Winona County, Minnesota requires building permits for code-regulated work where the state permit rule applies; the building official varies by jurisdiction1. Unincorporated Winona County has zoning, with separate township administration in Wilson, Saratoga, St. Charles and Utica2,3. Winona County Planning & Environmental Services handles county septic applications; Construction Management Services handles septic permitting in Saratoga, St. Charles and Utica townships3.
Do you need a building permit in Winona County, Minnesota?
In Winona County, the Minnesota permit rule requires an application to the building official and the required building permit before code-regulated construction, alterations, demolition or changes of occupancy; local administration varies.
In Winona County, the Minnesota permit rule requires an application to the building official and the required building permit before code-regulated construction, alterations, demolition or changes of occupancy; local administration varies1. The Minnesota State Building Code is the statewide minimum construction standard, but local enforcement depends on adoption by ordinance12. One-story detached storage sheds, playhouses and similar accessory structures no larger than 200 square feet are among the building-permit exemptions; county development-certificate requirements are separate1,13. Inside Goodview and Lewiston, the cities issue building permits14,15. City building approval does not replace onsite-septic approval through Winona County Planning & Environmental Services16.
Who handles building permits and zoning applications in Winona County?
Winona County Planning & Environmental Services issues county zoning certificates and septic permits; a zoning certificate is separate from a building-code permit issued by the applicable building official.
Winona County Planning & Environmental Services issues county zoning certificates and septic permits; a zoning certificate is separate from a building-code permit issued by the applicable building official3,17. Contact the county planning office at 202 W Third Street, Winona, MN 55987, or 507-457-65203. Every Winona County permit application is submitted through the county's online permitting system, with fees paid online by e-check or credit card and email progress notices as the application moves4. Construction Management Services handles zoning and septic applications in Saratoga, St. Charles and Utica townships; call 507-282-8206 or email planning@tpamn.org3. Incorporated cities administer planning and zoning within city limits, and Wilson Township runs its own zoning process, so applications for those parcels do not go through the county system4.
Does Winona County have zoning?
Unincorporated Winona County has county zoning districts, while Wilson Township and incorporated municipalities administer their own zoning regulations.
Unincorporated Winona County has county zoning districts, while Wilson Township and incorporated municipalities administer their own zoning regulations2. Goodview and Lewiston have their own city zoning; onsite-septic regulation remains with Winona County Planning rather than moving with city zoning approval14,16,18. Saratoga, St. Charles and Utica townships use Construction Management Services for zoning and septic permitting3. The county map distinguishes agricultural, business, community-development, industrial and residential districts2. County variance requests go to the Board of Adjustment; conditional/interim use applications and zoning amendments go through Planning Commission review and a Board of Commissioners vote4. We could not confirm district-specific minimum dwelling sizes, lot sizes, setbacks, height limits or accessory-dwelling rules; ask the zoning administrator serving the parcel before finalizing a site plan4.
How do septic permits work in Winona County?
Winona County Planning regulates subsurface sewage treatment system design, permitting, installation and inspection under the county zoning ordinance and authority from the Minnesota Pollution Control Agency.
Winona County Planning regulates subsurface sewage treatment system design, permitting, installation and inspection under the county zoning ordinance and authority from the Minnesota Pollution Control Agency16. The county septic application lists a $350 fee plus site-evaluation, soil-log, design and management-plan materials5. The installation must also be inspected under the county ordinance5. Saratoga, St. Charles and Utica townships use Construction Management Services for septic permitting beginning in early 2026, although project-specific county or state permits may still apply3. Systems designed for more than 10,000 gallons per day require an MPCA permit19. Only about 8.5% of Winona County soils are rated without severe limitations for a conventional drain field, so make the soil evaluation an early feasibility check20.
Can you live in an RV or tiny home on land in Winona County?
We could not confirm a rule allowing long-term RV occupancy or temporary camping on private land in unincorporated Winona County; ask Winona County Planning & Environmental Services, or the township administrator serving the parcel, about occupancy, placement and sanitation before relying on an RV homesite.
We could not confirm a rule allowing long-term RV occupancy or temporary camping on private land in unincorporated Winona County; ask Winona County Planning & Environmental Services, or the township administrator serving the parcel, about occupancy, placement and sanitation before relying on an RV homesite3,4. A tiny house used as a dwelling must meet the Minnesota Residential Code, while local zoning determines whether the dwelling is allowed on the parcel21. We could not confirm Winona County's local tiny-home occupancy standards; building-code compliance alone does not establish zoning approval21.
Building a home in Winona County: the steps, in order
Identify the parcel's township and zoning administrator because the county, specified townships and incorporated cities use different processes.
- Identify the parcel's township and zoning administrator because the county, specified townships and incorporated cities use different processes3.
- Apply to the building official and obtain the required building permit before code-regulated work begins1.
- Submit county permit applications through the online permitting system, which collects fees by e-check or credit card; parcels in a city, Wilson Township or the three Construction Management Services townships follow that jurisdiction's process instead3,4.
- Budget for the county fees that fit the project; the 2026 schedule lists $200 for a development-certificate application, $500 for a new dwelling or commercial structure, and $200 for an accessory structure22.
What should you check before buying land in Winona County?
Check the parcel's jurisdiction first because zoning and septic administration changes among the county, certain townships and incorporated cities.
Check the parcel's jurisdiction first because zoning and septic administration changes among the county, certain townships and incorporated cities4. Then verify the mapped zoning district, road authority, floodplain status, septic feasibility and well-permit authority with the offices that will review the project8,10,11,16,23. A proposed land division needs an early county conversation because the County Surveyor checks subdivision plats and new land splits require a filed survey24. About 63.9% of county land has a slope of 15% or less, while about 41.4% is wooded, so parcel-level topography and clearing needs can differ sharply from county averages20.
Watch-outs
- Do not start code-regulated work with only a zoning certificate; the required building permit must come from the applicable building official1,17.
- Winona County's online system takes county permit applications only; cities, Wilson Township and the Construction Management Services townships run separate processes3,4.
- Most Winona County soils have severe limitations for a conventional drain field, so secure a site evaluation before committing to a house location20.
Sources
24 official pages, each quoted and re-checked · written October 13, 2026
- 1300.0120 - Permits
- Planning & Zoning
- Online Permitting
- Online Permitting
- Septic Systems
- 2025 Minnesota Statutes, Section 326B.805
- Residential contractor licensing
- Winona County Highway Department (winonacounty.gov)
- Floodplain Regulations (Minnesota statewide rule)
- Board of Adjustment
- 4725.1810 - Permits and Notifications, General
- Overview of the Minnesota State Building Code
- Winona County Planning & Zoning (2026 county census)
- Goodview: Building Permits - Goodview, Minnesota (Winona County)
- Lewiston: City of Lewiston City Code (Winona County)
- Septic Systems
- Minnesota State Building Code Adoption Guide (Minnesota statewide rule)
- Lewiston: City of Lewiston City Code (Winona County)
- SSTS design (Minnesota statewide rule)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Tiny Houses and the 2020 Minnesota Residential Code (Minnesota statewide rule)
- 2026 Winona County Fee Schedule
- Planning & Zoning
- County Surveyor
Written October 13, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Winona County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.