Rose Township, Michigan requires a building permit for home construction, with applications handled by the township’s Building, Zoning & Code Enforcement Department.12 Rose Township sets local zoning; Oakland County Health Division handles septic permits inside the township.34 Lot size and home size depend on the zoning district, so a small rural parcel is not automatically a buildable homesite.567
At a glance
- Building permit
- Required for home construction; contact the township department12
- Zoning
- Rose Township has its own zoning ordinance3
- Septic permits
- Oakland County Health Division48
- Minimum lot size
- AG/RP: 10 acres; R-1A without water or sewer: 1.5 acres56
- Minimum home size
- R-1A: 1,300 square feet per dwelling unit7
- Owner-builder
- Own-use licensing exemption; building permits still apply9
Who to call
Building permits
Rose Township Building, Zoning & Code Enforcement Department
Township building applications and local zoning questions
9080 Mason St., Holly, MI 48442
Septic permits
Oakland County Health Division, Environmental Health Services
Septic permits, site evaluations and before-covering inspections
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Rose Township means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Rose Township, MI?
Rose Township home construction requires a written building-permit application before construction, subject to construction-code exceptions.1 The township’s Building, Zoning & Code Enforcement Department is the local contact for building applications and zoning questions.2 Michigan’s residential-builder licensing exemption covers a person erecting a residential structure for their own use and occupancy on their own property; the exemption does not remove building-permit, inspection or zoning requirements.9 Permitted construction is subject to inspections, and a new or altered building subject to the code cannot be occupied until the code official issues a certificate of occupancy.1011
Who handles building applications in Rose Township?
Contact the Rose Township Building, Zoning & Code Enforcement Department at 248.634.0290 or [email protected]; the township lists 9080 Mason St., Holly, MI 48442.2 Rose Township offers a GovWell system where applicants can submit requests, track status and access information online.2 Ask the department which building application documents and zoning approvals your proposed home needs before submitting plans.2 Keep the septic application separate: Oakland County Health Division issues septic permits and conducts construction and final inspections for onsite sewage systems.12
Does Rose Township have zoning, lot-size rules and setbacks?
Rose Township has local zoning, including agricultural and residential districts with different dimensional standards.313 In AG/RP, the minimum lot area is 10 acres and minimum width is 330 feet.5 In R-1A, the minimum lot area is 1.5 acres without water or sewer, 1 acre with public sewer, or 0.5 acre with both public water and public sewer; corresponding widths are 165, 110 and 100 feet.6 R-1A requires at least 1,300 square feet of floor area per dwelling unit.7 R-1A setbacks are 50 feet front and rear, with a least side yard of 10 feet and total side yards of 20 feet.14 Ask the township department to identify the parcel’s district and confirm the building envelope before choosing a house plan.2
How do septic permits work inside Rose Township?
Oakland County Health Division handles onsite sewage disposal in Rose Township, including permits for new systems and replacement, alteration or repair of existing systems.48 A new residential septic permit for vacant land costs $325; a residential repair permit costs $221.15 Applicants can use the county’s Citizen Access Portal after registering an account, or submit an application at a county office.16 Required inspections appear on the septic permit; when no special inspections are listed, a final before-covering inspection is required.17 Oakland County’s soil rating shows only 9.8% of soils as not limited for conventional drain fields; that countywide screening figure calls for a parcel-specific site evaluation, not a conclusion that septic is impossible.18
Can you live in an RV or tiny home in Rose Township?
We could not confirm permission for long-term RV occupancy on private land in Rose Township; ask the township’s Building, Zoning & Code Enforcement Department about the intended duration and use before relying on an RV as housing.2 We also could not confirm a separate tiny-home occupancy rule; ask the same department whether the proposed structure qualifies as a dwelling in the parcel’s district.2 In R-1A, a dwelling unit must meet the 1,300-square-foot minimum, so a small-house proposal needs district-specific review.7 Rose Township’s prohibition on camping in township parks concerns park land and does not establish the private-land RV answer.19
Building a home in Rose Township: what steps come first?
- Ask the township building and zoning department to identify the zoning district, permitted home proposal and applicable lot dimensions before preparing construction plans.213
- Arrange the septic application and site review with Oakland County Health Division if the home will use an onsite sewage system.812
- Before drilling a well, ask Oakland County Health Division which local well-permit or notification requirement applies; Michigan’s requirements depend on the county ordinance.20
- Submit the written building-permit application before construction, then arrange the enforcing agency’s required construction inspections.110
- Obtain the code official’s certificate of occupancy before using a new or altered building subject to the code.11
What stays with Oakland County, and what should Rose Township buyers check?
Rose Township decides local zoning, while Oakland County Health Division handles septic approvals and inspections inside the township.312 For land outside Rose Township, consult the Oakland County guide and identify the local planning authority: Oakland County itself does not control city, village or township zoning.21 Michigan’s EGLE floodplain requirements can also affect a homesite: new residential construction is prohibited in the floodway, and qualifying river, stream or drain floodplain work requires state review.22 We could not confirm a Rose Township rule allowing alternative off-grid sanitation; ask Oakland County Health Division to review the proposed sewage system before buying equipment.23
Watch-outs
Sources
- Stille-DeRossett-Hale Single State Construction Code Act, MCL 125.1510 (Michigan statewide rule), quoted and re-checked
- Rose Township Building, Zoning & Code Enforcement Department (rosetownship.com)
- Zoning (Rose Township), quoted and re-checked
- Proposed Use of Septic (Rose Township), quoted and re-checked
- library.municode.com (Rose Township), quoted and re-checked
- Sec. 38-180. Area and bulk requirements (Rose Township), quoted and re-checked
- Sec. 38-180. Area and bulk requirements (Rose Township), quoted and re-checked
- Proposed Use of Septic (Rose Township), quoted and re-checked
- Frequently Asked Questions – Residential Builder (Michigan statewide rule), quoted and re-checked
- MCL 125.1512, Inspection of construction (Michigan statewide rule), quoted and re-checked
- Certificate of Occupancy Request (Michigan statewide rule), quoted and re-checked
- Onsite Sewage Disposal System (Septic), quoted and re-checked
- Zoning (Rose Township), quoted and re-checked
- Sec. 38-180. Area and bulk requirements (Rose Township), quoted and re-checked
- Onsite Sewage Disposal System (Septic) — applications and fees, quoted and re-checked
- Onsite Sewage Disposal System (Septic) — applications and fees, quoted and re-checked
- Onsite Sewage Disposal System (Septic), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Sec. 24-21. Camping (Rose Township), quoted and re-checked
- Before you start a well drilling business (Michigan statewide rule), quoted and re-checked
- Local Community Planning & Zoning, quoted and re-checked
- Floodplains (Michigan statewide rule), quoted and re-checked
- Oakland County Health Division, Environmental Health Services (oaklandcountymi.gov)
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.