Bolthole Index

Kent County, Michigan

Building permits, zoning and septic in Byron Township, Michigan

Byron Township, Michigan requires building permits for construction and changes of use or occupancy; submit applications to Township Inspection Services.12 Byron Township has its own zoning, while Kent County Health Department handles private septic systems and wells.345 Licensed-vehicle dwelling stays have a short-stay exception and a conditional temporary stay while building a home.6

At a glance

Building permits
Required for construction and changes of use or occupancy1
Zoning
Township zoning applies3
Septic permits
Kent County Health Department; obtain before the building permit when a new building needs septic7
Private wells
Kent County well permit required5
RV living
14-day licensed-vehicle exception; up to 90 days during construction, subject to zoning6
Setbacks
Survey must show established setbacks and minimum building elevations8
Occupancy fee
Refundable $300 for a qualifying one-family dwelling; forfeiture conditions apply9

Who to call

Building permits

Byron Township Inspection Services

Building applications, trade applications and inspection scheduling

(616) 878-9155

[email protected]

8085 Byron Center Avenue, Byron Center, MI 49315

Online permits →

Planning & zoning

Byron Township Planning

Planning and zoning inquiries through the township general contact

616-878-9066

[email protected]

8085 Byron Center Avenue, Byron Center, MI 49315

Septic permits

Kent County Health Department -- Environmental Health Division

On-site septic and well permits, site evaluations, and well/septic evaluations

(616) 632-7100

700 Fuller Ave NE Grand Rapids, MI 49503

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Byron Township means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Byron Township, MI?

Byron Township requires a building permit before construction of a building or structure and when the use or occupancy of a structure changes.1 Ordinary repairs are exempt, but structural changes, changes to required exits and work affecting health or safety do not qualify as ordinary repairs.1 Michigan construction codes apply in Byron Township, with dwelling provisions in the Michigan Residential Code.10 Michigan offers an own-use, own-occupancy exemption from residential-builder licensing for work on the individual’s own property; that exemption does not remove building permits, inspections or zoning requirements.11 Ask Inspection Services how to document an owner-builder application.2

Who issues building permits in Byron Township?

Byron Township Inspection Services is the application counter for township construction projects, reachable at (616) 878-9155.2 The township publishes online building-permit applications and inspection scheduling.12 Byron Township contracts with Professional Code Inspections for electrical inspections, but electrical applications go to Township Inspection Services.2 Applicants are responsible for contacting the township for required inspections, and truss drawings must be available at the job site for rough-in inspection.13 Use the office’s application link for the project and confirm which trade applications accompany the building application.2

Does Byron Township have zoning and setback rules?

Byron Township has local zoning; Kent County’s lack of a unified county zoning ordinance does not remove township land-use controls.314 The township building checklist requires a survey showing established setbacks and minimum building elevations, presented to the zoning official before rough-in.8 Township materials reference residential, rural/agricultural, business and industrial zones, but those references do not supply a complete district schedule.15 Ask Township Planning to identify the parcel’s district and provide its lot-size, dwelling-size, height and lot-coverage requirements before choosing a house plan.16 We could not confirm those district-specific limits or accessory-dwelling eligibility; direct those questions to Township Planning.16

How do septic and well permits work in Byron Township?

Kent County Health Department handles on-site septic permits inside Byron Township, including construction, repair, enlargement and relocation of sewage disposal facilities under its jurisdiction.7 A new building needing septic cannot receive its township construction permit until the sewage permit is obtained; direct discharge through enclosed piping to public sewer is an exception to the county sewage-permit requirement.7 New-construction septic applications need a detailed site plan and floorplans.4 Private well installation also requires a county permit.5 Arrange MISS Dig marking before the health department site visit.17 Keep septic components uncovered and accessible until final inspection and approval unless the Health Officer waives inspection.18

Can you live in an RV or tiny home in Byron Township?

Byron Township allows duly licensed vehicles to be used as dwellings for 14 consecutive days or less without otherwise subjecting them to the housing article’s dwelling provisions.6 A temporary dwelling can be used for up to 90 days while a dwelling is being constructed on the same premises, subject to the township zoning provision governing that exception.6 These exceptions do not establish unrestricted permanent RV occupancy; movable habitation units and their locations otherwise must comply with the housing article.6 Ask Township Planning to confirm the construction-stay conditions for the parcel.16 We could not confirm tiny-home occupancy, accessory-dwelling approval or a minimum dwelling size in Byron Township; ask Township Planning before purchasing a unit.16

Building a home in Byron Township: what are the steps?

Start with Township Planning to confirm the parcel’s zoning and the required setbacks shown on the survey.168 Obtain county septic approval before the township building permit if the new home needs an on-site sewage system, and arrange the private well permit when applicable.75 Submit proof of ownership, the site plan, building plans, applicable truss designs, project cost, contractor license documentation and energy and Manual J calculations to Inspection Services.12 Obtain the Kent County Road Commission driveway permit for a new home’s driveway off a public street.19 Schedule required township inspections and complete final inspections and the written occupancy permit before using a structure subject to those occupancy requirements.139

What should you check before buying land in Byron Township?

Kent County’s soil screening rates only 2% of soils “not limited” for conventional septic drain fields; this countywide figure is not a verdict on an individual Byron Township lot, so arrange a site evaluation rather than assuming septic is impossible.20 The health department offers evaluations for suitability for development and on-site wells and septic.21 Kent County septic permits and site evaluations are valid for 2 years and are non-transferrable, so confirm how an existing approval applies to your purchase.17 The township checklist calls for a Road Commission soil-erosion permit for projects within 500 feet of a waterbody.12 Applicable floodplain construction, filling and grading also require EGLE review under the county floodplain rules.22 For land beyond Byron Township, consult the Kent County guide for the county’s jurisdictional context.14

Watch-outs

  • The refundable occupancy fee for a qualifying one-family dwelling is $300, and occupancy without final inspections and a written occupancy permit can forfeit it.9
  • The 90-day construction dwelling exception requires a dwelling under construction on the same premises and compliance with the township zoning provision.6
  • We could not confirm mandatory public water or sewer connection rules or approval of off-grid sanitation; ask Township Inspection Services about utility service and Kent County Health Department about sanitation.221

Sources

  1. Building Permit Information (Byron Township), quoted and re-checked
  2. Byron Township Inspection Services (byrontownship.org)
  3. Code of Ordinances, Sec. 10-56, Travel trailers and mobile homes (Byron Township), quoted and re-checked
  4. Septic & Well | Kent County, MI, quoted and re-checked
  5. Septic & Well (Byron Township), quoted and re-checked
  6. Code of Ordinances, Sec. 10-56, Travel trailers and mobile homes (Byron Township), quoted and re-checked
  7. Sewage Disposal Regulations for Kent County, MI (Byron Township), quoted and re-checked
  8. Byron Township Long Form Building Permit Application and Checklist (Byron Township), quoted and re-checked
  9. Byron Township Long Form Building Permit Application and Checklist (Byron Township), quoted and re-checked
  10. Building Permit Information (Byron Township), quoted and re-checked
  11. Frequently Asked Questions – Residential Builder (Michigan statewide rule), quoted and re-checked
  12. Inspection Services (Byron Township), quoted and re-checked
  13. Inspection Services (Byron Township), quoted and re-checked
  14. 2025 Kent County Fair Housing Analysis & Equity Plan, quoted and re-checked
  15. Byron Township Long Form Building Permit Application and Checklist (Byron Township), quoted and re-checked
  16. Byron Township Planning (byrontownship.org)
  17. Septic & Well | Kent County, MI, quoted and re-checked
  18. Sewage Disposal Regulations for Kent County, MI (Byron Township), quoted and re-checked
  19. Byron Township Long Form Building Permit Application and Checklist (Byron Township), quoted and re-checked
  20. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  21. Kent County Health Department -- Environmental Health Division (kentcountymi.gov)
  22. Site Development Rules: Procedures and Design Standards for Stormwater Management, quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Byron Township

Byron Township’s own rules

  • InspectionsRequired

    Construction under a Byron Township building permit.

    • The applicant is responsible for contacting the township for all required inspections.
    • Rough-in truss drawings must be available at the job site for rough-in inspection.
    • The township publishes an online inspection-scheduling process.
    “I Assume the Responsibility for Contacting the Township for all Required Inspections for the Permit(s) Requested.”
  • Certificate of occupancyLimited

    New structures in Byron Township for which a certificate of occupancy is required.

    • A refundable occupancy permit fee applies.
    • The fee is forfeited if the occupancy permit is not issued within 20 days of the original written temporary occupancy permit, or if the building is occupied or used without final inspections and a written occupancy permit.
    • For multi-family structures, timing is based on completion of the entire building.
    • Reinspection fees are $30 per building, electrical, mechanical, plumbing, and fire trade, deducted from the refundable fee.

    one-family dwelling occupancy fee: 300 USD (refundable subject to stated forfeiture conditions) · multi-family dwelling occupancy fee: 150 USD (condo/duplex) · demolition occupancy fee: 500 USD (refundable subject to stated forfeiture conditions) · reinspection fee: per 30 USD (each listed trade)

    “The above fee shall be forfeited if the Occupancy Permit is not issued within 20 days of the original written temporary Occupancy Permit, or if the building is occupied or used for any other purpose without final inspections being conducted and an Occupancy Permit written.”
  • Local zoningPresent

    Land inside Byron Township.

    • The township code refers to section 4.29(1) of the township zoning ordinance and to residential districts designated by that ordinance.
    “as allowed by section 4.29(1) of the township zoning ordinance.”
  • Zoning districtsPartial

    Zoning district references used by Byron Township materials; this is not a complete district schedule or zoning map.

    • The official permit form references RU, RD, MFR, RA, RR, and RS zones and separately references business and industrial zones.
    • A complete official district schedule and map were not located in the opened sources.
    “Burning of construction materials in a RU, RD, and MFR is prohibited. Burning is permitted in accordance with the Byron Township Burning Ordinance No 306 in RA, RR, RS, as long as the location of the said allowed burning exceeds 200 feet from any other dwelling and meets all other ordinance requirements”
  • SetbacksSpecified

    New residential and commercial buildings inside Byron Township.

    • The exact district-specific numeric setbacks were not present in the opened permit checklist.
    • A survey must be presented to the zoning official before rough-in and must include established setbacks and minimum building elevations.
    “Surveys shall include all setback and minimum building elevations as established. The Builder shall be responsible for compliance of setbacks & minimum building elevations.”
  • Living in an RVTemporary only (with conditions)

    House trailers and other duly licensed vehicles used as dwellings inside Byron Township.

    • All movable units used for human habitation and the areas where they are located must comply with the housing-code article.
    • Licensed vehicles may be occupied as dwellings for 14 consecutive days or less without otherwise being subject to the dwelling provisions.
    • A temporary dwelling is allowed for up to 90 days while a dwelling is being constructed on the same premises, as allowed by section 4.29(1) of the township zoning ordinance.

    ordinary licensed-vehicle occupancy: <= 14 days (without otherwise being subject to the article's dwelling provisions) · temporary construction dwelling: <= 90 days (while a dwelling is being constructed on the same premises and subject to zoning section 4.29(1))

    “may be occupied or used as a dwelling for 14 consecutive days or less, without otherwise being subject to the provisions of this article for dwellings, or when used as a temporary dwelling for up to 90 days during which time a dwelling is being constructed on the same premises”
  • Camping on your landProhibited

    Camping or overnight lodging in Byron Township parks.

    • A written permit from the parks department can authorize the activity.
    • The supplied rule is park-specific and does not establish a private-land camping rule.
    “It shall be unlawful for any person to establish a camp or other lodging place, or erect a tent, shelter, shack, or other temporary lodging in any township park, or to remain in any township park overnight or any time outside the posted hours of operation, unless specifically authorized to do so by written permit from the parks department.”
  • Permit feesPublished (with conditions)

    Refundable occupancy-permit fees for qualifying new structures inside Byron Township.

    • The source publishes occupancy fees, not a complete general building-permit fee schedule.
    • The fee is forfeited if the stated 20-day or final-inspection conditions are not met.
    • Reinspection fees are deducted from the refundable occupancy fee.

    one-family dwelling occupancy fee: 300 USD · multi-family dwelling occupancy fee: 150 USD (condo/duplex) · demolition occupancy fee: 500 USD · reinspection fee: per 30 USD (each trade)

    “On any new structure for which a Certificate of Occupancy is required upon completion shall be charged a refundable occupancy permit fee based on the following schedule:”
  • Permit processPublished (with conditions)

    Building-permit applications for new houses and commercial buildings inside Byron Township.

    • Submit the application, legal description/proof of ownership, site plan, building plans, truss designs when applicable, project cost, builder license, energy calculations, and Manual J calculations.
    • A township engineer approval is required for commercial projects.
    • A Kent County Road Commission driveway permit is required for all driveways off public streets.
    • A Kent County Road Commission soil-erosion permit applies within 500 feet of a waterbody.
    • Two paper plan sets or one paper and one digital set are required.
    • Applications and inspection scheduling are available through the township's online services.

    soil-erosion distance threshold: <= 500 feet from a waterbody (drains, lakes, streams, and wetlands)

    “Floor Plans, elevations, and a typical wall section which must show all building materials, planned, along with the size and spacing of each. Two Sets Required OR One Set and One Digital Set Emailed to [email protected]”

Rules another office applies inside Byron Township

Byron Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building permitRequired

    Construction of buildings or structures and changes in use or occupancy inside Byron Township.

    • A permit is not required for ordinary repairs.
    • Ordinary repairs exclude structural changes, changes to required means of egress, and listed plumbing, electrical, mechanical, and other work affecting public health or general safety.
    “Before construction of a building or structure, an owner, or the owner's builder, architect, engineer, or agent, shall submit an application in writing to the appropriate enforcing agency for a building permit. A permit is also required when the use or occupancy of a structure or portion thereof is changed.”
  • Building code adoptedAdopted

    Construction, alteration, addition, repair, removal, demolition, use, location, occupancy, and maintenance of buildings and structures inside Byron Township.

    • One- and two-family dwelling provisions are included in the Michigan Residential Code.
    “The Michigan Building Code controls all matters concerning the construction, alteration, addition, repair, removal, demolition, use, location, occupancy, and maintenance of all buildings and structures and their service equipment. Presently, provisions for one- and two-family dwellings are included in the Michigan Residential Code.”
  • Septic permitRequired

    Construction, repair, enlargement, or relocation of a sewage disposal facility serving premises inside Byron Township and subject to Kent County Health Department jurisdiction.

    • No county permit is required when all sewage discharges directly into a public sewer through enclosed piping or conduits.
    • No county permit is required for certain state or federal agency jurisdiction where authority was not delegated to the Department.
    • The Health Officer may determine a permit unnecessary for minor actions.
    • A township may not issue a construction permit for a new building requiring a sewage facility until the sewage permit is obtained.
    “Before any person shall construct, repair, enlarge, or relocate any sewage disposal facility serving any premise within Kent County, he shall first obtain a permit authorizing such action from a Health Officer.”
  • Septic inspectionRequired

    Sewage disposal facilities inside Byron Township under a Kent County Health Officer permit.

    • Final inspection is required before approval.
    • No facility or component may receive final cover or become inaccessible before final inspection and Health Officer approval.
    • The Health Officer may waive the final inspection if adequacy can be verified by other means.
    • The Health Officer attempts to respond within two working days after a final-inspection request.
    “All work authorized by a permit issued by the Health Officer shall be subject to a final inspection before such work shall be approved. No sewage disposal facility or component thereof shall be given a final cover, or otherwise rendered inaccessible, until a final inspection has taken place, and the Health Officer has given his approval.”
  • Well permitRequired

    Installation of residential, non-residential, test, irrigation, geothermal, or other on-site water-supply wells inside Byron Township.

    • Kent County identifies separate well services and applications.
    • Type II public-supply wells have separate requirements; a Type II non-community public water supply serves 25 or more people at least 60 days per year or has 15 or more service connections.
    “Required permit for installation of on-site water supply (well) systems.”
  • Subdividing landRegulated (with conditions)

    Divisions of land inside Byron Township that are under one acre, subdivisions, and site condominiums requiring local-health-department review, especially where onsite wastewater or individual wells are involved.

    • The Kent County page states that the Michigan Land Division Act requires local health-department review for all divisions under one acre, subdivisions, and site condominiums.
    • The county health department evaluates proposed divisions served by onsite wastewater and/or individual water-supply wells.
    “An evaluation of a proposed division of land to be served by onsite wastewater disposal systems and/or individual water supply wells. The Michigan Land Division Act (Public Act 288 of 1967) requires that all divisions of land under one acre, subdivisions, and site condominiums be reviewed by the local health department.”
  • Driveway accessRequired

    New houses and commercial buildings inside Byron Township with driveways off public streets.

    • The driveway permit is issued by the Kent County Road Commission.
    • The requirement applies to new houses and commercial buildings and to driveways off public streets.
    “Permit must be obtained from the Kent County Road Commission for all driveways off public streets.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Byron Township or Kent County directly.

  • Owner-builder exemption — Owner-builder work on residential structures inside Byron Township.
  • Minimum dwelling size — One-family dwellings in Byron Township residential or rural/agricultural districts.
  • Minimum lot size — Lots for one-family dwellings in Byron Township residential or rural/agricultural districts.
  • Lot coverage — Lots inside Byron Township.
  • Building height — Buildings inside Byron Township.
6 more unanswered
  • Tiny homes
  • Accessory dwellings
  • Off-grid sanitation
  • Mandatory utility hookup
  • Agricultural exemption
  • Building in a floodplain

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Byron Township publishes no rule on the point, not that none exists. Kent County’s page lists the county offices to call.

← All of Kent County: county rules, score and offices