The Village of Bellevue, Michigan generally requires village zoning approval before construction and a building permit from Eaton County Construction Codes where the construction code requires one.1 Bellevue, in Eaton County, administers its own zoning.2 New public water and sewer connections are mandatory when capacity is available; eligible private sewage systems require Barry-Eaton District Health Department approval.34
At a glance
- Building permits
- Eaton County Construction Codes; required where the construction code applies1
- Zoning approval
- Village zoning permit generally comes before construction21
- Water and sewer
- New public connections mandatory when capacity is available3
- Septic permits
- Barry-Eaton District Health Department, where municipal wastewater is unavailable4
- AG lot size
- 36,300 square feet minimum in the AG Agricultural District5
- Owner-builder
- Own-use licensing exemption does not remove building-permit or zoning requirements6
Who to call
Zoning
Village of Bellevue Zoning Administrator
Village zoning compliance permits and planning questions
201 N. Main St. Bellevue, MI 49021
Building permits
Eaton County Department of Construction Codes
Construction-code building permits and inspections for Bellevue village
1045 Independence Boulevard Room 150 Charlotte MI 48813
Septic permits
Barry-Eaton District Health Department — Eaton County Office
Eligible on-site sewage systems: site evaluation, septic permits and final review
1033 Health Care Dr. Charlotte, Michigan 48813
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Village of Bellevue means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in the Village of Bellevue, MI?
Bellevue generally requires a Village zoning permit before grading, excavation or construction, followed by a building permit where the construction code requires one.1 Eaton County Construction Codes enforces the construction codes inside Bellevue village; the Village Zoning Administrator handles zoning compliance.17 Treat those as separate approvals when planning a home or addition.1 Agricultural buildings on a farm in Bellevue’s AG District have a zoning-permit exemption, but that exemption does not necessarily remove building-permit or other construction-code requirements.8 Michigan’s owner-builder exemption concerns licensing for construction on the owner’s property for the owner’s own use and occupancy; building permits, inspections and zoning requirements still apply.6
Who handles Bellevue building permits and zoning approval?
For Bellevue zoning compliance permits and planning questions, contact the Village Zoning Administrator at (269) 763-9571 or [email protected].7 For Bellevue building-code inspections, call Eaton County Construction Codes at 517-543-3004 and provide your name, phone number, permit number or job-site address, and the inspection type.9 Complete zoning applications for a single-family or two-family dwelling, or an associated accessory structure or use, must be acted upon within 15 days.10 That period starts with a complete application, which must include required county, state and federal applications and permits.10 Village zoning fees are paid before processing and are set by the Village Council; ask the Zoning Administrator for the current amount.11
Does the Village of Bellevue have zoning, lot sizes and setbacks?
Bellevue has its own zoning ordinance and district-specific development standards.212 In Bellevue’s AG Agricultural District, the minimum lot area for single-family development is 36,300 square feet; minimum yards are 65 feet in front, 20 feet on each side and 35 feet at the rear.513 Maximum AG lot coverage is 35%, and dwellings and non-farm buildings have a maximum height of 3 stories and 35 feet.1415 Bellevue’s schedule summarizes basic standards, so the applicable district regulations and other ordinance provisions must also be consulted.12 Ask the Village Zoning Administrator to identify the parcel’s district before using the AG standards to design a site plan.712
How do septic permits and water connections work inside Bellevue?
Bellevue requires new public sewer and water connections when capacity is available, so a private well or septic proposal must first account for the Village’s utility-connection rules.3 Qualifying approved private sewage systems existing at the ordinance’s stated date or at annexation have conditional protection until prolonged nonoperation or substantial failure, subject to available public capacity.16 Where municipal wastewater is unavailable, Barry-Eaton District Health Department must evaluate the site and issue a septic permit before installation, then perform final review.417 BEDHD also evaluates and permits installation of private drinking-water wells and requires final review.18 Eaton County’s soil figures show only 0.2% rated not limited for conventional drain fields; that countywide figure supports obtaining a parcel-specific evaluation, not assuming septic is impossible in Bellevue.19
Can you live in an RV or tiny home in the Village of Bellevue?
We could not confirm Bellevue’s rules for occupying an RV on private land, temporary camping, tiny-home occupancy, accessory dwellings or minimum dwelling floor area; ask the Village Zoning Administrator about the proposed use and parcel before buying.7 Bellevue’s zoning approval and construction-code requirements still need to be addressed for a proposed dwelling.1 Bellevue prohibits occupying a structure or use, in whole or in part, before receiving an occupancy permit from the Building Inspector under the construction code.20 A small footprint therefore does not by itself answer whether a home can be occupied legally.201 Ask separately about public water and sewer availability, because new connections are mandatory when capacity is available.3
Building a home in Bellevue: what are the steps, in order?
- Ask the Village Zoning Administrator to confirm the zoning district, proposed use and applicable site standards.712
- Resolve Bellevue’s public water and sewer connection requirements; if private systems are eligible, obtain BEDHD’s site evaluation and required septic or well approval.3418
- Submit the complete Village zoning application and advance zoning fees, including required outside-agency applications and permits.1011
- Obtain the required construction-code building permit through Eaton County Construction Codes before starting work, and arrange required inspections as construction proceeds.121
- Obtain the occupancy permit before moving in; buildings served by a well or septic system also need documented final health-department approval.20
For land outside village limits, use the Eaton County guide and confirm the applicable local zoning authority rather than extending Bellevue’s ordinance to another jurisdiction.22
Watch-outs
- Bellevue’s agricultural zoning-permit exemption applies to agricultural buildings on a farm in the AG District; confirm construction-code requirements separately with Eaton County Construction Codes.8
- Eaton County announced changes to select construction-code permit fees effective October 1, 2026; request the current schedule before budgeting a Bellevue project.9
- We could not confirm Bellevue’s driveway-approval or local flood-hazard requirements; ask the Village Zoning Administrator about the parcel before committing to a site layout.7
Sources
- ecode360.com (Village of Bellevue), quoted and re-checked
- Chapter 155: Zoning (Village of Bellevue), quoted and re-checked
- Chapter 117: Sewers (Village of Bellevue), quoted and re-checked
- On-Site Sewage Systems, quoted and re-checked
- Article XV: Schedule of Regulations (Village of Bellevue), quoted and re-checked
- Frequently Asked Questions – Residential Builder (Michigan statewide rule), quoted and re-checked
- Village of Bellevue Zoning Administrator (bellevuemi.net)
- ecode360.com (Village of Bellevue), quoted and re-checked
- Eaton County Department of Construction Codes (eatoncounty.org)
- ecode360.com (Village of Bellevue), quoted and re-checked
- Article XXIV: Administration (Village of Bellevue), quoted and re-checked
- Article XV: Schedule of Regulations (Village of Bellevue), quoted and re-checked
- Article XV: Schedule of Regulations (Village of Bellevue), quoted and re-checked
- Article XV: Schedule of Regulations (Village of Bellevue), quoted and re-checked
- Article XV: Schedule of Regulations (Village of Bellevue), quoted and re-checked
- ecode360.com (Village of Bellevue), quoted and re-checked
- On-Site Sewage Systems, quoted and re-checked
- On-Site Drinking Water Wells, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- ecode360.com (Village of Bellevue), quoted and re-checked
- ecode360.com (Village of Bellevue), quoted and re-checked
- Jurisdiction, quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.