Bolthole Index

Clay County, Minnesota

Building permits, zoning and septic rules in Dilworth, Minnesota

Dilworth, Minnesota requires a city building permit before a building project begins and administers the Minnesota State Building Code inside city limits.12 Dilworth sets its own zoning; Clay County Environmental Health handles septic-system permits and inspections for rural and urban systems in Clay County.34 RV dwelling occupancy remains unconfirmed: ask Dilworth City Hall before planning to live in an RV on a lot.3

At a glance

Building permits
Apply through Dilworth City Hall before starting a building project1
Zoning
City zoning applies inside Dilworth city limits3
Septic systems
Clay County Environmental Health; new systems need a design, septic permit and inspection before backfilling45
RV living
Dwelling occupancy unconfirmed; ask Dilworth City Hall3
Tiny homes and ADUs
Local permission unconfirmed; city zoning and state dwelling standards both matter36
Owner-builder
Qualifying owners have a contractor-licensing exemption, without a waiver of building permits or inspections7
Residential lot coverage
R-1 and R-2 structures are limited to 33% lot coverage89

Who to call

Building permits

Dilworth Building Official / City Hall

City building-permit applications, plan review and construction inspections

218-849-3618

[email protected]

2 - 1st Avenue SE Dilworth, MN 56529

Zoning

Dilworth City Hall — zoning inquiries

Starting contact for city zoning questions and current ordinances

218-287-2313

[email protected]

2 - 1st Avenue SE Dilworth, MN 56529

Septic permits

Clay County Environmental Health

Septic-system design review, permits, inspections and certifications

715 11th Street N. Suite 303 Moorhead, MN 56560

Contact details are copied from each office’s official page and were checked against it on October 12, 2026.

Off-grid gear

Going off-grid in Dilworth means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Dilworth, MN?

Dilworth requires a city building permit before starting a building project, and the city has adopted the Minnesota State Building Code.12 Dilworth building-permit applications require a signed zoning certificate, with duplicate plans when the Building Official requests them.10 Plans must identify lot dimensions, existing buildings, proposed work, uses, parking and occupancy information needed to establish zoning compliance.10 A homeowner-occupant may obtain a building permit without hiring a contractor, but remains responsible for complying with applicable laws and ordinances.1

Who issues building permits in Dilworth, and what do they cost?

Start a Dilworth building-permit application at City Hall; contact the Building Official at 218-849-3618 to discuss the proposed project.1 The Dilworth Building Official reviews construction plans and inspects construction for compliance with the building code.11 Building-permit fees depend on project valuation, so ask for a project-specific estimate.1 Dilworth’s published fee schedule lists $225 for a conditional-use permit, $225 for rezoning and $225 for a variance; those are zoning application fees rather than a flat house-building permit price.12 Ask City Hall to confirm the current schedule before applying.13

Does Dilworth have zoning, lot-size limits and setbacks?

Dilworth’s zoning ordinance governs land and structures inside the incorporated limits.3 In Dilworth’s R-2 district, the single-family lot standard is 4,800 square feet, with 50 feet of width and 100 feet of depth; the two-family lot-area standard is 6,000 square feet, subject to the chapter’s additional requirements and exceptions.14 Structures together may cover no more than 33% of a lot in R-1 or R-2.89 Before selecting a house footprint, ask City Hall to identify the parcel’s district and applicable setbacks.3 The city warns that its online code may not reflect all recently passed legislation.13

How do septic permits work inside Dilworth?

Clay County Environmental Health inspects rural and urban septic systems and issues septic permits and certifications; Dilworth’s city building approval does not replace that septic approval.42 All new septic systems in Clay County require a design, a septic permit and an inspection before backfilling.5 For an existing septic system, the seller must arrange an inspection and county certification before ownership transfers.15 Contact Environmental Health at 715 11th Street N., Suite 303, Moorhead, MN 56560 about the septic application.16 We could not confirm a general Dilworth sewer-connection rule; ask City Hall about sewer service before proposing a private system.3

Can you live in an RV or tiny home in Dilworth?

We could not confirm permission to occupy an RV as a dwelling, camp temporarily on a private lot, or occupy a tiny home in Dilworth; take the proposed use to City Hall before buying for that purpose.3 Minnesota’s tiny-house construction standards do not establish local zoning permission: local zoning determines whether a tiny home or accessory dwelling unit is allowed on a property.6 An accessory dwelling unit must also comply with state residential building-code requirements for dwellings.6 Ask Dilworth City Hall specifically about dwelling use, accessory dwellings, minimum dwelling floor area and utility connections for the parcel.3

Building a home in Dilworth: what are the steps, in order?

  1. Ask City Hall to confirm the parcel’s Dilworth zoning district and whether the proposed dwelling use fits the city ordinance.3
  2. Prepare the building-permit application, zoning certificate and required plans showing the lot, buildings, proposed work, parking and occupancy.10
  3. Obtain city building approval before starting, and obtain county septic approval if installing a new septic system.15
  4. Schedule required construction inspections and the final inspection with the Dilworth Building Official.1
  5. Arrange the certificate of occupancy before using a new home, under Minnesota’s rule for jurisdictions enforcing the State Building Code.172

What should you check before buying land in Dilworth?

Ask Dilworth City Hall about floodplain status before committing to a building site: Minnesota requires floodplain approval for regulated construction and fill, with cities generally administering the ordinance inside their boundaries.18 Minnesota prohibits a dwelling or other enclosed structure in a mapped floodway.19 Changes to city driveway approaches require a city building-permit inquiry and inspection; direct state-highway driveway connections have separate MnDOT access-permit requirements.120 For land outside Dilworth city limits, use the Clay County guide for the county’s building and zoning requirements.2122

Watch-outs

  • Dilworth’s reviewed code says building permits expire if work does not begin within 6 months, stops for 6 months, or is not completed within 24 months unless extended; confirm the deadline with the Building Official.10
  • Dilworth’s online code may omit recently passed legislation; confirm the parcel’s current zoning and applicable amendments with City Hall.13
  • Minnesota’s owner-builder contractor-licensing exemption does not waive building permits, inspections or certificates of occupancy.7

Sources

  1. Dilworth Building Official / City Hall (cityofdilworth.com)
  2. Dilworth Code § 150.01, Adoption of Building Code (Dilworth), quoted and re-checked
  3. Dilworth Code § 153.001, Purpose and Intent (Dilworth), quoted and re-checked
  4. On-site Septic Systems, quoted and re-checked
  5. On-site Septic Systems, quoted and re-checked
  6. Storage Sheds and the Minnesota State Building Code (Minnesota statewide rule), quoted and re-checked
  7. revisor.mn.gov (Minnesota statewide rule), quoted and re-checked
  8. Dilworth Code § 153.041, R-1 District (Dilworth), quoted and re-checked
  9. Dilworth Code § 153.042, R-2 District (Dilworth), quoted and re-checked
  10. Dilworth Code § 153.020, Administrative; Enforcement and Fees (Dilworth), quoted and re-checked
  11. Dilworth Code § 153.020, Administrative; Enforcement and Fees (Dilworth), quoted and re-checked
  12. Dilworth Code § 34.01, Fee Schedule (Dilworth), quoted and re-checked
  13. Dilworth City Hall — zoning inquiries (cityofdilworth.com)
  14. Dilworth Code § 153.042, R-2 District (Dilworth), quoted and re-checked
  15. On-site Septic Systems, quoted and re-checked
  16. Clay County Environmental Health (claycountymn.gov)
  17. Minnesota Administrative Rules, Part 1300.0220 — Certificate of Occupancy (Minnesota statewide rule), quoted and re-checked
  18. Floodplain Regulations (Minnesota statewide rule), quoted and re-checked
  19. Floodplain Regulations (Minnesota statewide rule), quoted and re-checked
  20. MnDOT Access Management Manual, Chapter 4 (Minnesota statewide rule), quoted and re-checked
  21. Building & Land Alteration Permit, quoted and re-checked
  22. Clay County Zoning, quoted and re-checked

Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Dilworth

Dilworth’s own rules

  • Building code adoptedAdopted

    Construction, alteration, moving, demolition, repair, and use of buildings and structures within Dilworth city limits.

    • The Minnesota State Building Code is adopted by reference and administered by the city within the incorporated limits.
    “The Minnesota State Building Code as such code may be from time to time amended, supplemented or replaced in the future, pursuant to M.S. §§ 326B.101 et seq., as they may be amended from time to time, and any Minnesota Rules thereunder is hereby adopted and incorporated by reference in this subchapter as if set forth in full as the Building Code for the city.”
  • InspectionsRequired

    Construction within Dilworth city limits subject to the zoning and building codes.

    • The Building Official reviews construction plans and inspects construction for compliance with the Building Code.
    “The Building Official reviews construction plans and inspects construction for compliance with the Building Code.”
  • Local zoningPresent

    All land and structures within Dilworth's incorporated limits.

    • The zoning ordinance states that it became effective December 13, 2010.
    “The official title of this chapter is the Zoning Ordinance of the City of Dilworth, Minnesota.”
  • Minimum lot sizeSpecified

    Single-family and two-family lots in the R-2 district inside Dilworth city limits.

    • The R-2 standards are subject to additional requirements, exceptions, and modifications in the zoning chapter.

    single-family lot area: 4800 sq ft · two-family lot area: 6000 sq ft · single-family lot width: 50 ft · lot depth: 100 ft

    “Single-family 4,800 sq. ft. 50 ft. 100 ft. Two-family 6,000 sq. ft. 60 ft. 100 ft.”
  • Lot coverageSpecified

    All structures in the R-1 district inside Dilworth city limits.

    • The limit applies to the total lot area.

    maximum lot coverage: <= 33 percent

    “No structure or combination of structures in the R-1 District shall occupy more than 33% of the total lot area.”
    One more reviewed finding on this topic
    • Specified — All structures in the R-2 district inside Dilworth city limits.
      “No structure or combination of structures shall occupy more than 33% of the lot area.”
  • Permit feesPublished

    Published municipal planning, zoning, utility-connection, and related permit fees for Dilworth.

    • Fees can differ by permit type and may be amended by later ordinances.

    conditional use permit: 225 USD · major subdivision preliminary: 325 USD · major subdivision final: 150 USD · rezoning: 225 USD · variance: 225 USD · residential sewer connection fee: 25 USD · residential water connection fee: 25 USD

    “The following permit fees and service charges are hereby established for the year 2026. The fees listed supersede those previously adopted.”
  • Permit processPublished (with conditions)

    Building-permit applications inside Dilworth city limits.

    • Applications are available at City Hall.
    • Plans in duplicate may be required by the Building Official.
    • A signed zoning certificate is required.
    • Plans must show lot dimensions, existing buildings, proposed construction or alteration, uses, parking, occupancy information, and other information needed to determine zoning compliance.
    • Permits expire if work has not begun within six months, ceases for six months, or is not completed within 24 months, unless extended under the adopted Building Code.

    permit commencement deadline: 6 calendar months (unless extended pursuant to the adopted Building Code) · permit completion deadline: 24 months (unless extended pursuant to the adopted Building Code)

    “If the work described in any building permit has not begun within six calendar months from the date of issuance, or such work described ceases for a period of six calendar months, or is not completed within 24 months, said permit shall expire, unless otherwise extended pursuant to the adopted Building Code.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Dilworth or Clay County directly.

  • Owner-builder exemption — Owner-builder exemptions from building-permit or inspection requirements inside Dilworth city limits.
  • Certificate of occupancy — Certificate-of-occupancy requirements for buildings inside Dilworth city limits.
  • Minimum dwelling size — Dwellings inside Dilworth city limits; district-specific minimum floor-area requirements.
  • Living in an RV — Occupancy of recreational vehicles as dwellings inside Dilworth city limits.
  • Camping on your land — Temporary camping on private land inside Dilworth city limits.
13 more unanswered
  • Tiny homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Dilworth publishes no rule on the point, not that none exists. Clay County’s page lists the county offices to call.

← All of Clay County: county rules, score and offices