Hancock Township, Michigan requires building permits through the Houghton County Building Department before work begins.1 Hancock Township has no zoning ordinance, but development ordinances still apply.2 Septic approval and private-well permits come from the Western Upper Peninsula Health Department.34

At a glance

Building permits
Required; Houghton County issues them1
Zoning
No township zoning ordinance; development ordinances remain2
Septic permits
Health department approval before system construction5
Private wells
Health department permit before installation4
Owner-builder
Own-use licensing exemption; building permits still apply6
Move-in approval
Certificate of use and occupancy required for new construction7

Who to call

Planning & zoning

Hancock Township Supervisor

Contact for township development-ordinance questions; confirm the current compliance-application submission process.

906-369-0466

[email protected]

Planning & zoning

Hancock Township Ordinance Compliance Application

Township compliance application and site-plan instructions; confirm current submission details with the supervisor.

Building permits

Houghton County Building Department

Building and trade permits and inspections for Hancock Township.

906-482-2260

[email protected]

Houghton County Courthouse 1st Floor 401 E. Houghton Ave. Houghton, MI 49931

Septic permits

Western Upper Peninsula Health Department — Environmental Health Division

Septic site evaluations, construction permits and inspections; private-well permitting.

906-482-7382

[email protected]

540 Depot St, Hancock, MI 49930

Roads & driveways

Houghton County Road Commission

Driveway and other work within county-road right-of-way.

906-482-3600

Contact details are copied from each office’s official page and were checked against it on October 12, 2026.

Off-grid gear

Going off-grid in Hancock Township means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Hancock Township, MI?

Hancock Township building work requires a permit issued by Houghton County before construction starts; separate electrical, plumbing and mechanical applications may also be required.1 Starting before issuance adds 50% to the permit fee.1 Michigan construction-code requirements apply inside Hancock Township even though the township has no zoning ordinance.82 An owner building a residence for personal use and occupancy on the owner’s property may qualify for a residential-builder licensing exemption, but that exemption does not remove building permits or inspections.6

Who issues building permits in Hancock Township?

The Houghton County Building Department issues building and trade permits for Hancock Township; contact the department at 906-482-2260 or [email protected].9 Hancock Township also publishes an ordinance-compliance application that directs applicants to the township supervisor and separately to the county for a building permit.10 Ask the Hancock Township Supervisor to confirm the current compliance submission process.11 The published county fee schedule is marked effective October 2021 and lists plan review at $125 per hour; ask the Building Department for a current project estimate.12

Does Hancock Township have zoning or rules for RVs and tiny homes?

Hancock Township has no zoning ordinance, but several ordinances affect development; absence of zoning does not establish permission for a particular dwelling or camping use.2 We could not confirm a township rule allowing residential RV occupancy, a minimum home size, or specific lot-size and setback requirements; ask the Township Supervisor about the proposed use and parcel.11 For a newly constructed tiny home subject to Michigan’s construction code, building-code compliance and a certificate of use and occupancy remain required.87 Michigan’s temporary-campground licensing rule addresses campgrounds involving 5 or more recreational units, rather than permission to live in an individual RV on private land.13

How do septic and well permits work in Hancock Township?

The Western Upper Peninsula Health Department evaluates proposed building sites and issues septic construction permits inside Hancock Township.3 A suitable site evaluation, approved complete application and payment of fees must precede new or replacement septic construction.5 Health Officer permission is needed before a building permit is issued for premises requiring a sewage system.14 The installer requests a final septic inspection, and the system must receive approval before covering.15 Private wells serving dwellings or small businesses require a health-department permit before installation and a registered well driller.4 Houghton County’s soil data rate only 1.6% of soils “not limited” for conventional drain fields; that countywide screening figure makes parcel evaluation important, rather than proving septic is impossible.16

Building a home in Hancock Township: what comes first?

Start with the Hancock Township Supervisor about ordinance compliance and submit the township application’s site information, including septic, well, driveway and waterbody locations.1110 For a parcel needing septic, obtain the health department’s site evaluation and approval before the building permit; obtain a private-well permit before installation.5144 Next, submit the building application, scaled plans and site plan to the appropriate enforcing agency, and wait for county building-permit issuance before starting work.171 Arrange construction inspections through the enforcing agency and the septic final inspection through the health department.1815 Obtain the certificate of use and occupancy before occupying new construction.7

What should you check before buying land in Hancock Township?

For access onto a county road, contact the Houghton County Road Commission before new or changed driveway work within its right-of-way.19 Access constructed or reconstructed within state-highway right-of-way needs an MDOT driveway permit.20 Michigan prohibits new residential construction in regulated river floodways, so a waterside home proposal needs floodplain review as well as building approval.21 Michigan requires public-sewer connection where available, or an approved private sewage system; ask the health department and Township Supervisor how availability is determined for the parcel.221411 For land outside Hancock Township, use the Houghton County guide to identify county building and septic responsibilities.914

Watch-outs

  • Starting Hancock Township building work before permit issuance adds a 50% fee.1
  • We could not confirm approval for composting toilets or privies in Hancock Township; ask Western Upper Peninsula Health Department before designing off-grid sanitation.2314
  • We could not confirm Hancock Township short-term-rental rules; ask the Township Supervisor before buying for rental use.11

Sources

  1. Building Department | Houghton County, Michigan (Hancock Township), quoted and re-checked
  2. Houghton County Master Plan (Hancock Township), quoted and re-checked
  3. On-Site Sewage Program – Western UP Health Department (Hancock Township), quoted and re-checked
  4. Water Supply Program – Western UP Health Department (Hancock Township), quoted and re-checked
  5. Sewage System Permitting – Western UP Health Department (Hancock Township), quoted and re-checked
  6. Frequently Asked Questions – Residential Builder (Michigan statewide rule), quoted and re-checked
  7. Michigan Single State Construction Code Act (Hancock Township), quoted and re-checked
  8. Building Permit Information – Michigan LARA (Hancock Township), quoted and re-checked
  9. Houghton County Building Department (houghtoncounty.net)
  10. Hancock Township Ordinance Compliance Application (hancocktwp.org)
  11. Hancock Township Supervisor (hancocktwp.org)
  12. Houghton County Building Department Permit Fee Schedule (Hancock Township), quoted and re-checked
  13. Temporary campgrounds (Michigan statewide rule), quoted and re-checked
  14. Western Upper Peninsula Health Department — Environmental Health Division (wupdhd.org)
  15. Sewage System Permitting – Western UP Health Department (Hancock Township), quoted and re-checked
  16. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  17. Stille-DeRossett-Hale Single State Construction Code Act, MCL 125.1510 (Michigan statewide rule), quoted and re-checked
  18. courts.michigan.gov (Michigan statewide rule), quoted and re-checked
  19. Permits | Houghton County Road Commission, quoted and re-checked
  20. Infrastructure permits (Michigan statewide rule), quoted and re-checked
  21. Floodplains (Michigan statewide rule), quoted and re-checked
  22. Michigan Part 7 Plumbing Code Rules (Michigan statewide rule), quoted and re-checked
  23. Disposal of residential wastewater such as swimming pool water (Michigan statewide rule), quoted and re-checked

Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Hancock Township

Hancock Township’s own rules

  • Building permitRequired

    Building work inside Hancock Township; permits are issued by Houghton County.

    • Separate plumbing, mechanical, and electrical applications may also be required.
    • Work started before issuance is subject to an additional 50% fee.

    early-start surcharge: 50 percent (Additional fee if work begins before permit issuance)

    “A permit application must be filed and permit issued prior to any work being done.”
  • InspectionsRequired

    Construction inside Hancock Township inspected through the county building-permit process.

    • Inspection charges vary by permit type and number of inspections.
    • Final truss drawings are required before rough-in inspection.

    additional inspection fee: 75 USD

    “An enforcing agency shall periodically inspect all construction undertaken pursuant to a building permit issued by it”
  • Local zoningAbsent

    Land inside Hancock Township.

    • Hancock Township has several development-related ordinances despite having no zoning ordinance.
    “Although Hancock Township does not have zoning, it has several ordinances affecting development”
  • Zoning districtsNot published

    Zoning districts inside Hancock Township.

    • The official county master plan states that Hancock Township does not have zoning; the township ordinance page lists development ordinances but no zoning districts.
    “Here are the town ordinance. You can download them individually or download all of them below.”
  • Permit feesPublished (with conditions)

    County building-permit fees charged for work inside Hancock Township.

    • The schedule is marked effective 10/2021.
    • The first $75 of an application fee is non-refundable.
    • Permit fees vary by cost of improvement, plan review, inspections, and permit type.
    • Permits are valid for two years from issuance.
    • Work begun before permit issuance incurs an additional 50% of the permit fee.

    application fee floor: 75 USD (First $75 non-refundable) · plan review: 125 USD/hour · early-start surcharge: 50 percent

    “BUILDING PERMIT FEE SCHEDULE Effective 10/2021 [...] Plan Review: $125.00 / Hour”

Rules another office applies inside Hancock Township

Hancock Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building code adoptedAdopted (with conditions)

    Construction inside Hancock Township under Michigan's statewide construction-code system.

    • The appropriate enforcing agency administers permits and enforcement.
    “The Michigan Building Code controls all matters concerning the construction, alteration, addition, repair, removal, demolition, use, location, occupancy, and maintenance”
  • Certificate of occupancyRequired

    New construction inside Hancock Township subject to the Michigan Construction Code Act.

    • The certificate is issued by the appropriate enforcing agency after permitted work is completed.
    • Existing occupancy may continue for 30 days after completion of an alteration if it was not discontinued during the alteration.
    • A temporary certificate may be issued when the statutory conditions are met.
    • The agency must issue the certificate within five business days after a proper written application and fee when the building is entitled to it.

    issuance deadline: 5 business days (After written application and payment of established fee when entitled)

    “A building or structure hereafter constructed shall not be used or occupied in whole or in part until a certificate of use and occupancy has been issued”
  • Who permits septicLocal (with conditions)

    On-site sewage systems inside Hancock Township, administered by the Western Upper Peninsula Health Department.

    • A township may not issue a building permit for premises requiring sewage service before Health Officer permission.
    “The Environmental Health Division is responsible for evaluating proposed building sites and issuing construction permits for sewage systems.”
  • Septic permitRequired

    New or replacement on-site sewage systems inside Hancock Township.

    • A site evaluation must first deem the parcel suitable.
    • A complete application must be approved and appropriate fees paid before construction begins.
    “Once a complete application has been submitted, approved, and the appropriate fees paid, construction of the system can begin.”
  • Septic inspectionRequired

    Newly completed septic systems inside Hancock Township.

    • The installer initiates the final inspection.
    • The system may be covered only after final approval and an approved tag.
    “After a septic system is completed, the installer will contact the health department to initiate a final inspection.”
  • Well permitRequired

    Private wells serving family dwellings or small businesses inside Hancock Township.

    • A permit must be obtained before installation.
    • Registered well drillers must comply with Michigan's Water Well Construction and Pump Installation Code.
    • The health department states that fees are doubled if installation occurs before permit issuance.
    “Once a permit is obtained, an applicant may enlist a registered well driller to install the well.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Hancock Township or Houghton County directly.

  • Owner-builder exemption — Owner-builder licensing or permit exemption inside Hancock Township.
  • Off-grid sanitation — Off-grid sanitation, including privies or composting toilets, inside Hancock Township.
  • Mandatory utility hookup — Whether a new home inside Hancock Township must connect to public water or sewer when available.
  • Agricultural exemption — Agricultural construction exemption inside Hancock Township.
  • Short-term rentals — Short-term rental use inside Hancock Township.

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Hancock Township publishes no rule on the point, not that none exists. Houghton County’s page lists the county offices to call.

← All of Houghton County: county rules, score and offices