Building permits, zoning and land rules in Barry County, Michigan

55Index Score / 100
#67 of 83 in Michigan

Barry County, Michigan requires building permits for construction; ordinary repairs are exempt within stated limits1. Professional Code Inspection (PCI) is the county’s contact for building, electrical, plumbing and mechanical permits2. Zoning varies by township and municipality, so ask Barry County Planning & Zoning which ordinance controls the parcel3,4. Barry-Eaton District Health Department issues septic and well permits; where public water is unavailable, well-construction approval must precede the building permit and construction5,6.

Do you need a building permit in Barry County, Michigan?

Yes.

Yes. Before constructing a building or structure in Barry County, the owner or the owner's representative must apply to the appropriate enforcing agency; a permit is also required for a change in use or occupancy1. Ordinary repairs do not require a permit, but structural changes, egress changes and work affecting public health or general safety fall outside that exception1. The Michigan Building Code and Michigan Residential Code govern applicable construction, including residential provisions for one- and two-family dwellings1. Starting work without the required permit triggers a penalty fee2. Michigan’s owner-builder licensing exemption is available to a person building a residential structure on that person’s property for personal use and occupancy; the exemption does not waive building permits10. The agricultural exemption confirmed here is narrow: it covers shade-cloth structures for nursery or agricultural purposes, excludes service systems and does not override other codes or ordinances11.

Who issues building permits in Barry County, and how do you reach them?

Barry County directs building, electrical, plumbing and mechanical permit questions to Professional Code Inspection (PCI) at 269-948-4088; ask PCI for project-specific forms, fees and inspection scheduling.

Barry County directs building, electrical, plumbing and mechanical permit questions to Professional Code Inspection (PCI) at 269-948-4088; ask PCI for project-specific forms, fees and inspection scheduling2. For zoning approval, contact Barry County Planning & Zoning at 220 W. State St., Hastings, MI 49058, phone (269) 945-12904. In Yankee Springs Township, township residential site-plan review applies to covered projects, and an exemption from that review does not remove a building-permit requirement12. Septic permitting stays with Barry-Eaton District Health Department throughout Barry County, including cities, villages and townships5. Barry-Eaton also evaluates well sites, issues well permits and inspects completed wells6.

Does Barry County have zoning?

Barry County maintains a zoning ordinance, but coverage varies by local government.

Barry County maintains a zoning ordinance, but coverage varies by local government3. Middleville and Yankee Springs Township administer their own zoning13,14. Septic and well permits remain with Barry-Eaton District Health Department5,6. The Village of Nashville states that it has been under Barry County Planning & Zoning since March 1, 2024; the Hastings Area Overlay coordinates zoning among the county and participating local governments3. For unincorporated land, ask Planning & Zoning whether the county ordinance governs the parcel; we could not confirm every township’s arrangement3,4. Where the county ordinance applies, Rural Residential allows a single-family dwelling, farm and farm operation, with a 1-acre lot and 150-foot width without sewer8. RR front and side setbacks are 50 and 20 feet respectively3. Minimum lot area varies by district: CR requires 20 acres, while RL lists 12,000 square feet without sewer3. The ordinance states a 720-square-foot dwelling minimum and a 24-by-24-foot core living area8. Confirm operative standards with Planning & Zoning because a 2026 revision is posted as a draft15.

How do septic and well permits work in Barry County?

Barry-Eaton District Health Department evaluates a Barry County septic site first; after a suitable evaluation, submit the sewage-permit application and fee so a sanitarian can authorize construction.

Barry-Eaton District Health Department evaluates a Barry County septic site first; after a suitable evaluation, submit the sewage-permit application and fee so a sanitarian can authorize construction7. Alternative septic systems have additional standards, and some require certified installers7. Only about 0.5% of Barry County soils rate free of severe limitations for a conventional septic drain field, so obtain the evaluation before fixing the house location16. Barry-Eaton’s 2022 paperwork lists $283 for a vacant-land evaluation, $253 for an initial conventional sewage permit and $614 for an initial low-pressure dose mound permit; ask Environmental Health for current fees17. Request inspection after tanks, sewers and distribution lines are placed, before covering or operating the distribution system; the code provides for inspection within 2 working days of notification5. Backfill within 48 hours after approval unless the Health Officer approves otherwise5. Public sewer available within 200 feet of the structure requires connection5. Barry-Eaton well permits cover new systems and extensive changes, expire within 1 year and are not transferable; where public water is unavailable, well approval must precede the building permit and construction6.

Can you live in an RV or tiny home on your land in Barry County?

Barry County's ordinance text generally bars an RV or trailer as a principal or seasonal dwelling where that ordinance applies, while allowing specified temporary exceptions.

Barry County's ordinance text generally bars an RV or trailer as a principal or seasonal dwelling where that ordinance applies, while allowing specified temporary exceptions8. One exception allows temporary quarters during construction under a permit lasting 6 months and renewable in 6-month terms with administrator approval8. The ordinance also describes temporary use of no more than 1 recreational unit per parcel and requires 7 feet of clear space around a temporary dwelling8. We could not confirm a single countywide RV or camping rule for every township and municipality, so ask Planning & Zoning which ordinance controls the parcel4,18. A tiny house is not automatically treated as an RV under Michigan guidance, and applicable local zoning, building, electrical and plumbing approvals still matter19. Off-grid does not mean sanitation-free: an approved onsite system is required where municipal wastewater is unavailable, while public sewer must be used when available within 200 feet of the structure5,7.

How do you build a home in Barry County, step by step?

Ask Barry County Planning & Zoning which authority, ordinance and district govern the parcel.

  1. Ask Barry County Planning & Zoning which authority, ordinance and district govern the parcel3,4.
  2. Have Barry-Eaton evaluate the septic site, then submit the sewage-permit application and fee for construction authorization7.
  3. Obtain Barry-Eaton well-construction approval where public water is unavailable before the building permit or construction; obtain the well permit before installation6.
  4. Call PCI at 269-948-4088 for building, electrical, plumbing and mechanical applications, fees and inspection scheduling2.
  5. Request Barry-Eaton’s septic inspection before covering or operating the distribution system, and arrange final inspection of the completed well5,6.
  6. After permitted work is complete and finaled and applicable fees are paid, request the certificate of occupancy in writing before moving in20.

What should you check before you buy land in Barry County?

About 89% of Barry County land sits at 15% slope or less, and just under half is wooded; these countywide figures do not establish the buildability of a particular parcel.

About 89% of Barry County land sits at 15% slope or less, and just under half is wooded; these countywide figures do not establish the buildability of a particular parcel16. Soils are the main caveat: with only about 0.5% rated free of severe limitations for a conventional septic drain field, budget for a site evaluation and the possibility of an engineered system16. Ask whether a larger development needs Drain Commissioner review: the county's stormwater standards cover plats and several other development types, including sites disturbing at least 1 acre, but exempt individual one- and two-family homes and modifications to them21. At about 115.4 people per square mile, Barry County is rural, and the county center is about 31 miles in a straight line from the nearest city of 100,000 or more people16. Typical property tax runs about 1.1% effectively, with a median bill near $2,706 a year, while farmland has recently valued around $6,027 an acre16.

Watch-outs

  • Barry County has posted a 2026 draft rewrite of its zoning ordinance; confirm with Planning & Zoning whether it has been adopted before relying on the district standards in this guide for your parcel15.
  • Where public water is unavailable in Barry County, obtain Barry-Eaton well-construction approval before the building permit or construction; the well permit is not transferable to a buyer6.
  • With only about 0.5% of Barry County's soils rating free of severe limitations for a conventional septic drain field, most rural parcels should budget for a Barry-Eaton site evaluation and the possibility of an engineered system before assuming a standard drain field will work16.

Sources

21 official pages, each quoted and re-checked · written October 11, 2026

  1. Building Permit Information
  2. Zoning Ordinance & Amendments
  3. Barry County Zoning Ordinance
  4. Barry County Planning & Zoning Department (barrycounty.org)
  5. On-Site Sewage Systems
  6. Barry-Eaton District Health Department Sanitary Code — Water Supply
  7. On-Site Sewage Systems
  8. Barry County Zoning Ordinance (adopted July 25, 2008, as amended) (barrycounty.org)
  9. michigan.gov
  10. Frequently Asked Questions – Residential Builder
  11. R 408.30409 Permits. Work exempt from permit.
  12. Yankee Springs Township: Yankee Springs Township Zoning Ordinance, Sec. 5.6—Residential Site Plan Review (Barry County)
  13. Village of Middleville: Middleville Code, Sec. 78-83—Uses and dimensional standards (Barry County)
  14. Yankee Springs Township: Yankee Springs Township Zoning Ordinance, Sec. 1.2—Purpose (Barry County)
  15. Barry County Zoning Ordinance & Amendments document center (barrycounty.org)
  16. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  17. Barry-Eaton District Health Department, Environmental Health Division (barryeatonhealth.org)
  18. Michigan Zoning Enabling Act (Michigan statewide rule)
  19. michigan.gov (Michigan statewide rule)
  20. Certificate of Occupancy Request (Michigan statewide rule)
  21. Barry County Drain Commissioner Rules

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

Compared with neighboring counties

Unlike 4 of its 6 neighbors, Barry County has countywide zoning.

RuleBarry CountyEaton CountyKalamazoo CountyIonia CountyCalhoun CountyAllegan CountyKent County
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningYesNoNoNoYesYesNo
Septic permitsBarry-Eaton District Health Dept.Barry-Eaton District Health Dept.County Health & Community ServicesCounty Health Dept.County Public Health Dept.County Health Dept.County Health Dept.

County locator

Barry County in Michigan

55
County map
Barry County highlighted among the Michigan counties · colored by Index score

How Barry County scores

55 / 100 · #67 of 83 in Michigan · six factors, land price, tax, rain and climate

Seclusion20100% ev.
Self-Sufficiency72100% ev.
Admin Boringness4190% ev.
Durability83100% ev.
Property Autonomy77100% ev.
Carry Cost72100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$307kTypical home
1.1%Property tax
$6,027Land / acre
37.7"Annual rain
1.3% of yrsSevere drought
2.3 / yr (+2.3)Mid-century 100°F days
11.5 daysMid-century dry spell
1.55" (+7.2%)Mid-century 1-day rain
1.65×Wildfire change factor
100%Forward climate coverage
$1,177Home insurance / yr
0.2% / yrInsurance growth
0.74%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
217,313People within 30 min
5,622,260People within 2 hr
98,415Radius comparison (15 mi)
115.4People / sq mi
0.2%Federal land
89.2%Land at 15% slope or less
0.5%Soils rated "not limited" for septic (strict USDA rating)
1,532 acWorkable land screen
48.9%Wooded land
55.6 tonsBiomass / forest ac
48.2°FAvg temp

Scout Barry County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Barry County. Listing sites control their own results and filters.

Sell land in Barry County? Be the only seller on this page →

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Barry County

Inside a city, town or township here, that government usually sets zoning and may issue its own building permits; the county’s rules above cover land outside them.

Not yet covered: Assyria Township · Baltimore Township · Barry Township · Carlton Township · Castleton Township · Irving Township · Johnstown Township · Maple Grove Township · Village of Nashville · Orangeville Township · Prairieville Township · Woodland Township · Village of Woodland

Answers from the rulebook for Barry County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Barry County rules

  • County-wide zoningPresent (with conditions)

    Barry County Zoning Ordinance and its zoning districts

    • The ordinance has been amended many times (2009-2024 amendments listed) and a 2026 draft and 2026 amendment A-1-2026 are listed; the 2008 text may be superseded in parts.
    • Which townships are actually under the county ordinance versus their own township zoning was not verified.
    “all dwellings constructed shall have a minimum square footage and minimum width required in each respective zoning district.”
  • Local zoningVaries (with conditions)

    The countywide aggregate of zoning administration across Barry County, including county-administered areas and municipalities or local units with their own or county-administered zoning arrangements.

    • The Barry County Zoning Ordinance expressly contemplates that a local unit may elect to bring some or all of its jurisdiction under the county ordinance, so coverage is not uniform by default.
    • The Hastings Area Overlay District coordinates zoning among Barry County, Rutland Charter Township, Hastings Charter Township, Carlton Township, and the City of Hastings; the ordinance states that permitted land uses may be substantially consistent but not identical within each municipality.
    • The Village of Nashville publicly states that, as of March 1, 2024, it is under Barry County Planning and Zoning.
    • This aggregate claim does not state that Barry County administers every local ordinance or every municipality's zoning.

    Village of Nashville transition to Barry County Planning and Zoning: 2024-03-01 · Hastings Area Overlay residential density: 4 units per acre approximately (The ordinance states the density must be served by public water and sanitary sewer.)

    “Permitted land uses will be substantially consistent but not identical within each municipality.”
    One more reviewed finding on this topic
    • Present (with conditions) — Barry County's locally administered zoning framework, as evidenced by the county's official zoning-ordinance document center.
      “Barry County Zoning Ordinance & Amendments 32 documents Barry County Zoning Ordinance 2026 DRAFT document seq 0.00 2026 Amendment A-1-2026 document seq 0.00 Barry County Zoning Ordinance document seq 1.00”
  • Zoning districtsPublished (with conditions)

    Publication of Barry County zoning ordinance materials and amendments.

    • The official county page lists the adopted ordinance, a 2026 draft, and multiple amendments.
    • The underlying ordinance text and district schedule were not accessible in this research, so specific district names and dimensional values are not asserted.
    “Barry County Zoning Ordinance & Amendments 32 documents”
  • Minimum dwelling sizeDistrict specific (with conditions)

    Dwellings in CR, NLR, RL, RR, LDR, MDR and A districts (720 sq ft)

    • Also requires a minimum core living area of at least 24 by 24 feet
    • HDR and MU districts have a lower 600 sq ft minimum (see separate claim)
    • 2008 text; amendments not read

    minimum floor area: >= 720 square feet (600 sq ft in HDR and MU districts)

    “minimum floor area. all dwellings shall contain a minimum of seven hundred-twenty (720) square feet of floor area and a minimum core area of living space measuring at least twenty-four (24) by twenty-four (24) feet.”
    One more reviewed finding on this topic
    • District specific (with conditions) — Dwellings in HDR High Density Residential and MU Mixed Use districts (600 sq ft)
      “minimum floor area. all dwellings shall contain a minimum of six hundred (600) square feet of floor area and a minimum core area of living space measuring at least twenty-four (24) by twenty-four (24) feet.”
  • Minimum lot sizeDistrict specific (with conditions)

    Minimum lot area for residential and other uses in Barry County zoning districts.

    • Minimum lot area varies by district, sewer availability, dwelling-unit count, and Transferable Development Credit status.
    • Recorded lots existing as of the ordinance effective date may be usable despite lot-area and width nonconformity if other ordinance requirements are met, including approved water and sewage disposal.

    CR minimum lot area: 20 acres · RL minimum lot area without sewer: 12000 square feet (8,250 square feet with sewer) · RR minimum lot area: 1 acre · LDR one-unit minimum lot area: 7,200-12,000 square feet (Depends on sewer and Transferable Development Credits)

    “The minimum lot area in RL Recreational Lakes District shall be twelve thousand (12,000) square feet in areas not served with a sewer system, and eight thousand two hundred fifty (8,250) square feet in areas served by a sewer system.”
  • SetbacksDistrict specific (with conditions)

    Structures and dwellings subject to the Barry County Zoning Ordinance's zoning districts.

    • Setbacks vary by zoning district and, in some districts, by waterfront status, sewer availability, and other district conditions.
    • Required setbacks are measured to the foundation or applicable projecting portion; eaves may extend into the required setback area no more than two feet.
    • No structure may be placed within a required setback area.
    • Waterfront districts may impose separate rear/waterfront setbacks.

    CR front setback: 50 feet · CR side setback: 20 feet · CR rear/waterfront setback: 20/50 feet · RL front setback: 30 feet · RL side setback: 10 feet · RL rear/waterfront setback: 20/30 feet · RR front setback: 50 feet · RR side setback: 20 feet · RR rear/waterfront setback: 20/30 feet · LDR front setback: 35 feet · LDR side setback: 10 feet · LDR rear/waterfront setback: 20/NA feet

    “SETBACKS (IN FEET) BUILDING HEIGHT (IN FEET) ♦ Front 30 ♦ Max 45 ♦ Side 10 ♦ Rear/Waterfront 20/30”
  • Living in an RVTemporary only (with conditions)

    Use of a recreational unit for lodging or housekeeping on a parcel under the county zoning ordinance

    • Not more than one recreational unit per parcel
    • Must comply with setback requirements
    • Must not be contrary to public health, safety or welfare
    • Must be connected to a water supply and sewer disposal system approved by the Barry-Eaton health department
    • Must have a clear unoccupied space of at least 7 feet on all sides
    • Alternatively as part of a state-licensed campground (more than five units)
    • Temporary dwelling or trailer permit while building permanent dwelling is limited to six months, renewable for up to six months at a time

    recreational units per parcel: <= 1 unit · clear space around unit: >= 7 feet

    “as a temporary condition, not more than one (1) recreational unit per parcel may be used for lodging or housekeeping purposes as authorized by applicable barry county general law ordinance, and subject to the following conditions:”
  • Who permits septicLocal

    On-site sewage systems in Barry County within the Barry-Eaton District Health Department service area.

    • BEDHD evaluates the site before issuing the permit.
    • The system must receive final review and approval before it is covered.
    “Before a resident installs a sewage system, BEDHD must evaluate the site and issue a permit”
    2 more reviewed findings on this topic
    • Local — On-site sewage systems in Barry County within the Barry-Eaton District Health Department service area.
      “Before a resident installs a sewage system, BEDHD must evaluate the site and issue a permit, as well as do a final review once the system is installed.”
    • Local (with conditions) — On-site sewage systems in Barry County served by the Barry-Eaton District Health Department.
      “This code shall apply and be enforced throughout Barry and Eaton Counties. The Health Officer shall have jurisdiction throughout all of Barry and Eaton Counties, including all cities, villages and townships, in the administration and enforcement of this code and amendments hereafter adopted unless otherwise specifically stated.”
  • Septic permitRequired

    Installation of an on-site sewage system in Barry County within the Barry-Eaton District Health Department service area.

    • BEDHD must evaluate the site before installation.
    • A sewage-system permit must be issued before installation.
    • A final review is required after the system is installed.
    • The site-evaluation process applies to parcels without available municipal wastewater service; the source states that public-sewer availability is considered.
    • The application requires payment of the appropriate fee before construction authorization.
    “BEDHD must evaluate the site and issue a permit, as well as do a final review once the system is installed.”
    2 more reviewed findings on this topic
    • Required — Construction, alteration, extension, or replacement of an individual sewage disposal system in Barry County.
      “No person, firm, company, or corporation shall construct, alter, extend, or replace or cause construction, alteration, extensions, or replacements of any individual sewage disposal system unless he has first obtained a permit issued by the Health Officer.”
    • Required — Construction or installation of an on-site sewage system in Barry County.
      “If the results of the site evaluation allow for the parcel to be developed, the next step in the process is to apply for a sewage system permit. Once the application has been submitted and the appropriate fee is paid, the system’s construction can be authorized by one of our sanitarians. To obtain a sewage system permit, visit our "Forms" to the right. Final Inspection Final inspections are performed on newly installed systems after BEDHD is notified by the owner or contractor that the sewage system has been completed.”
  • Septic inspectionRequired

    Newly installed on-site sewage systems in Barry County.

    • Inspection must occur after septic tanks, sewers, and distribution tile lines are placed but before the distribution system is covered or put into operation.
    • The applicant or contractor must request the inspection.
    • The system must not remain open longer than 48 hours after approval for backfill unless otherwise approved.
    • Failure to construct according to permit specifications is a violation.

    inspection timing: <= 2 working days (The inspection will be made within two working days after notification that the system is ready.) · maximum open period after backfill approval: <= 48 hours (Unless otherwise approved by the Health Officer.)

    “request for an inspection shall be made to the Health Officer.”
    2 more reviewed findings on this topic
    • Required — Newly installed on-site sewage systems in Barry County.
      “Final inspections are performed on newly installed systems”
    • Required — Final inspection of septic systems in Barry County.
      “After construction of the sewage disposal system has been completed to the extent of the placement of all septic tank(s), sewers, and distribution tile lines, and before any portion of the distribution tile system has been covered or placed in operation, request for an inspection shall be made to the Health Officer. The inspection will be made within two (2) working days after notification of the Health Officer that the system is ready for inspection.”
  • Off-grid sanitationAllowed (with conditions)

    On-site sewage sanitation for premises not connected to public sewer in Barry County.

    • An approved individual sewage disposal system is required.
    • Public sewer connection is required when available within 200 feet.
    • Surface discharge to the ground, water bodies, drains, ditches, or storm sewers is prohibited.
    • The premises must have an adequate sewage disposal system before occupancy.

    public sewer connection threshold: <= 200 feet

    “does not have municipal wastewater services (city sewer) available can be considered for an on-site sewage system.”
  • Well permitRequired

    Installation of a drinking-water well in Barry County within the Barry-Eaton District Health Department service area.

    • BEDHD must evaluate the site before installation.
    • A well permit must be applied for and issued before installation.
    • The application requires payment of the appropriate fee.
    • A final inspection is required after drilling and completion.
    • If a parcel has an existing well, the old well must be plugged.
    • The well system must comply with state and local requirements.
    “Before a resident or business installs a well, BEDHD must evaluate the site and issue a permit”
    One more reviewed finding on this topic
  • Mandatory utility hookupSewer (with conditions)

    Premises served by public sewer in the Barry-Eaton Health Department district.

    • Facilities generating sewage must connect to an individual sewage disposal system unless public sewer is available within 200 feet.
    • Where public sewer is available, the sewage facilities must connect to that public sewer.
    • The rule is under the Barry-Eaton sanitary code and includes the statutory reference to Act 288 of 1978.

    public sewer availability threshold: <= 200 feet

    “public sewer is available within 200 feet from the structure”
    One more reviewed finding on this topic
  • Subdividing landRegulated (with conditions)

    Plats and other listed development types in Barry County subject to Barry County Drain Commissioner review under the county's site-development rules.

    • The rules apply to plats, mobile-home communities with public streets, site condominiums with county drains, sites discharging directly into a county drain, sites disturbing at least one acre, and other private developments requiring site-plan review at a municipality's request.
    • A preliminary plat and final plat are required by statute under the cited procedures.
    • Developments entirely within a municipality retaining stormwater review authority follow that municipality's procedures.
    • Individual single- and two-family residential structures and additions or modifications to existing single- and two-family residential structures are exempt from these stormwater standards.
    • The rules are minimum standards and do not limit a municipality's authority to adopt or enforce higher standards.

    preliminary plat and final plat: 2 filings (required by statute for plat procedures) · Drain Commissioner subdivision review fee: 1200 USD (additional submittals and reviews billed at $300 per review; additional costs billed before final approval)

    “These standards apply to private and public development projects. The following types of developments shall be subject to review under these standards:”
  • Permit processPartial

    County planning, zoning, land-division, and related permit processes.

    • The county page identifies application categories for soil erosion, zoning, and land-division permits.
    • The building page directs applicants to Professional Code Inspection for building, electrical, plumbing, and mechanical permits.
    • Specific application forms, review timelines, and complete fee schedules were not available on the reviewed pages.
    “For any building, electrical, plumbing and/or mechanical permits, or questions related to those permits please contact (PCI) Professional Code Inspection”
    One more reviewed finding on this topic
    • Partial — Building, electrical, plumbing, and mechanical permit inquiries in Barry County.
      “please contact (PCI) Professional Code Inspection at: 269-948-4088”

Michigan rules that apply here

  • Building permitRequired

    Construction of a building or structure in Michigan, subject to exceptions in the Michigan construction code.

    • The owner, or the owner's builder, architect, engineer, or agent, must submit a written application to the appropriate enforcing agency before construction.
    • The application must use the commission-prescribed form, include the established enforcing-agency fee, contain a detailed affidavit-verified statement of specifications, include complete scaled plans, and include a site plan showing dimensions and locations of proposed and existing buildings or structures on the premises.
    • The act states 'Except as otherwise provided in the code'; specific exemptions require separate verification.
    “Except as otherwise provided in the code, before construction of a building or structure, the owner, or the owner's builder, architect, engineer, or agent, shall submit an application in writing to the appropriate enforcing agency for a building permit.”
    2 more reviewed findings on this topic
    • Required — Construction of a building or structure and changes in use or occupancy in Barry County.
      “Before construction of a building or structure, an owner, or the owner's builder, architect, engineer, or agent, shall submit an application”
    • Required — Construction of a building or structure and changes in use or occupancy in Barry County under Michigan construction-code enforcement.
      “shall submit an application in writing to the appropriate enforcing agency for a building permit.”
  • Owner-builder exemptionConditional

    Michigan residential-builder licensure for an owner constructing a residential structure on the owner's property for the owner's own use and occupancy, including Barry County.

    • The exemption concerns residential-builder licensure; it does not eliminate applicable building-permit requirements.
    • The official Michigan FAQ states that the own-use and occupancy exception is part of the statutory definition and licensing rules.
    • Other licensing-law exceptions and conditions may apply.
    “except for the person's own use and occupancy on the person's property.”
    2 more reviewed findings on this topic
    • Available — Michigan residential-builder licensing for a person constructing a residential structure for the person's own use and occupancy on the person's property, including Barry County.
      “or a person who erects a residential structure or combination residential and commercial structure except for the person's own use and occupancy on the person's property.”
    • Available (with conditions) — Michigan residential-builder licensing when an individual erects a residential structure or combination residential and commercial structure for the individual's own use and occupancy on the individual's property.
      “or a person who erects a residential structure or combination residential and commercial structure except for the person's own use and occupancy on the person's property.”
  • Building code adoptedAdopted (with conditions)

    Construction, alteration, relocation, demolition, use, and occupancy of buildings and structures statewide in Michigan, including residential requirements administered under the Michigan Residential Code.

    • The current Michigan Building Code is the 2021 edition and is effective April 9, 2025.
    • The rule adopts the International Building Code by reference with Michigan amendments and exceptions.
    • The adopted rule excludes sections 104.2, 104.3, 104.8, 104.8.1, 104.10, 105.3, 105.3.1, 105.3.2, 105.6, 109.2 to 109.6, 111.2, 111.3, 113.2, 113.3, 113.4, 114.1, 114.2, 114.3, 114.4, 115.1 to 115.4, 423.5, 423.5.1, 423.5.2, 903.2.8.4, 2902 to 2902.6, Table 2902.1, section 3005.5, the definition of agricultural building in section 202, and the definition of recreational vehicle in Appendix G.
    • The rule also incorporates IECC 2021, IEBC 2021, IMC 2021, IPC 2021, IPSDC 2021, and NFPA 70 2023 as listed in chapter 35.
    • Residential requirements are contained in the Michigan Residential Code.
    • The code may be purchased from the International Code Council through the bureau website at a cost of $144.00 as of the time of adoption of the amendatory rules.

    building code edition: 2021 Michigan Building Code (Michigan amendments and listed exceptions apply) · effective date: 2025-04-09

    “The provisions of the international building code, 2021 edition, including appendices F, G, and H, except for [...] govern the construction, alteration, relocation, demolition, use, and occupancy of buildings and structures, and, with exceptions noted, the international building code is adopted by reference in these rules.”
    2 more reviewed findings on this topic
    • Adopted — Michigan Building Code and Michigan Residential Code applicable in Barry County.
      “The Michigan Building Code controls all matters concerning the construction”
    • Adopted (with conditions) — Michigan Building Code and Michigan Residential Code, including construction in Barry County subject to the appropriate enforcing agency.
      “The Michigan Building Code controls all matters concerning the construction”
  • InspectionsRequired

    All construction undertaken pursuant to a building permit issued by an enforcing agency in Michigan.

    • The enforcing agency must periodically inspect the permitted construction.
    • Inspections are to ensure that construction complies with building-permit conditions, the code, and other applicable laws and ordinances.
    • The cited rule concerns construction undertaken pursuant to a building permit issued by the enforcing agency; it does not establish an inspection requirement for work exempt from permitting.
    • Inspection administration may be performed by the state or by a local enforcing agency according to the applicable jurisdictional assignment.

    inspection frequency: periodic

    “An enforcing agency shall periodically inspect all construction undertaken pursuant to a building permit issued by it to insure that the construction is performed in”
    One more reviewed finding on this topic
    • Required — All construction undertaken pursuant to a building permit issued by a Michigan enforcing agency.
      “An enforcing agency shall periodically inspect all construction undertaken pursuant to a building permit issued by it to insure that the construction is performed in accordance with conditions of the building permit and is consistent with requirements of the code and other applicable laws and ordinances.”
  • Certificate of occupancyRequired

    A new building or altered building subject to the Michigan construction code.

    • The building or altered building may not be used or occupied until the code official issues a Certificate of Occupancy.
    • The permit holder or authorized agent must submit a written request after project completion.
    • The request must include applicable building, electrical, mechanical, plumbing, boiler, elevator, plan-review, and school fire-services project numbers.
    • The certificate cannot be issued until all fees are paid, permits are finaled, and permitted work is completed in accordance with the permit, code, and applicable laws and ordinances.
    • If an electrical, mechanical, plumbing, boiler, elevator, plan-review, or Fire Services project is not required, the request must state “not applicable.”
    “A new building or a building that is altered shall not be used or occupied until a Certificate of Occupancy is issued by the code official.”
    One more reviewed finding on this topic
    • Required — Occupancy of buildings subject to the Michigan State Construction Code.
      “Occupying the building without a Certificate of Occupancy violates the State Construction Code Act, 1972 PA 230”
  • Agricultural exemptionConditional

    Michigan building-permit exemptions for specified agricultural-purpose shade-cloth structures.

    • The exemption is limited to shade-cloth structures constructed for nursery or agricultural purposes.
    • Service systems are excluded.
    • An exemption does not authorize work violating the code or other laws or ordinances.
    “Shade cloth structures constructed for nursery or agricultural purposes, not including service systems.”
    One more reviewed finding on this topic
    • Conditional — Building-permit exemption for shade cloth structures constructed for nursery or agricultural purposes under Michigan Building Code Part 4.
      “Exemptions from permit requirements of the code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of the code or any other laws or ordinances of this jurisdiction. Permits shall not be required for any of the following: [...] (x) Shade cloth structures constructed for nursery or agricultural purposes, not including service systems.”
  • Shed and accessory-building permit exemptionAvailable (with conditions)

    Building-permit exemption for one-story detached accessory structures regulated by the Michigan Residential Code for one- and two-family dwellings and townhouses.

    • The structure must be one-story and detached.
    • Floor area must not exceed 200 square feet (18.58 m²).
    • The exemption does not authorize work that violates the code or other laws or ordinances of the jurisdiction.

    maximum floor area for exempt detached accessory structure: <= 200 square feet (One-story detached accessory structures only; equivalent stated as 18.58 m².)

    “Building permits shall not be required for any of the following: (i) One-story detached accessory structures, if the floor area does not exceed 200 square feet (18.58 m²).”
  • Driveway accessRequired

    Commercial and residential driveways constructed or reconstructed within Michigan state highway right-of-way and access to state trunkline highways.

    • An individual permit application package must be submitted through CPS.
    • The package includes the Drainage Design Checklist for Accessing State Trunklines (Form 2484), traffic analysis if applicable, traffic impact study if applicable, and preliminary local planning commission review if appropriate.
    • A driveway constructed or reconstructed after August 6, 1969, is not lawful unless a permit has been obtained.
    • A commercial driveway permit application requires a bond; a residential driveway permit does not require a bond.
    • If accessing a state trunkline highway, the driveway permit is required in addition to the local governmental agency building permit.
    • If upgrading a driveway or only building a new driveway, a driveway permit may be all that is necessary.

    Driveway permit effective date threshold: 1969-08-06 (Driveways constructed or reconstructed after this date require a permit to be lawful) · Commercial driveway bond: true (Residential driveway permit does not require a bond)

    “Applicants must submit an individual permit application package through the Construction Permit System (CPS) with the following: Drainage Design Checklist For Accessing State Trunklines (Form 2484) Traffic Analysis, if applicable Traffic Impact Study, if applicable Preliminary review by the local planning commission, for compliance with local long-range development plans, if appropriate A driveway constructed or reconstructed after August 6, 1969, is not lawful unless a permit has been obtained.”
  • Building in a floodplainRequired

    Alteration or occupation of the 100-year floodplain of a Michigan river, stream, or drain regulated under Part 31.

    • The Part 31 permit requirement applies to rivers, streams, or drains with a drainage area of 2 square miles or greater.
    • A Part 31 EGLE permit is not required for alterations within floodplains of the Great Lakes, inland lakes, or watercourses with drainage areas less than 2 square miles, although other NREPA reviews may still be necessary.
    • Construction and fill may be permitted in non-floodway portions if local ordinances and building standards are met and compensating excavation is provided equal to the volume of fill placed in the floodplain.
    • New residential construction is specifically prohibited in the floodway.
    • The minimum residential elevation standard is one foot above the 100-year flood elevation, and some communities or counties may impose a higher standard.

    Minimum drainage area for Part 31 floodplain authority: >= 2 square miles (Part 31 does not apply below this threshold) · Lowest-floor elevation: >= 1 foot above 100-year flood elevation (Some communities and counties may require a higher elevation)

    “The Floodplain Regulatory Authority deals with the floodplains of rivers, streams, or drains which have a drainage area that is 2 square miles or greater. A permit is not required from EGLE, under Part 31, for alterations within the floodplains of the Great Lakes, inland lakes, or watercourses which have a drainage area less than 2 square miles.”
  • Permit feesVariable (with conditions)

    Applications for Michigan building permits under the State Construction Code Act, except where the code provides otherwise.

    • The application must be submitted to the appropriate enforcing agency.
    • The fee is established by the enforcing agency; Michigan law therefore does not establish one uniform statewide building-permit amount.
    • The statute permits additional permits for particular work, including plumbing and electrical, or other specified situations.
    “The application shall be on a form prescribed by the commission and shall be accompanied by payment of the fee established by the enforcing agency.”
  • Campground & park staysLimited

    Tiny houses, including tiny houses built on wheels, proposed as resort cabins or similar occupancy in Michigan.

    • The source distinguishes tiny houses from recreational units and states they cannot be treated as recreational units even if built on wheels.
    • The tiny house must be built as a resort rather than a campground.
    • Local health department permitting for wells, septic tanks, and drainfields is required as applicable.
    • Local zoning, building, electrical, and plumbing permits and final approvals are required under local authorities.
    • The source does not establish statewide zoning permission or a statewide right to occupy a tiny house.
    “Local zoning, building, electrical, plumbing permits and final approvals under local authorities.”
    5 more reviewed findings on this topic
    • Limited — RV occupancy as part of a Michigan campground consisting of five or more recreational units used for temporary living quarters.
      “requires a campground license when five or more recreational units (i.e., tents, campers, RVs) are placed on a parcel or tract of land”
    • Limited — Temporary camping in a Michigan temporary campground.
      “A temporary campground license issued by the local health department (LHD) having jurisdiction is required prior to operating a temporary campground.”
    • Limited — Occupancy of RVs and other recreational units as temporary living quarters in a Michigan campground offering sites to the public or members of an organization, where 5 or more recreational units are involved.
      “A campground owner shall ensure that a site is occupied by not more than 8 persons and by not more than 1 recreational unit.”
    • Limited — Operating a campground offering five or more campsites or recreational units, including temporary campground operations.
      “Part 125 of Michigan's Public Health Code, 1978 PA 368, as amended, and its administrative rules, establish the requirements for constructing, modifying, licensing, and operating a campground. A license from the Michigan Department of Environment, Great Lakes, and Energy (EGLE) is required to operate a campground offering five or more campsites/recreational units in the state of Michigan.”
    • Limited — Occupancy of a mobile home located in a seasonal mobile home park.
      “Mobile homes located in a seasonal mobile home park may be occupied on a full-time basis from April 1 to October 31, but shall not be occupied for more than 15 consecutive days in any 30-day period from November 1 to March 31.”
  • county building authorityGeneral

    Michigan counties serving as building-code enforcing agencies for residential construction in unincorporated areas, subject to the Statewide Jurisdiction List and local/state jurisdiction assignments.

    • Before construction, a written building-permit application must be submitted to the appropriate enforcing agency.
    • A permit is also required when use or occupancy changes.
    • Ordinary repairs do not require a permit, but the stated structural, egress, plumbing, electrical, mechanical, and public-health/safety limitations apply.
    • The Michigan Building Code and Michigan Residential Code govern construction; county enforcement applies only where the Statewide Jurisdiction List designates county jurisdiction.
    “If COUNTY is indicated, that unit of government receives code enforcement services from a county enforcing agency.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Lot coverage — Lot-coverage requirements in Barry County.
  • Building height — Building-height requirements in Barry County.
  • Camping on your land — Temporary camping on private land in Barry County.
  • Tiny homes — Tiny-home occupancy in Barry County.
  • Manufactured homes — Manufactured-home occupancy in Barry County.
2 more unanswered
  • Accessory dwellings
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Barry County, Michigan

Is Barry County a good place to live off-grid or homestead?

Barry County scores 55/100 on the Bolthole Index, a solid county profile. Its strengths: mixed durability signals and a stronger property-autonomy legal backdrop. Watch-outs: about 217,313 people within a 30-minute drive and more administrative friction around building and land use.

How much does land cost in Barry County, Michigan?

Land in Barry County runs about $6,027 per acre, based on the latest county data.

What is the water situation in Barry County?

Barry County gets about 37.7" of rain a year, with severe drought in roughly 1.3% of years.

How remote is Barry County?

A representative private-land location has about 217,313 people within a 30-minute drive and 5,622,260 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Barry compares in Michigan