Macomb County, Michigan
Armada Township is a township in Macomb County, Michigan. Armada Township adopts its own zoning, so inside its limits Armada Township’s rules apply, not the county’s. Septic permits inside Armada Township come from Macomb County (Macomb County Health Department, Environmental Health Services Division · 586-469-5236). 24 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Macomb County page.
Residential and commercial construction, additions and detached accessory buildings inside Armada township, issued by the Armada Township building department
“a permit is required for all detached accessory buildings over 200 square feet and all buildings must comply with zoning requirements.”
Permitted building, electrical, plumbing and mechanical work inside Armada township
“inspections are required after obtaining building, electrical, plumbing or mechanical permits.”
Occupancy of any building or portion of a building in Armada township
“no building or portion of a building may be occupied until a certificate of occupancy has been issue and obtained.”
Land inside Armada township's limits: the township adopts and administers its own zoning ordinance (Ordinance #114)
“zoning ordinance #114 amended 10/2/2019 zoning ordinance #114-48 amended 7/8/2026”
Zoning districts of Armada township's Zoning Ordinance #114
“zoning district table of permitted uses – adopted 5-10-2023”
Single-family dwelling in the R-1 residential zoning district inside Armada township
minimum first-floor area, one-story: >= 1000 square feet · minimum first-floor area, one-and-one-half-story: >= 800 square feet · minimum first-floor area, two-story: >= 650 square feet (no-basement homes add 100 sq ft)
“1st floor 1,000 sq. ft. 800 sq. ft. 650 sq. ft. total one (1) story one and one-half (1½) story: two (2) story: 2nd floor 1,000 sq. ft. 1,200 sq. ft. 1,300 sq. ft.”
“e. minimum floor area in square feet: 1st floor total total one (1) story: 1,000 sq. ft. 1,000 sq. ft. one and one-half (1½) story: 800 sq. ft. 1,200 sq. ft. two (2) story: 650 sq. ft. 1,300 sq. ft.”
Lots in the R-1 residential zoning district inside Armada township where there is no public sewer
minimum parcel size without public sewer: >= 43560 square feet (applies only without public sewer)
“in the r-1 district, the following area, height, density, bulk and placement regulations shall apply: without public sewer minimum parcel size: 43,560 square fee”
“minimum parcel size: one and three quarter (1.75) acres (76,230 square feet)”
Principal buildings in the R-1 residential zoning district inside Armada township
minimum least side yard: 15 feet · minimum total of both side yards: 30 feet · minimum rear yard: 60 feet
“least side yard: total of both sides: rear yard: lot coverage: e. minimum floor area in square feet: 15 feet 30 feet 60 feet 25 percent”
“a. least side yard: 25 feet b. total of both sides: 50 feet c. rear yard: 60 feet d. lot coverage: 25 percent”
Principal buildings on AG lots inside Armada township
maximum lot coverage: <= 25 percent
“a. least side yard: 25 feet b. total of both sides: 50 feet c. rear yard: 60 feet d. lot coverage: 25 percent”
“least side yard: total of both sides: rear yard: lot coverage: e. minimum floor area in square feet: 15 feet 30 feet 60 feet 25 percent”
Principal buildings in the R-1 residential zoning district inside Armada township
maximum building height: <= 35 feet · maximum building height: <= 2 stories
“c. maximum height of structures: two (2) stories; thirty-five (35) feet.”
Living or housekeeping use of a recreational vehicle that is parked or stored on a residential lot in Armada township
“recreational vehicles which are parked or stored shall not be used for living or housekeeping purposes”
Manufactured home placed within a manufactured housing community in Armada township
minimum manufactured home size in a manufactured housing community: >= 1100 square feet (applies only inside a manufactured housing community)
“the minimum size of any manufactured home placed within a manufactured housing community shall be one thousand one hundred (1,100) square feet.”
Creation of new lots or condominium subdivisions inside Armada township
“all streets and roads in a condominium subdivision shall conform to the standards of the armada township subdivision ordinance.”
Building permit fees for residential house construction and additions up to 2,000 sq ft in Armada township
plan review fee, house up to 2,000 sq ft: 120 USD · administration fee, house up to 2,000 sq ft: 100 USD · base permit fee, house up to 2,000 sq ft: 250 USD · per inspection fee: 75 USD · bond for new homes: 1000 USD
“plan review fee: $120.00 administration fee: $100.00 base permit fee: $250.00 per inspection required: $75.00 bond for new homes: $1,000.00”
Building, electrical, plumbing and mechanical permit applications for work in Armada township
typical residential/commercial permit processing time: 10 days (approximately)
“residential and commercial permits take approximately 10 days to process due to the review time needed before approval is granted.”
Armada Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New residential and other building construction inside Armada township, under the Michigan building code that the township applies through its building department
“all building code plans shall comply with the current michigan building code.”
Private on-site septic systems for homes inside Armada township, permitted by the Macomb County Health Department
“septic permits are issued by: macomb county health department”
New homes in Armada township served by a septic system, permitted by the Macomb County Health Department (43525 Elizabeth Road, Mt. Clemens)
“septic permits must be current, and all engineering plans must be approved and presented prior to the building permit being issued.”
Private water well serving a new home in Armada township, approved by the Macomb County Health Department
“well approval must be obtained from the macomb county health department prior to final occupancy”
Culvert work for access to a new home site in Armada township, permitted by the Macomb County Road Commission
“culvert permits must be obtained prior to issuing a building permit.”
We looked and could not find an official answer yet. Silence is not permission; ask Armada Township or Macomb County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Armada Township publishes no rule on the point, not that none exists. Macomb County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Armada Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.