Garden City, Michigan requires a building permit before you erect, alter or demolish a building, and the city's own building department issues it12. The city also writes and enforces its own zoning under Chapter 154 of its code3. Septic permits are a separate matter: Wayne County Environmental Health is the permitting agency for onsite sewage systems in the county4.
At a glance
- Building permit
- Required; issued by the city building department12
- Zoning
- City zoning under Code Chapter 154, including R-1, R-2 and R-3 residential districts35
- Building code
- Michigan building and residential codes, enforced by the city6
- Minimum home size (R-1)
- 1,250 sq ft without a basement; 1,100 sq ft with a basement7
- Minimum lot (R-1)
- 7,200 sq ft and 60 feet wide8
- Manufactured homes
- Only inside a licensed manufactured home park9
- Septic permits
- Wayne County Environmental Health is the county permitting agency; sewer availability is confirmed with the city410
- Owner-builder
- State licensing exemption for your own home; a building permit is still required11
Who to call
Building permits
Garden City Building Department
Building, electrical, mechanical and plumbing permits, inspections and certificates of occupancy inside Garden City
6000 Middlebelt Road, Garden City, MI 48135
Zoning
Garden City Planning and Zoning
Zoning administration, zoning map, rezoning and zoning board of appeals applications
6000 Middlebelt Road, Garden City, MI 48135
Septic permits
Wayne County Health, Human and Veterans Services - Environmental Health Section
Onsite sewage (septic) and well permits for Wayne County
33030 Van Born Road, Wayne, MI 48184
Contact details are copied from each office’s official page and were checked against it on October 23, 2026.
Off-grid gear
Going off-grid in Garden City means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Garden City, Michigan have zoning, and what does it mean for lots, homes and outbuildings?
Yes. Garden City applies its own zoning chapter to all land and structures inside city limits, and no structure may be built, altered or moved except in conformity with it3. The city's districts include R-1 one-family, R-2 two-family and R-3 multiple-family residential, several business districts and a manufacturing district; the zoning administrator keeps the official zoning map5. We found no agricultural or rural-residential district in the city's list8.
In the R-1 one-family district, the minimum lot is 7,200 square feet and 60 feet wide8. A single-family home needs at least 1,250 square feet without a basement or 1,100 square feet with one7. Buildings may cover no more than 30% of an R-1 lot12, and the principal building tops out at 2½ stories or 35 feet13.
Detached garages and sheds in single-family districts must sit at least 3 feet from the side lot line and at least 10 feet from the house, and may not stand in the front yard14. Manufactured homes are allowed only inside a licensed manufactured home park9. A garage or shed in a residential district cannot serve as a dwelling unless it qualifies as a permitted accessory dwelling15.
Do you need a building permit in Garden City, and who issues it?
Yes. A permit is required before erecting, altering, repairing, demolishing or removing a building or structure, and before installing plumbing, electrical or drainage systems1. The Garden City Building Department issues building, electrical, mechanical and plumbing permits for residential and commercial sites inside the city2. Michigan's construction code governs the work, and the city adopted the state building code and residential code by reference6.
Applications go to the building official on the city's forms, with a site plan where applicable16. A permit is issued only if the plans conform to the zoning chapter, the state construction code and city codes1. Fees are set by city council resolution and posted in the building department; we could not confirm dollar amounts, so ask the department17.
Owning the lot does not exempt you from the permit. Michigan's owner-builder exception covers residential-builder licensing for your own home, not the building permit, and the state notes that municipalities may add requirements11.
How do you reach the Garden City building and zoning offices?
The Garden City Building Department is at 6000 Middlebelt Road, Garden City, MI 48135, phone 734-793-16502. The same department issues certificates of occupancy for new construction and for the sale or rental of residential and commercial properties2. Zoning questions, the zoning map and rezoning and zoning board of appeals applications run through the city's Planning and Zoning page18. Inspections are scheduled by leaving a voicemail on the inspection line with the address, inspection type and permit number2.
How do septic permits work for a home in Garden City?
Building permits come from the city, but septic permits do not. Wayne County Environmental Health acts as the local permitting agency for all residential and small commercial onsite sewage systems in the county419. Where public sewer is available, you contact the local municipality, and Wayne County building inspection agencies require proof of a municipal sewer connection or a sewage permit before issuing building permits10.
We could not confirm from the city's published code whether a particular Garden City address must connect to public sewer or water. Ask the Building Department before you buy. If a parcel has an onsite system, the county requires a site and soil evaluation before it issues a permit20, and a Wayne County ordinance requires a septic inspection for function before a home sale outside Detroit21.
Can you live in an RV or tiny home in Garden City?
We could not confirm a Garden City rule on living in an RV or a tiny home on a residential lot, so ask the Building Department and the zoning administrator before you buy18. What the code does say: manufactured homes are allowed only in a licensed manufactured home park9, and the single-family minimum floor area in R-1 is 1,250 square feet without a basement7, which a typical tiny home would not meet. Michigan's temporary-campground license rules for events of five or more recreational units do not answer the question of living in an RV on your own lot22.
Building a home in Garden City: the steps, in order
- Confirm the zoning district and lot standards with the zoning administrator518.
- Ask the city whether public sewer serves the parcel; if not, apply to Wayne County Environmental Health for a septic permit1019.
- File the building permit application with the building official, with a site plan16.
- Build to the Michigan code under the city's inspections6.
- Request a final inspection and a certificate of occupancy before anyone moves in; the city inspects within 15 working days after you notify completion2324.
What stays with Wayne County, and what to check before you buy in Garden City
Septic and well permits sit with Wayne County Environmental Health, not the city425. Work in a county road right-of-way or on a county drain easement, including a driveway approach there, needs a county permit26. For land outside Garden City, see the Wayne County page. Wayne County's median property tax bill is $2,794 a year, at an effective rate of 1.6%2728.
Watch-outs
- Chapter 154 lists many districts, but we read only the R-1 dimensions, so check the lot standards for any other district with the zoning administrator5.
- The city's code refers to the property maintenance code in inconsistent ways, so confirm the current edition with the Building Department6.
- We could not confirm the owner-builder permit process, floodplain rules or driveway standards inside Garden City; ask the Building Department2.
Sources
- Garden City Code §§ 154.465 Permits and 154.466 Certificate of occupancy (Garden City), quoted and re-checked
- Garden City Building Department (gardencitymi.org)
- Garden City Code Chapter 154 Zoning, General zoning regulations (incl. 154.020 to 154.023) (Garden City), quoted and re-checked
- Septic/Onsite Sewage - Wayne County, Michigan, quoted and re-checked
- Garden City Code Chapter 154 Zoning, General zoning regulations (incl. 154.020 to 154.023) (Garden City), quoted and re-checked
- Garden City Code § 151.01 Adoption of building code by reference (Garden City), quoted and re-checked
- Garden City Code Appendix A: Schedule of Regulations (Garden City), quoted and re-checked
- Garden City Code Appendix A: Schedule of Regulations (Garden City), quoted and re-checked
- Garden City Code §§ 154.024 Residential design standards and 154.025 Temporary structures and uses (Garden City), quoted and re-checked
- Septic/Onsite Sewage, quoted and re-checked
- Builders FAQ, quoted and re-checked
- Garden City Code Appendix A: Schedule of Regulations (Garden City), quoted and re-checked
- Garden City Code Appendix A: Schedule of Regulations (Garden City), quoted and re-checked
- Garden City Code Chapter 154 Zoning, General zoning regulations (incl. 154.020 to 154.023) (Garden City), quoted and re-checked
- Garden City Code Chapter 154 Zoning, General zoning regulations (incl. 154.020 to 154.023) (Garden City), quoted and re-checked
- Garden City Code §§ 154.465 Permits and 154.466 Certificate of occupancy (Garden City), quoted and re-checked
- Garden City Code § 151.01 Adoption of building code by reference (Garden City), quoted and re-checked
- Garden City Planning and Zoning (gardencitymi.org)
- Wayne County Health, Human and Veterans Services - Environmental Health Section (waynecountymi.gov)
- Septic/Onsite Sewage, quoted and re-checked
- Septic/Onsite Sewage - Wayne County, Michigan, quoted and re-checked
- Steps for Obtaining a Temporary Campground License, quoted and re-checked
- Garden City Code §§ 154.465 Permits and 154.466 Certificate of occupancy (Garden City), quoted and re-checked
- Garden City Code §§ 154.465 Permits and 154.466 Certificate of occupancy (Garden City), quoted and re-checked
- Water/Well Permits, quoted and re-checked
- Construction Permits, quoted and re-checked
- Median property tax bill: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
Written October 23, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.