Shiawassee County, Michigan requires a building permit for a new home, issued by the enforcing agency assigned to the parcel's community1. Zoning approval comes from the county in townships such as Antrim, Rush and Woodhull, but Owosso, Corunna, Durand, Perry and other communities zone for themselves2,3. Septic permits come from the Shiawassee County Health Department either way4.
Do you need a building permit in Shiawassee County, Michigan?
A new home in Shiawassee County, Michigan requires a building permit from the agency assigned to that community.
A new home in Shiawassee County, Michigan requires a building permit from the agency assigned to that community1. The county handles new-home permitting in its listed jurisdictions, while some communities use a local enforcing agency3. Ordinary repairs are exempt only within the Michigan Building Code's limits; structural, egress and covered trade work do not qualify as ordinary repairs1. Michigan has adopted the 2021 Michigan Building Code, effective in April 2025, while one- and two-family dwelling provisions are in the Michigan Residential Code1. Where the county administers inspections, required stages include foundation or footing, rough frame, insulation and final inspection, and work must remain uncovered until approved5. A new or altered building cannot be occupied until the code official issues a Certificate of Occupancy6.
Who is the Shiawassee County building department, and how do you reach them?
The Shiawassee County Department of Community Development runs Building & Trades from 201 N Shiawasse St, 3rd Floor, Corunna, Michigan; call 989.743.2396 or email comdev@shiawassee.net.
The Shiawassee County Department of Community Development runs Building & Trades from 201 N Shiawasse St, 3rd Floor, Corunna, Michigan; call 989.743.2396 or email comdev@shiawassee.net9. Community Development performs building and zoning work for most, but not all, communities, so ask whether the parcel uses county or local administration10. Shiawassee County publishes processes for building permits, site-plan and zoning review, land divisions and environmental-health permits, and applicants should contact the relevant office before submitting8. Michigan's owner-builder exception can excuse a qualifying owner who builds on their own property for their own use and occupancy from residential-builder licensing, but permits, inspections, codes, zoning and septic approvals still apply7. County building and trade fees are published in a current schedule11. Even where a city or township handles its own building permits or zoning approval, septic and private-well permits still go through the Shiawassee County Health Department Environmental Health Division4,5.
Does Shiawassee County have zoning?
Shiawassee County has a zoning ordinance with agricultural, residential, business and industrial districts, but it applies within the county zoning jurisdiction rather than replacing every local ordinance.
Shiawassee County has a zoning ordinance with agricultural, residential, business and industrial districts, but it applies within the county zoning jurisdiction rather than replacing every local ordinance2. The county handles zoning for Antrim, Bennington, Burns, Fairfield, Middlebury, New Haven, Rush, Sciota, Shiawassee and Woodhull townships, while Caledonia, Hazelton, Owosso, Perry, Venice, Vernon, Corunna, Durand, Laingsburg, Bancroft, Byron, Lennon, Morrice and New Lothrop use local zoning3. Where county zoning applies, the ordinance's map and district schedules control lot size, setbacks, lot coverage and building height, with standards varying by district and use12. Planning & Zoning reviews development proposals and enforces county land-use rules13. Outside the zoning ordinance's mobile-home parks, a manufactured home used as a dwelling must be at least 20 feet wide across any elevation, meet HUD standards and connect to a water supply and sewer system the County Health Department approves12. Ask Planning & Zoning to identify the governing jurisdiction and district before designing a home3.
How do septic permits work in Shiawassee County?
Shiawassee County requires a Health Department permit before constructing, replacing, substantially repairing or extending a septic system.
Shiawassee County requires a Health Department permit before constructing, replacing, substantially repairing or extending a septic system4. An application can require a disposal-system plan, soil testing, high-water evaluation and engineered materials; the Health Officer may reject a site with inadequate isolation, flood exposure, unsuitable permeability or a seasonal high water table less than 2 feet below grade4. The Environmental Health Division works from 201 N. Shiawassee St. - 3rd Floor, Corunna, and can be reached at 989.743.239014. None of Shiawassee County's mapped soils avoid a severe limitation rating for a conventional drain field, so arrange the site evaluation before closing15. The county's new-home process also requires a private-well permit, and a newly drilled well must be inspected5.
Can you live in an RV or tiny home on your land in Shiawassee County?
In the Shiawassee County zoning jurisdiction, an RV or similar structure that does not meet dwelling standards may be occupied for no more than 2 weeks in a month unless it is in a bona fide campground.
In the Shiawassee County zoning jurisdiction, an RV or similar structure that does not meet dwelling standards may be occupied for no more than 2 weeks in a month unless it is in a bona fide campground12. Temporary housing requires a zoning permit and is limited to living on-site while a new dwelling is built or while a damaged dwelling is rebuilt; the normal permit period is no more than 1 year, with a possible additional 1-year extension12. Communities with local zoning may have different rules, so confirm the parcel's authority before moving an RV onto it3. We could not confirm a complete tiny-home rule; Michigan treats a tiny house proposed in a resort setting as a building rather than a recreational unit, even on wheels, and requires local zoning and construction approvals16.
Building a home in Shiawassee County: the steps, in order
Call Community Development at 989.743.2396 to identify the parcel's zoning authority and construction-code enforcing agency.
- Call Community Development at 989.743.2396 to identify the parcel's zoning authority and construction-code enforcing agency3,9.
- Check the controlling zoning map and district schedule before fixing the home design or site plan12.
- Obtain septic and private-well permits from Environmental Health for the new home5,14.
- Secure the approved Road Commission driveway permit required by the county checklist, keeping the driveway at least 15 feet from side lot lines; state-highway access also requires an MDOT permit5,17.
- Submit the zoning application, address request, plot plan, soil-erosion review, building application, plans, specifications, truss drawings and energy-code form required for the project5.
- Call for each county-administered building, electrical, plumbing and mechanical inspection, and do not continue over work until its approval sticker is posted5.
- Finish all final inspections and obtain the Certificate of Occupancy before moving in5,6.
What to check before you buy land in Shiawassee County
Confirm which government zones and inspects the parcel before relying on a county map or application packet.
Confirm which government zones and inspects the parcel before relying on a county map or application packet3. Test septic feasibility early because none of Shiawassee County's mapped soils avoid a severe limitation rating for a conventional drain field15. Verify that a well can be permitted and that the driveway location can receive Road Commission approval5. Check mapped flood hazards before designing because Michigan regulates covered work in qualifying river, stream and drain floodplains and prohibits new residential construction in the floodway18. A land division requires an application, official survey, five years of tax-payment certification, Road Commission access approval, supporting materials and payment before final recording through the Register of Deeds8. Typical home values are about $214,722, while the median property-tax bill is about $2,214 a year at an effective rate near 1.3%15.
Watch-outs
- Michigan's owner-builder exception concerns contractor licensing only; qualifying owners still must meet applicable permit, inspection, code, zoning and septic requirements7.
- County and local governments split zoning and inspection authority, so confirm the parcel's assigned agencies before filing or relying on the county ordinance3.
- County-zoned parcels allow an RV as temporary housing only under narrow construction or rebuilding conditions; locally zoned communities may differ3,12.
Sources
18 official pages, each quoted and re-checked · written October 9, 2026
- Building Permit Information
- Shiawassee County Zoning Ordinance
- 2026 County Jurisdiction List
- Sewage Disposal System Permit Application
- New Home Checklist and Inspection Information
- Certificate of Occupancy Request (Michigan statewide rule)
- michigan.gov
- Land Division Process
- Shiawassee County Department of Community Development - Building & Trades (shiawassee.net)
- Shiawassee County Jurisdiction List
- Building & Trades – Shiawassee County
- Shiawassee County Zoning Ordinance
- Shiawassee County Department of Community Development - Planning & Zoning (shiawassee.net)
- Shiawassee County Health Department - Environmental Health Division (shiawasseechd.net)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- michigan.gov (Michigan statewide rule)
- Infrastructure permits (Michigan statewide rule)
- Floodplains (Michigan statewide rule)
Written October 9, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Shiawassee County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.