Inside New Brighton, Minnesota, a building permit is required whenever you build, enlarge, alter, repair, convert, demolish or move a building1. The city's own Zoning Code governs land use and is applied during permit review2. Ramsey County does not zone land here3. We could not confirm who issues septic permits inside city limits, so ask Ramsey County Environmental Health4.
At a glance
- Building permit
- Required for building, enlarging, altering, repairing, converting, demolishing or moving a building1
- Who issues building permits
- City of New Brighton Building Department5
- Zoning
- City Zoning Code, applied through land-use approval or building-permit review2
- Typical RS-1 lot
- 10,000 square feet minimum; 50% impervious and 30% building coverage maximum67
- Certificate of occupancy
- Required before a new or moved building is occupied8
- Septic
- Not confirmed inside city limits; ask Ramsey County Environmental Health4
- Owner-builder
- State exemption exists for owners who occupy the home; city rule not confirmed9
- RV or tiny-home living
- Not confirmed in the Zoning Code; ask the city5
Who to call
Building permits
City of New Brighton Building Department
Building permits and inspections inside New Brighton city limits; the department does not accept paper permit applications.
803 Old Highway 8 NW New Brighton, MN 55112
Zoning
City of New Brighton Planning & Zoning
Zoning Code, land-use approvals, lot revisions and subdivisions inside New Brighton city limits.
803 Old Highway 8 NW New Brighton, MN 55112
Septic permits
Ramsey County Public Health — Environmental Health
Environmental Health inquiries, including questions about local septic administration.
Contact details are copied from each office’s official page and were checked against it on October 24, 2026.
Off-grid gear
Going off-grid in New Brighton means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in New Brighton, MN?
Yes. New Brighton requires a building permit whenever you build, enlarge, alter, repair, convert, demolish or move a building1. Minnesota's State Building Code also requires a permit from the local building official for this kind of work10.
Permits that involve plan review generally take 7 to 10 working days to issue, and a permit is not issued until it is paid and reviewed11. Current fees are in the city's published fee schedule12. Work on a new or moved building ends with a final inspection and a certificate of occupancy13.
Who issues building permits in New Brighton, and how do you reach them?
The City of New Brighton Building Department issues building permits and runs inspections inside city limits5. The department does not accept paper permit applications, so apply online11. For questions, email the department or call 651-638-2050 on weekdays5.
This is the city's office, not a Ramsey County one. Ramsey County does not administer zoning here3, so a New Brighton address should not start at a county planning counter.
Does New Brighton have zoning, and what does it mean for lot size and setbacks?
Yes. The City of New Brighton has its own Zoning Code and Comprehensive Plan214. Land is classified into a base zoning district, and some land also sits in an overlay district whose rules apply in addition to the base district15.
District matters. In the RS-1 Single-Family Low Density Residential District, the minimum lot area for any permitted use is 10,000 square feet6, and the maximum is 50% impervious surface and 30% building coverage7. Lot revisions and subdivisions also go to the city's Planning Commission16.
We could not confirm a minimum dwelling size, an RV occupancy rule, a temporary camping rule or a complete tiny-home rule in the Zoning Code, so ask the city before you plan on any of those.
How do septic permits work in New Brighton?
We could not confirm who issues septic permits inside New Brighton city limits. Minnesota requires permits for new and replacement septic systems17, and Ramsey County Environmental Health is the office to ask about local septic administration4.
In a densely built county, most addresses connect to a public sewer. We could not confirm a rule on when a new home must connect, so ask the Building Department about sewer and water service before you buy. Well permits inside the city were also not confirmed.
Can you live in an RV or tiny home in New Brighton?
We could not confirm an RV or temporary camping rule in New Brighton's Zoning Code, and only a partial tiny-home reference turned up. Ask the Planning & Zoning office before you park or occupy either one14.
Minnesota allows tiny houses as dwellings only subject to the State Building Code and local zoning18. A building permit and certificate of occupancy would apply to any structure you build or move onto a lot8.
Building a home in New Brighton: the steps, in order
- Confirm the zoning district and lot standards with Planning & Zoning14.
- If you are dividing or revising a lot, plan for Planning Commission review16.
- Apply for the building permit online with the Building Department11.
- Ask Ramsey County Environmental Health whether any septic work applies to your address4.
- Pass the final inspection and obtain a certificate of occupancy before anyone moves in. A temporary certificate may be issued for up to 6 months if no substantial hazard results8.
What stays with Ramsey County, and what to check before you buy
Septic questions go to Ramsey County Environmental Health4. For land outside city limits, see the Ramsey County page. Ramsey County's effective property tax rate is 1.2%19.
If the lot sits in the Floodplain Overlay District, a conditional use permit decided by the City Council applies20. Short-term rentals of 14 consecutive days or less need a city permit first21.
Watch-outs
- Septic authority inside New Brighton city limits was not confirmed; call Ramsey County Environmental Health before assuming a lot is on public sewer4.
- The city's owner-builder rule was not confirmed; Minnesota's owner exemption does not apply to homes built for resale9.
- Driveway and curb-cut approval rules were not confirmed, so ask the Building Department before changing access5.
Sources
- Building Department Common Questions & Topics | New Brighton, MN (New Brighton), quoted and re-checked
- Planning & Zoning | New Brighton, MN (New Brighton), quoted and re-checked
- Draft Ramsey County HRA Fiscal Year 2026 Annual Action Plan (2026 county census)
- Ramsey County Public Health — Environmental Health (ramseycountymn.gov)
- City of New Brighton Building Department (newbrightonmn.gov)
- City of New Brighton Zoning Ordinance (New Brighton), quoted and re-checked
- City of New Brighton Zoning Ordinance (New Brighton), quoted and re-checked
- City of New Brighton Zoning Ordinance (New Brighton), quoted and re-checked
- revisor.mn.gov, quoted and re-checked
- 1300.0120 - MN Rules Part, quoted and re-checked
- Building Department Common Questions & Topics | New Brighton, MN (New Brighton), quoted and re-checked
- Building Department Common Questions & Topics | New Brighton, MN (New Brighton), quoted and re-checked
- City of New Brighton Zoning Ordinance (New Brighton), quoted and re-checked
- City of New Brighton Planning & Zoning (newbrightonmn.gov)
- City of New Brighton Zoning Ordinance (New Brighton), quoted and re-checked
- Planning & Zoning | New Brighton, MN (New Brighton), quoted and re-checked
- revisor.mn.gov, quoted and re-checked
- Tiny Houses and the 2020 Minnesota Residential Code, quoted and re-checked
- Effective property tax rate: Bolthole Index county data
- City of New Brighton Zoning Ordinance (New Brighton), quoted and re-checked
- City of New Brighton Zoning Ordinance (New Brighton), quoted and re-checked
Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.