Richmond, Michigan requires building permits for new work, additions and alterations, and the city administers its own zoning.12 For Richmond parcels in Macomb County, septic permits come from the Macomb County Health Department; in the St. Clair County portion, contact the St. Clair County Health Department.34 Richmond prohibits using an RV for living or residential purposes on a residential lot.5
At a glance
- Building permits
- Required for new work, additions and alterations; contact Richmond’s Building Department.16
- Zoning
- City zoning applies; lot dimensions and setbacks depend on the district.27
- Septic permits
- Macomb County Health Department for the Macomb portion; St. Clair County Health Department for the St. Clair portion.34
- RV living
- Prohibited on residential lots; parking or storage permission does not allow residential use.5
- Minimum home size
- Minimum gross floor area is 1,500 square feet per unit in R-1 and 1,000 in R-3.89
- Owner-builder
- Michigan’s own-use, own-occupancy licensing exemption does not waive building permits, inspections or zoning.10
- Wells
- Macomb County requires a well permit for new and repair/replacement residential wells in its portion of Richmond.11
Who to call
Building permits
City building permits, construction-code enforcement and inspection scheduling.
36725 Division Road Richmond, MI 48062
Zoning
Richmond Planning & Economic Development Department
Development applications, pre-application meetings and zoning requirements.
36725 Division Road Richmond, MI 48062
Septic permits
Macomb County Health Department, Environmental Health Services Division
Soil evaluations, septic permits and septic inspections for Richmond parcels in Macomb County.
Septic permits
St. Clair County Health Department, Environmental Health Division
Septic approval for Richmond parcels in St. Clair County.
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Richmond means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Richmond, MI?
Richmond requires building permits for new work, additions and alterations; the city’s examples include renovations, demolition, roof repairs or replacements, decks, swimming pools, sheds and fences.1 Ask the Richmond Building Department about your proposed work before starting, including which electrical, plumbing or mechanical approvals apply.6
Michigan’s owner-builder licensing exemption applies when an individual builds on the individual’s property for personal use and occupancy; the exemption does not remove building-permit, inspection, code, zoning or utility requirements in Richmond.10 Confirm the applicable construction-code edition with Richmond’s Building Department when preparing plans.6
Who handles Richmond building permits and zoning applications?
The Richmond Building Department enforces construction codes for building, electrical, plumbing and mechanical work; the Building Clerk takes inspection requests and schedules the appropriate inspector.6 Reach the building counter at (586) 727-7571 ext. 202 or [email protected].6
Richmond’s Planning & Economic Development Department requires a pre-application meeting before a development application is submitted.12 The meeting brings planning, public works, fire and building staff together to review a preliminary site plan, explain zoning requirements and discuss project timing.12 Contact planning at (586) 727-7571 or [email protected] to discuss your proposal.12
Does Richmond have zoning, minimum lot sizes and setbacks?
Richmond has city zoning with separate districts and dimensional standards; the parcel’s district determines which lot and building limits apply.27 In Richmond’s R-1 district, minimum lot area is 10,890 square feet, minimum width is 80 feet and minimum depth is 120 feet.13 In R-3, the corresponding minimums are 7,200 square feet, 60 feet wide and 120 feet deep.14
Richmond’s R-1 front and rear yard minimums are 30 and 35 feet, with at least 10 feet on one side and 20 feet total across both side yards.15 R-3 requires front and rear yards of 25 and 35 feet, with at least 5 feet on one side and 16 feet total.16 Arterial-street frontage can increase the front setback, and corner lots in R-3 have two front yards; have Planning review the parcel before placing a house on a sketch.151612
How do septic permits work inside Richmond?
For Richmond land in Macomb County, the Macomb County Health Department evaluates sites, conducts soil evaluations, issues septic permits and inspects septic systems.317 Macomb County’s new-construction process requires an acceptable soil evaluation before the septic permit, followed by an application, fee, property tax ID, legal description or survey, and a professionally prepared dimensioned site plan.18 The Richmond-specific Macomb fee figures are $489 for a new septic permit and $150 for a repair permit.19
For Richmond land in St. Clair County, a sewage permit from the St. Clair County Health Department is required before installing or repairing a septic system.4 Contact its Environmental Health Division at (810) 987-5306.20 Michigan requires public-sewer connection where available or an approved private sewage-disposal system otherwise; ask Richmond and the appropriate county health office which route applies to the parcel.21
Can you live in an RV or tiny home on Richmond land?
Richmond prohibits using a recreational vehicle for living or residential purposes on a residential lot.5 Richmond’s allowance for RV parking or storage does not provide permission to use the vehicle as a home while building.5
We could not confirm a Richmond rule specifically approving tiny-home occupancy; ask Planning about the proposed dwelling and district before purchasing a small house.12 Richmond’s R-1 district requires at least 1,500 square feet of gross floor area per unit, while R-3 requires at least 1,000 square feet per unit.89 Those district minimums must be addressed separately from the building-permit requirement for new construction.891
What are the steps for building a home in Richmond?
- Start with Richmond Planning: identify the zoning district, test the proposed lot and house against district dimensions, and arrange the required pre-application meeting for a development application.212
- Establish the wastewater route: Michigan requires public sewer where available or an approved private system; for Macomb County septic sites, obtain an acceptable soil evaluation before the septic permit.2118
- Submit the building-permit application before construction, with the plans and site plan required by Michigan’s construction law, to Richmond’s enforcing office.226
- Schedule construction inspections through Richmond’s Building Clerk as work proceeds.623
- Obtain the code official’s certificate of occupancy before using a new or altered building subject to Michigan’s construction code.24
What should you check before buying land in Richmond?
For a Richmond property in Macomb County that uses septic or a drinking-water well, system evaluation is required before transfer, subject to exemptions; the report must reach the Health Department at least 5 days before closing.25 A new residential well in Richmond’s Macomb County portion requires a permit, with a listed fee of $448 and separate water-sample charges where applicable.11
Ask Richmond Planning and the Building Department to confirm public-service availability and any local floodplain conditions before committing to a house location.126 Michigan prohibits new residential construction in regulated floodways, and driveway work in state-highway right-of-way can require an MDOT driveway permit in addition to local building approval.2627 For land outside Richmond city limits, use the Macomb County guide and identify the municipality administering that parcel’s zoning.28
Watch-outs
- Richmond’s residential-lot RV storage rules do not allow residential occupancy; plan another place to live during construction.5
- Confirm whether the Richmond parcel lies in Macomb or St. Clair County before applying for septic approval.34
- We could not confirm Richmond-specific permission for composting toilets or other off-grid sanitation; ask the relevant county health office, and account for Michigan’s sewer-or-septic requirement.172029
Sources
- Building (Richmond), quoted and re-checked
- Sec. 5.101. Table of dimensional standards by district (Richmond), quoted and re-checked
- Onsite sewage disposal (septic) systems (Richmond), quoted and re-checked
- On-Site Sewage Disposal Systems (Richmond), quoted and re-checked
- Sec. 9.04. Residential parking standards (Richmond), quoted and re-checked
- Richmond Building Department (cityofrichmond.net)
- Sec. 5.101. Table of dimensional standards by district (Richmond), quoted and re-checked
- Sec. 5.101. Table of dimensional standards by district (Richmond), quoted and re-checked
- Sec. 5.101. Table of dimensional standards by district (Richmond), quoted and re-checked
- Frequently Asked Questions – Residential Builder (Michigan statewide rule), quoted and re-checked
- Drinking water wells (Richmond), quoted and re-checked
- Richmond Planning & Economic Development Department (cityofrichmond.net)
- Sec. 5.101. Table of dimensional standards by district (Richmond), quoted and re-checked
- Sec. 5.101. Table of dimensional standards by district (Richmond), quoted and re-checked
- Sec. 5.101. Table of dimensional standards by district (Richmond), quoted and re-checked
- Sec. 5.101. Table of dimensional standards by district (Richmond), quoted and re-checked
- Macomb County Health Department, Environmental Health Services Division (macombgov.org)
- Procedures for Obtaining an Onsite Sewage Disposal Permit, quoted and re-checked
- Onsite sewage disposal (septic) systems (Richmond), quoted and re-checked
- St. Clair County Health Department, Environmental Health Division (stclaircounty.org)
- Michigan Part 7 Plumbing Code Rules (Michigan statewide rule), quoted and re-checked
- Stille-DeRossett-Hale Single State Construction Code Act, MCL 125.1510 (Michigan statewide rule), quoted and re-checked
- MCL 125.1512, Inspection of construction (Michigan statewide rule), quoted and re-checked
- Certificate of Occupancy Request (Michigan statewide rule), quoted and re-checked
- Property transfers, quoted and re-checked
- Floodplains (Michigan statewide rule), quoted and re-checked
- Infrastructure permits (Michigan statewide rule), quoted and re-checked
- Planning services - Land use, zoning and policy, quoted and re-checked
- Disposal of residential wastewater such as swimming pool water (Michigan statewide rule), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.