted one before August 28, 2001 needs voter approval to start9. One exception applies everywhere in the county: if any part of a project sits in a mapped Special Flood Hazard Area, some type of floodplain development permit must be issued before that specific work, even though ordinary buildable land outside the floodplain needs no permit5. If a project disturbs one acre or more of land, or is part of a larger development that will eventually disturb an acre, a separate state land-disturbance stormwater permit is required regardless of the county's own building-permit status8.

Who handles building, zoning and environmental permitting in Bollinger County?

Bollinger County has no separate building, planning or zoning department.

Bollinger County has no separate building, planning or zoning department1. The County Commission, based at the courthouse in Marble Hill, is the county's general governing body and the right first call for county-road access or a land-use question without a dedicated office10. The County Clerk handles county records and administration and can point callers to the appropriate county office10. The Bollinger County Health Center handles environmental services, including sewage questions, sewage-permit fees and private-water-system information11. Missouri DHSS, rather than the county health center, is the identified onsite wastewater permitting authority for Bollinger County2,3. For a floodplain development permit, ask the County Commission or Health Center for the current local contact because a separate floodplain-office number could not be confirmed5,10,11.

Does Bollinger County have zoning?

Bollinger County has no countywide zoning ordinance for unincorporated land.

Bollinger County has no countywide zoning ordinance for unincorporated land1. That county answer does not extend inside Marble Hill: the city publishes a zoning-change application, so confirm the parcel's district and current standards with the city before buying or building there4. Zoning in Glen Allen and Sedgewickville could not be confirmed. Minimum lot size, setbacks, building height and lot coverage also remain unconfirmed for unincorporated Bollinger County, so ask the County Commission about the specific parcel rather than treating the land as unrestricted10. Missouri law allows qualifying non-charter counties to adopt zoning for unincorporated territory only after voter approval12. Missouri's agricultural protections are conditional, not a blanket exemption from every land-use rule: qualifying farm buildings used for agricultural purposes receive protection outside mapped flood-hazard areas, and county fire-prevention ordinances cannot require permits for qualifying farm structures13,14. New manufactured homes generally must still be anchored and tied down7.

How do septic permits work in Bollinger County?

The Missouri Department of Health and Senior Services is the onsite wastewater permitting authority for Bollinger County.

The Missouri Department of Health and Senior Services is the onsite wastewater permitting authority for Bollinger County2,3. A construction permit is required to install or repair an onsite system on most residential property under 3 acres, although a single-family tract may qualify for an exemption that DHSS should confirm for the parcel15. Only 5.8% of Bollinger County's soils are rated free of severe limits for a conventional drain field, so get the site evaluated before assuming a conventional system will work16. The Bollinger County Health Center says sewage permits are available for a fee but does not publish the amount, so confirm both the process and current cost with DHSS or the Health Center11. Missouri does not require a local health-agency inspection before most real-estate transfers, so buyers should not assume an existing system has already been checked17.

Can you live in an RV, mobile home or tiny home on your land in Bollinger County?

Long-term RV occupancy, temporary camping and tiny-home occupancy on a private unincorporated parcel in Bollinger County could not be confirmed; ask the County Commission and DHSS before relying on any of those uses.

Long-term RV occupancy, temporary camping and tiny-home occupancy on a private unincorporated parcel in Bollinger County could not be confirmed; ask the County Commission and DHSS before relying on any of those uses3,10. Missouri's separate rule for a campground does not answer the private-parcel question: DNR approval is required when a campground or RV park plans to use onsite wastewater treatment2. Marble Hill has a local zoning process, so property inside the city needs a separate city review4. New manufactured homes have a statewide siting rule: they generally must be anchored and tied down against overturning and sliding unless permanently attached to a foundation whose structural elements make separate anchoring unnecessary7. That anchoring requirement does not settle septic, floodplain or parcel-specific land-use questions7.

Building a home in Bollinger County: the steps, in order

Confirm whether the parcel is in unincorporated Bollinger County, where ordinary construction does not require a county building permit, or inside Marble Hill, where local zoning applies.

  1. Confirm whether the parcel is in unincorporated Bollinger County, where ordinary construction does not require a county building permit, or inside Marble Hill, where local zoning applies1,4.
  2. Check the flood map; development in a Special Flood Hazard Area needs a floodplain permit, and work in the regulatory floodway first needs an Engineering No-Rise Certificate5.
  3. If the project will disturb 1 acre or more, obtain the state land-disturbance stormwater permit before grading8.
  4. Contact Missouri DHSS about the septic construction permit before installing or repairing an onsite system on residential property under 3 acres2,3,15.
  5. Decide how the property will get water. A Bollinger County landowner may install their own private well or pump without the state installer permit, but hired well construction, repair or pump work requires the appropriate permitted installer6.
  6. Ask the County Commission about access from a county road10. For a new or modified driveway within MoDOT right-of-way, submit MoDOT's initial online request; MoDOT may require plans, studies, analysis, traffic control or a bond18.
  7. Keep the MoDOT permit and approved plans at the job site, submit any lane-closure request at least 2 working days ahead, and contact the Traffic Specialist at least 48 hours before work begins19.
  8. Arrange the required anchoring for a new manufactured home unless its permanent foundation makes separate anchoring unnecessary7.

What to check before you buy land in Bollinger County

Soils: only 5.8% of Bollinger County's soils are rated free of severe limits for a conventional septic drain field, so get a DHSS site evaluation before assuming a conventional system will work.

Soils: only 5.8% of Bollinger County's soils are rated free of severe limits for a conventional septic drain field, so get a DHSS site evaluation before assuming a conventional system will work3,16. Water: confirm the source and well condition; a landowner may install their own private well or pump without the state installer permit, but hired construction, repair or pump work requires a permitted installer6. Terrain: 63.7% of the land is at 15% slope or less and 62.5% is wooded, which can affect clearing, driveway grades and septic layout16. Flood risk: development in a mapped Special Flood Hazard Area requires a floodplain permit5. Access: a new or modified driveway within MoDOT right-of-way needs a MoDOT permit, while county-road access should be checked with the County Commission10,18. Jurisdiction: confirm whether the parcel is unincorporated or inside Marble Hill because the city has its own zoning process1,4. Taxes: Bollinger County's effective property tax rate is about 0.6%, and the median annual property tax bill is about $87416. Market: the typical home value is about $198,050, while farmland averages roughly $3,609 per acre16.

Watch-outs

  • For anything not covered here, start with the Bollinger County Commission or County Clerk at the courthouse in Marble Hill, or the Bollinger County Health Center for environmental questions, and expect to be referred to the right office10,11.
  • Long-term RV use, temporary camping and tiny-home occupancy on a private unincorporated parcel remain unconfirmed; the state wastewater rule for campgrounds does not answer those private-parcel questions2.
  • A floodplain development permit is required for all development inside Bollinger County's mapped Special Flood Hazard Areas even though ordinary land outside the floodplain needs no building permit at all, so check the flood map before you buy5.

Sources

19 official pages, each quoted and re-checked · written October 3, 2026

  1. Bollinger County 2025 Multi-Jurisdictional Hazard Mitigation Plan (2026 county census)
  2. OWTS Construction Permit Process
  3. Missouri DHSS Onsite Wastewater Treatment Program (Bollinger County) (health.mo.gov)
  4. City of Marble Hill - Your Community, Your Voice
  5. Floodplain Forms
  6. Water Wells - PUB2945
  7. Missouri Revised Statutes Section 700.065
  8. Construction Land Disturbance Permits
  9. RSMo § 64.170 — County commissions control construction and issue building permits (Missouri statewide rule)
  10. Bollinger County Presiding Commissioner (mocounties.com)
  11. Bollinger County Health Center (bollingercountyhealth.org)
  12. RSMo § 64.090 — Planning and zoning powers of county commission (Missouri statewide rule)
  13. RSMo Section 64.620 — Building restrictions — limitations on regulations
  14. RSMo Section 64.003 — Farm buildings and farm structures (Missouri statewide rule)
  15. OWTS Construction Permit Process
  16. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  17. Onsite Wastewater Treatment System Inspections Versus Evaluations (Missouri statewide rule)
  18. Permits
  19. Permits

Written October 3, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 4 of the neighbors with published rules, Bollinger County has no countywide zoning.

RuleBollinger CountyMadison CountyCape Girardeau CountyPerry CountySte. Genevieve CountyIron CountyScott County
Building permitNot requiredNot requiredNot requiredNot requiredRequiredNot requiredNot required
County zoningNoNoNoNoNot publishedNot publishedNo
Septic permitsDHSSMO Dept. of Health & Senior ServicesCounty Public Health CenterDHSSCounty Health Dept.DHSSCounty Health Dept.

County locator

Bollinger County in Missouri

80
County map
Bollinger County highlighted among the Missouri counties · colored by Index score

How Bollinger County scores

80 / 100 · #3 of 115 in Missouri · six factors, land price, tax, rain and climate

Seclusion75100% ev.
Self-Sufficiency67100% ev.
Admin Boringness8790% ev.
Durability52100% ev.
Property Autonomy47100% ev.
Carry Cost83100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$198kTypical home
0.6%Property tax
$3,609Land / acre
49"Annual rain
2.9% of yrsSevere drought
12 / yr (+10.6)Mid-century 100°F days
17.1 daysMid-century dry spell
2.27" (+6.3%)Mid-century 1-day rain
1.79×Wildfire change factor
100%Forward climate coverage
$1,868Home insurance / yr
1.5% / yrInsurance growth
1.19%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
9,098People within 30 min
735,874People within 2 hr
18,501Radius comparison (15 mi)
17.1People / sq mi
1.1%Federal land
63.7%Land at 15% slope or less
5.8%Soils rated "not limited" for septic (strict USDA rating)
22,826 acWorkable land screen
62.5%Wooded land
44.6 tonsBiomass / forest ac
56.7°FAvg temp

Scout Bollinger County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Bollinger County. Listing sites control their own results and filters.

Sell land in Bollinger County? Be the only seller on this page →

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Bollinger County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Town of Glen Allen · Marble Hill · Village of Sedgewickville

Answers from the rulebook for Bollinger County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Bollinger County rules

  • Building permitNot required

    Structures built outside the Special Flood Hazard Area in unincorporated Bollinger County.

    • The cited plan limits this finding to structures built outside the SFHA.
    • The plan lists a county Floodplain Ordinance as "Yes (2018)" and identifies flood-only zoning/land-use and building-site/design restrictions; this claim does not address floodplain development requirements.
    “It should be noted that the county has no building codes or regulations for structures built outside the SFHA.”
  • Owner-builder exemption · follows from the permit answerNot needed

    Unincorporated Bollinger County: no county building permit is required, so there is no permit to be exempt from and you may build your own home. State licensing for electrical, plumbing and HVAC work may still apply.

    • The cited plan limits this finding to structures built outside the SFHA.
    • The plan lists a county Floodplain Ordinance as "Yes (2018)" and identifies flood-only zoning/land-use and building-site/design restrictions; this claim does not address floodplain development requirements.
    “It should be noted that the county has no building codes or regulations for structures built outside the SFHA.”
  • Building code adoptedNot adopted

    County building code for structures built outside the SFHA in unincorporated Bollinger County.

    • The plan's table identifies a Floodplain Ordinance as "Yes (2018)."
    • The finding is not a determination of municipal building codes.
    “It should be noted that the county has no building codes or regulations for structures built outside the SFHA.”
  • County-wide zoningAbsent

    County zoning in unincorporated Bollinger County.

    • The same table identifies flood-only zoning/land-use restrictions.
    • This does not address municipal zoning within incorporated areas.
    “Zoning Ordinance | | Status, Including Date of Document or No”
  • Local zoningVaries (with conditions)

    County aggregate of unincorporated Bollinger County and the City of Marble Hill; this is not a determination for every municipality or village in the county.

    • Unincorporated Bollinger County has no zoning ordinance according to the county profile.
    • The City of Marble Hill's official site publishes a zoning-change request and ordinance-variance application, indicating a municipal zoning process.
    • No readable municipal zoning text was available from the city site's linked documents during this coverage pass; district controls and dimensional standards are not established by this claim.
    “Zoning Change Request (pdf) Download Business Sign Permit (pdf) Download Business License Application (pdf) Download Ordinance Variance Application (pdf) Download”
  • Zoning districts · by state lawNot published

    Unincorporated Bollinger County: no county rule sets this, because Bollinger County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • The same table identifies flood-only zoning/land-use restrictions.
    • This does not address municipal zoning within incorporated areas.
    “Zoning Ordinance | | Status, Including Date of Document or No”
  • Minimum dwelling size · by state lawNone

    Unincorporated Bollinger County: no county rule sets this, because Bollinger County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • The same table identifies flood-only zoning/land-use restrictions.
    • This does not address municipal zoning within incorporated areas.
    “Zoning Ordinance | | Status, Including Date of Document or No”
  • Minimum lot size · by state lawNone

    Unincorporated Bollinger County: no county rule sets this, because Bollinger County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • The same table identifies flood-only zoning/land-use restrictions.
    • This does not address municipal zoning within incorporated areas.
    “Zoning Ordinance | | Status, Including Date of Document or No”
  • Setbacks · by state lawNone

    Unincorporated Bollinger County: no county rule sets this, because Bollinger County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • The same table identifies flood-only zoning/land-use restrictions.
    • This does not address municipal zoning within incorporated areas.
    “Zoning Ordinance | | Status, Including Date of Document or No”
  • Lot coverage · by state lawNone

    Unincorporated Bollinger County: no county rule sets this, because Bollinger County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • The same table identifies flood-only zoning/land-use restrictions.
    • This does not address municipal zoning within incorporated areas.
    “Zoning Ordinance | | Status, Including Date of Document or No”
  • Building height · by state lawNone

    Unincorporated Bollinger County: no county rule sets this, because Bollinger County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • The same table identifies flood-only zoning/land-use restrictions.
    • This does not address municipal zoning within incorporated areas.
    “Zoning Ordinance | | Status, Including Date of Document or No”
  • Living in an RV · by state lawUnrestricted

    Unincorporated Bollinger County: no county rule sets this, because Bollinger County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • The same table identifies flood-only zoning/land-use restrictions.
    • This does not address municipal zoning within incorporated areas.
    “Zoning Ordinance | | Status, Including Date of Document or No”
  • Tiny homes · by state lawUnrestricted

    Unincorporated Bollinger County: no county rule sets this, because Bollinger County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • The same table identifies flood-only zoning/land-use restrictions.
    • This does not address municipal zoning within incorporated areas.
    “Zoning Ordinance | | Status, Including Date of Document or No”
  • Accessory dwellings · by state lawUnrestricted

    Unincorporated Bollinger County: no county rule sets this, because Bollinger County's own reviewed answer confirms it has no county-wide zoning ordinance.

    • Septic, floodplain, subdivision and health rules still apply; cities and towns set their own rules inside their limits.
    • The same table identifies flood-only zoning/land-use restrictions.
    • This does not address municipal zoning within incorporated areas.
    “Zoning Ordinance | | Status, Including Date of Document or No”
  • Building in a floodplainRequired

    All development in the floodplain in Bollinger County, administered by the listed local floodplain administrator; mapped floodplain applicability must be determined for the site.

    • Some type of permit must be issued for all development in the floodplain.
    • Development outside the floodplain is not covered by this floodplain-permit rule.
    • An Engineering No-Rise Certificate is required for all proposed development in the regulatory floodway before the community may issue the floodplain development permit.
    • Bollinger County's listed floodplain administrator is Mike Henson; incorporated communities may have separate administrators.
    “Regardless, some type of permit MUST be issued for ALL development in the floodplain. An Engineering “No-Rise” Certificate is required for all proposed development in the regulatory floodway, and must be obtained by the community before the floodplain development permit may be issued.”
  • Permit feesVariable (with conditions)

    Onsite sewage permits for properties in Bollinger County.

    • The Bollinger County Health Center states that sewage permits are available for a fee, but it does not publish the fee amount on the cited page.
    • The 2024 county annual report states that onsite sewage permits are provided via Missouri DHSS.

    permit fee: fee amount not stated

    “Sewage permits are available for a fee”

Missouri rules that apply here

  • InspectionsLimited

    Construction, major modification, or major repair of an on-site sewage disposal system for which RSMo 701.046 requires notice and an application; this is not a general statewide inspection rule for all buildings.

    • The city, county, or department must receive notice and an opportunity to inspect before completion.
    • A registered contractor must notify the authority before 9:00 a.m. on the day before completion; an unregistered person must notify it before 9:00 a.m. on the second day before completion.
    • The system must remain available for a complete inspection under the state standard until 3:00 p.m. on the completion day unless the authority confirms earlier inspection and approval.
    • The system may not be closed or completed if inspection finds it does not meet the state standard; the authority must provide conspicuous notice at inspection and written confirmation of the result, or of no inspection, within three working days of completion.
    “without providing notice and an opportunity for inspection by the city, county or department as provided in this section.”
  • Camping on your landLimited

    Developments where land is sold or leased for camping in recreational vehicles (recreational developments) under the state wastewater rule 10 CSR 20-6.030; this is a wastewater-disposal rule, not a zoning rule on camping generally

    • Applies only when land is sold or leased for the purpose of camping in recreational vehicles.
    • To qualify as a recreational development, restrictive covenants must prohibit continuous year-round living on the lot, and no cabins or other structures that could be used for year-round residential purposes are allowed.
    • Minimum lot size of 20,000 sq ft applies where individual on-site wastewater treatment facilities are used; no reduction from the minimum lot size determined by the geohydrologic evaluation, though a one-half reduction as indicated by the soils report may be allowed.
    • Where sewage dump stations provide collection and treatment, they count as centralized collection and treatment.
    • The developer must submit a copy of the restrictive covenants with any plans for dump stations or centralized systems.
    • Any residential housing development required to obtain department approval must get written approval before sale or lease of any lot or start of construction.
    • Rule text says it does not preclude local, municipal, county or other lawful authority from adopting equal or more stringent subdivision, sewer or on-site system regulations.
    • Rule was last amended with an effective date of Jan. 30, 2025.
    • The state rule does not itself regulate temporary camping on private land outside such developments; that is left to local zoning.

    minimum lot size, recreational development with individual on-site wastewater treatment: >= 20000 square feet (one-half reduction per soils report may be allowed; no reduction from geohydrologic evaluation minimum)

    “a development is considered recreational when land is sold or leased for the purpose of camping in recreational vehicles. in order to be considered a recreational development, restrictive covenants must prohibit continuous year-round living on the lot and no cabins or other structures will be allowed that could be used for year-round residential purposes.”
  • Manufactured homesLimited

    New manufactured homes located in Missouri, including Bollinger County, subject to statewide anchoring and tie-down requirements.

    • All new manufactured homes located in Missouri must be anchored and tied down under the standards referenced in RSMo sections 700.010 to 700.115 and 700.650 to 700.692.
    • The owner must secure the manufactured home to the ground with anchors and tiedowns to resist wind overturning and sliding.
    • Anchors and tiedowns are not required when the manufactured home is permanently attached to a permanent structure with a foundation and structural elements assuring rigidity and stability.
    • The statute does not resolve any additional municipal, county, floodplain, septic, or site-specific requirements.
    “All new manufactured homes located in this state shall be anchored and tied down in accordance with the standards promulgated by the commission pursuant to the provisions of sections 700.010 to 700.115 and 700.650 to 700.692.”
  • Who permits septicMixed (with conditions)

    Onsite wastewater treatment systems statewide in Missouri.

    • DHSS administers minimum standards and permits through DHSS, local contract authorities, or local authorities operating under ordinance.
    • County or city governments may adopt standards stricter than the state standard.
    • DNR regulates lagoons serving anything other than single-family residences, systems discharging to surface waters, systems treating flows greater than 3,000 gallons per day and dispersing through soil absorption systems, and industrial wastewater systems.
    • DNR approval is required for subdivisions, mobile home parks, and campgrounds when OWTS use is planned.

    domestic wastewater flow threshold: <= 3000 gallons per day (DNR regulates systems with flows greater than 3,000 gallons per day when wastewater is dispersed through soil treatment or absorption systems)

    “DHSS OWTS permitting falls under one of three authority types: DHSS Onsite Program, Local Authority (contract), or Local Authority via Ordinance. The application process varies by permitting authority.”
    2 more reviewed findings on this topic
    • State — Onsite wastewater treatment permitting for Bollinger County.
      “Authority Type: DHSS [...] County: Bollinger”
    • Mixed — Missouri wastewater treatment systems, including domestic onsite systems, larger-flow systems, direct discharges, lagoons, subdivisions, and industrial wastewater.
      “In Missouri, different state and local agencies are responsible for regulating wastewater treatment systems.”
  • Septic permitRequired

    Installing or repairing most onsite wastewater treatment systems in Missouri, including residential systems subject to state permitting.

    • A construction permit is required before installing or repairing most OWTS.
    • Some single-family residential lots may be exempt.
    • For residential property less than three acres, a permit is required; the exemption does not apply in some counties, so the county authority must be checked.
    • Work should not begin until a permit is issued or an exemption is confirmed.
    • Effective August 28, 2026, application fees for onsite sewage disposal system construction, modifications, and repairs are temporarily suspended.

    residential lot threshold: < 3 acres (The exemption does not apply in some counties.) · temporary permit-fee suspension effective date: 2026-08-28 (Applies to application fees associated with onsite sewage disposal system construction, modifications, and repairs.)

    “A construction permit is required before installing or repairing most onsite wastewater treatment systems (OWTS). Some single family residential lots may be exempt from permitting.”
    3 more reviewed findings on this topic
    • Limited — Installation or repair of onsite wastewater treatment systems in Bollinger County under Missouri requirements.
      “A construction permit is required to install or repair an onsite system on any residential property less than three acres.”
    • Required — Installing or repairing most onsite wastewater treatment systems statewide in Missouri.
      “A construction permit is required before installing or repairing most onsite wastewater treatment systems (OWTS). Some single family residential lots may be exempt from permitting.”
    • Required — Proposed campgrounds, mobile home parks, and subdivisions planning to use onsite wastewater treatment systems anywhere in Missouri.
      “DNR must approve subdivisions, mobile home parks and campgrounds if the use of OWTS is planned.”
  • Septic inspectionLimited

    Inspection or evaluation of existing onsite wastewater systems in connection with Missouri real-estate transfers.

    • Local public health agencies generally no longer inspect existing systems for real-estate transfers.
    • A private licensed inspector may perform an inspection or evaluation.
    • A lender, buyer, or other transaction participant may require an assessment.
    • Some local standards may be more stringent than state regulations.
    • Inspections and evaluations are distinct; an inspection includes a hydraulic test, while an evaluation does not.
    “For the most part, local public health agencies no longer inspect existing systems related to real estate transfer. The help of a licensed inspector can be obtained to check the condition of the system.”
    One more reviewed finding on this topic
    • Limited — Inspections of existing onsite sewage systems in connection with property sales statewide in Missouri.
      “Missouri Department of Health and Senior Services' (DHSS) rules governing onsite sewage systems cover minimum construction requirements, system inspections at the time of property sales, and requirements for percolation testers and soil evaluators.”
  • Off-grid sanitationLimited

    Off-grid domestic wastewater treatment using onsite wastewater treatment systems where central sewer service is unavailable.

    • Onsite systems treat and dispose of domestic sewage on the property where generated.
    • A construction permit is generally required, including for residential property less than three acres, subject to county-specific exceptions.
    • Wastewater may not be discharged into a road ditch or onto the ground.
    • Local permitting authorities may impose additional requirements.

    residential lot threshold: < 3 acres (The exemption does not apply in some counties.)

    “Onsite wastewater treatment systems are sometimes referred to as "septic systems." These systems treat and dispose of domestic sewage on the property where it is generated.”
    One more reviewed finding on this topic
    • Allowed (with conditions) — Use of onsite wastewater treatment systems as off-grid sanitation where central sewer service is unavailable in Missouri.
      “In Missouri, where central sewer service is not available, homeowners and small business owners use various types of onsite wastewater treatment systems (OWTS).”
  • Well permitLimited

    Construction or alteration of a public well serving a Missouri public water system.

    • Public water systems must receive written approval from the Missouri Department of Natural Resources Public Drinking Water Branch before constructing or altering a public well.
    • The requirement does not apply when the system meets the charitable-and-benevolent-organization exemptions in section 640.116, RSMo.
    • Anyone proposing to install a public well must contact the department’s regional office for a well-site survey.
    • The survey addresses minimum isolation or setback distances from known or potential contaminant sources, including septic tanks, sanitary sewer lines, and landfills.
    • Before applying for construction authorization, the public water system must obtain an estimated casing-depth letter from the Missouri Geological Survey Water Resources Center.
    • There is no fee for the well-site-survey and estimated-casing-depth-letter services.
    • Failure to obtain construction authorization may result in approval delays and possibly require the owner to properly plug the well and drill a new one according to 10 CSR 60-3.

    public water system threshold: at least 15 service connections or regularly serves an average of at least 25 individuals daily, at least 60 days per calendar year

    “Public water systems must receive written approval from the PDWB before constructing or altering a public well”
    3 more reviewed findings on this topic
    • Limited — Water-well construction, repair, pump installation, and public-water-system wells in Bollinger County under Missouri statewide regulation.
      “A non-restricted water well installation permit is required to construct or repair a water well in Missouri. [...] Landowners may install their own well or pump without a permit pursuant to the above mentioned law and rules.”
    • Required — A person or contractor conducting regulated work to drill, construct, repair, reconstruct, plug, or install pumps or pumping equipment in a water well, heat-pump well, monitoring well, or related well in Missouri.
      “A non-restricted permit is required to drill, construct, repair, reconstruct, plug, or install pumps or pumping equipment in a well.”
    • Limited — Construction or repair of water wells, installation or replacement of pumps, and associated plumbing and electrical work in Missouri.
      “A non-restricted water well installation permit is required to construct or repair a water well in Missouri.”
  • Mandatory utility hookupSewer (with conditions)

    Missouri state law preserves the authority of specified local governments and districts that own or operate a sewage-collection-and-treatment sewer system to require connection by owners of houses, buildings, or other facilities within that entity's territory.

    • This is an authorization for the applicable city, town, village, sewer district, public water supply district, municipality, political subdivision, or district; it is not a statewide mandate that every property connect.
    • The entity must own or operate a sewer system providing collection and treatment of sewage.
    • The house, building, or other facility must be within the municipality, political subdivision, or district.
    • The sewer system must be available.
    • The statute identifies sewer districts organized under chapter 204 or chapter 249 and public water supply districts organized under chapter 247 among the entities whose authority is preserved.
    “to require the owners of all houses, buildings or other facilities [...] to connect to the sewer system [...] when such sewer system is available.”
  • Agricultural exemptionAvailable (with conditions)

    Farm buildings and farm structures used for agricultural purposes under the county building and land-use restriction provisions of RSMo sections 64.800 to 64.905.

    • The exemption does not apply within incorporated portions of counties.
    • The exemption applies to raising crops, livestock, orchards, or forestry and to specified rice-farming or flood-irrigation impoundments.
    • For farm buildings or farm structures, the area must not be within the area shown on the flood hazard area map.
    • The statute preserves the validity of county ordinances or orders adopted before March 4, 1991.
    • Other laws and local requirements may still apply.

    rice-farming or flood-irrigation berm height: <= 18 inches (small berms placed around a field to hold water for growing rice or flood irrigation)

    “This section shall not apply to the erection, maintenance, repair, alteration or extension of farm buildings or farm structures used for such purposes in an area not within the area shown on the flood hazard area map.”
    5 more reviewed findings on this topic
    • Available (with conditions) — Agricultural activities and qualifying farm buildings or farm structures in counties regulated under RSMo sections 64.510 to 64.690.
      “This section shall not apply to [...] farm buildings or farm structures [...] in an area not within the area shown on the flood hazard area map.”
    • Available (with conditions) — Erection, maintenance, repair, alteration, or extension of farm buildings or farm structures as against county fire-protection or fire-prevention ordinances.
      “Notwithstanding any provision of law to the contrary, no fire protection or fire prevention ordinance adopted by any county in this state shall be exercised so as to impose regulations or to require permits with respect to the erection, maintenance, repair, alteration, or extension of farm buildings or farm structures.”
    • Available (with conditions) — Erection, maintenance, repair, alteration, or extension of farm buildings or farm structures used for agricultural purposes under RSMo section 64.890, outside incorporated portions of counties and outside areas shown on flood hazard area maps.
      “This section shall not apply to the erection, maintenance, repair, alteration or extension of farm buildings or farm structures used for such purposes [...]”
    • Available (with conditions) — Farm buildings and farm structures statewide, with respect to county fire-protection and fire-prevention ordinances.
      “no fire protection or fire prevention ordinance adopted by any county in this state shall be exercised so as to impose regulations or to require permits [...]”
    • Available — Erection, maintenance, repair, alteration, or extension of farm buildings or farm structures with respect to county fire-protection or fire-prevention ordinances.
      “Notwithstanding any provision of law to the contrary, no fire protection or fire prevention ordinance adopted by any county in this state shall be exercised so as to impose regulations or to require permits with respect to the erection, maintenance, repair, alteration, or extension of farm buildings or farm structures.”
  • Subdividing landLimited

    Subdivision plats in the unincorporated areas of counties covered by RSMo section 64.070 after the county commission adopts subdivision regulations.

    • The county commission must first adopt subdivision regulations.
    • The plat must first be submitted to the planning commission.
    • If the county planning commission does not report upon the plat within thirty days, it may then be deemed approved.
    • If amended or rejected by the planning commission, the action may be overruled and the plat approved only by the county commission, with the reasons for overruling spread upon the county commission minutes.
    • The recorder of deeds may not record the plat until receiving a certificate of authority from the county zoning enforcement officer.
    • The statute also permits a county planning commission, upon written request of an incorporated area's legislative body where there is no municipal planning commission, to pass upon subdivision plats within that incorporated area; those plats are subject to county planning commission rules and approval procedures.

    planning commission reporting period: 30 days (If no report is made, the plat may then be deemed approved.)

    “After the county commission shall have adopted such subdivision regulations, no plat of a subdivision of land within the unincorporated area of such county [...]”
    One more reviewed finding on this topic
    • Limited — Subdivision regulations adopted by Missouri cities, towns, or villages under RSMo section 89.410.
      “The planning commission shall recommend and the council may by ordinance adopt regulations governing the subdivision of land within its jurisdiction.”
  • Driveway accessRequired

    Construction or modification of driveways within MoDOT right-of-way statewide.

    • A permit is required for construction of driveways and modifications to existing driveways on MoDOT right-of-way.
    • An initial online request must be submitted for each planned listed activity.
    • Engineered plans, traffic studies, hydraulic analysis, traffic-control plans, surety deposits, or performance bonds may be required depending on the work.
    • The rule does not establish a permit requirement for driveways outside MoDOT right-of-way.
    “We require you to obtain a permit to work on MoDOT's Right of Way for: Construction of driveways”
    One more reviewed finding on this topic
    • Required — Construction or modification of driveways within MoDOT right-of-way in Bollinger County.
      “We require you to obtain a permit to work on MoDOT's Right of Way for: Construction of driveways; Modifications to existing driveways (e.g. proposed changes in width, grade, location, surface type, etc.)”
  • Permit processPublished (with conditions)

    Installation or repair of most onsite wastewater treatment systems in Missouri.

    • Some single-family residential lots may be exempt from permitting.
    • The applicant must determine which agency has permitting authority where the work is being done.
    • DHSS permitting may be administered by the DHSS Onsite Program, a local authority under contract, or a local authority via ordinance.
    • Work should not begin until a permit has been issued or an exemption has been confirmed.
    • DHSS regulates single-family residential systems and onsite or cluster systems treating domestic wastewater flows of 3,000 gallons per day or less that disperse wastewater through soil treatment or absorption systems.
    • DNR regulates other systems, including non-single-family lagoons, systems discharging to surface waters, systems over 3,000 gallons per day, and industrial wastewater systems.
    • DNR must approve subdivisions, mobile home parks, and campgrounds if OWTS use is planned.

    domestic wastewater flow threshold: <= 3000 gallons per day (Systems above this threshold are regulated by DNR when they disperse wastewater through soil treatment or absorption systems.)

    “A construction permit is required before installing or repairing most onsite wastewater treatment systems (OWTS). Some single family residential lots may be exempt from permitting.”
    3 more reviewed findings on this topic
    • Published (with conditions) — Missouri construction land-disturbance permits applicable to qualifying projects in Bollinger County.
      “Electronic Permitting is an online tool that allows users to apply for and obtain a Missouri Land Disturbance Stormwater General Operating Permit (MO-RAxxxxx). The department no longer processes MO-RAxxxxx paper applications.”
    • Published (with conditions) — Work in MoDOT right-of-way in Bollinger County, including driveway construction or modification on MoDOT right-of-way.
      “If your work requires a “Lane Closure” you must submit a request a minimum of 2 working days in advance and receive authorization from our staff before closing any lanes of traffic. [...] Contact the Traffic Specialist a minimum of 48 hours prior to beginning work and for all necessary inspections.”
    • Published (with conditions) — Permit applications for work on Missouri Department of Transportation right-of-way statewide.
      “Contact the Traffic Specialist a minimum of 48 hours prior to beginning work and for all necessary inspections.”
  • Campground & park staysLimited

    Campground operation, including recreational-vehicle parks, where onsite wastewater treatment systems are planned.

    • Missouri Department of Natural Resources approval is required for campgrounds if the use of onsite wastewater treatment systems is planned.
    • This claim addresses the stated wastewater condition only; it does not establish a general county or municipal permit, time limit, or long-term occupancy rule.
    “DNR must approve subdivisions, mobile home parks and campgrounds if the use of OWTS is planned.”
  • county zoning authorityLimited

    Missouri county zoning authority over unincorporated land.

    • RSMo § 64.850 applies to counties of the first class without a charter and counties of the second, third, or fourth class.
    • RSMo § 64.620 applies to counties of the second or third class to which §§ 64.510–64.690 apply.
    • Adoption under §§ 64.510–64.690 requires approval by vote of the people under § 64.530.
    • The authority applies in unincorporated portions and not incorporated portions.
    • The regulations must be in accordance with a comprehensive plan.
    • Under § 64.090, the zoning power does not apply to raising crops, livestock, orchards, or forestry; seasonal or temporary rice-farming or flood-irrigation impoundments; specified farm structures outside mapped flood-hazard areas; or underground mining entered through shafts outside mapped flood-hazard areas.
    • Existing lawful uses and specified public-utility services are protected under the cited statutory schemes.
    “the county commission of any county of the first class not having a charter form of government, or of any county of the second, third or fourth class may, after approval by vote of the people as provided in section 64.845, regulate and restrict, by order of record, in the unincorporated portions of the county, the height, number of stories, and size of buildings, the percentage of lots that may be occupied, the size of yards, courts and other open spaces, the density of population, the location and use of buildings, structures and land for trade, industry, residence or other purposes.”
    2 more reviewed findings on this topic
  • county building authorityLimited

    County authority to regulate residential construction and issue building permits in unincorporated areas of Missouri.

    • The authority under sections 64.170 to 64.200 applies to counties of the first and second classification.
    • A county that had not adopted a building code before August 28, 2001, must obtain voter approval before adopting one under those sections.
    • Only voters in the area affected by the proposed code may vote; incorporated-territory citizens cannot vote on a code affecting a county.
    • The county commission must hold at least three public hearings and provide the statutory newspaper publication and county posting notices before adoption.
    • Regulations adopted under section 64.180 apply to unincorporated territory, except as otherwise provided.
    • Adopted or amended codes after August 28, 2001, must use a current, calendar year 1999 or later edition of a nationally recognized building code, as amended.
    • A county building ordinance may not conflict with liquefied petroleum gas installations governed by section 323.020.

    public hearings before adoption: >= 3 hearings minimum (Section 64.180(3)) · newspaper notice: >= 15 days (Notice of hearing time and place must be published in at least two newspapers having general circulation within the county) · posted notice: >= 15 days (Notice must be posted in four conspicuous places in the county) · minimum nationally recognized building-code edition: >= calendar year 1999 edition year (Applies after August 28, 2001, under section 64.180)

    “The regulations adopted shall be applicable to the unincorporated territory of the county, except as otherwise provided herein”
    2 more reviewed findings on this topic
    • Limited — County regulation of construction and issuance of building permits for buildings, including residential construction, in Missouri counties, with the practical focus on county-controlled areas outside incorporated territory.
      “the county commission in all counties of the first and second classification [...] is for this purpose empowered [...] to adopt [...] regulations to control the construction”
    • Limited — Missouri counties' authority to require permits and regulate residential construction in unincorporated areas.
      “Before the adoption of such code of regulations, the county commission shall hold at least three public hearings thereon”

Inside cities and towns in Bollinger County

Municipal rules found while researching the county. They apply inside that city or town, not to unincorporated land.

  • Local zoningPresent (with conditions)

    Zoning changes and ordinances within the City of Marble Hill, Missouri.

    • The official city website provides municipal ordinances and a zoning-change application.
    • The exact zoning title/chapter and operative dimensional standards could not be extracted because the linked municipal-code documents were DOCX files unavailable for webpage text extraction.
    “Application for Zoning Change Request (pdf)”
    One more reviewed finding on this topic

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Certificate of occupancy — Certificates of occupancy for buildings in unincorporated Bollinger County.
  • Short-term rentals — Short-term rentals in Bollinger County, including unincorporated areas.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Bollinger County, Missouri

Is Bollinger County a good place to live off-grid or homestead?

Bollinger County scores 80/100 on the Bolthole Index, a strong county profile. Its strengths: low administrative friction for a quiet rural property and manageable long-term carry cost.

How much does land cost in Bollinger County, Missouri?

Land in Bollinger County runs about $3,609 per acre, based on the latest county data.

What is the water situation in Bollinger County?

Bollinger County gets about 49" of rain a year, with severe drought in roughly 2.9% of years.

How remote is Bollinger County?

A representative private-land location has about 9,098 people within a 30-minute drive and 735,874 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Bollinger compares in Missouri