The Town of Lisbon, Maine requires a building permit for new one- and two-family homes, additions and renovations, issued by the town's own code enforcement office1. Lisbon also has its own zoning, Chapter 70 of the town code2. Septic permits come from a Local Plumbing Inspector under state wastewater rules, not from Androscoggin County3.

At a glance

Building permit
Required for new 1 and 2 family homes, additions and renovations inside Lisbon1
Building code
State Maine Uniform Building and Energy Code (MUBEC), enforced by the town4
Zoning
Yes, Chapter 70 of the Lisbon Code, with aquifer protection and shoreland overlays2
Septic
State rules; the Local Plumbing Inspector examines applications and issues the permit53
Driveways
New entrances onto a public way need a town permit6
Tiny homes
State law requires towns to permit them where single-family homes are allowed7
Manufactured homes
Allowed on house lots where single-family homes are allowed; parks need town approval89

Who to call

Building permits

Town of Lisbon Code Enforcement

Building permits, zoning administration and code enforcement inside the Town of Lisbon

207-353-3000 ext. 108

300 Lisbon Street Lisbon , ME 04250

Septic permits

Maine CDC Subsurface Wastewater Program

State septic rules and forms; the local permit is issued by the town's Local Plumbing Inspector

Contact details are copied from each office’s official page and were checked against it on October 24, 2026.

Off-grid gear

Going off-grid in Town of Lisbon means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Lisbon, Maine?

Yes. The Town of Lisbon requires a building permit for new one- and two-family dwellings, additions and renovations inside town limits1. A permit lapses if work has no substantial start within 6 months, and it expires 1 year after issue1. The building code in Lisbon is the state-adopted Maine Uniform Building and Energy Code4, and new structures need an energy application as well4.

Building permits for Lisbon come from the town, not Androscoggin County, which has no building department10.

Who issues building permits in Lisbon, and how do you apply?

The Town of Lisbon's code enforcement office, at the Lisbon Town Offices, handles building permits11. The town has suspended its online permit process for now: print the application from the Code Enforcement page and email the completed form, or deliver it in person during business hours1211. The office is open Monday through Thursday and closed Friday11.

A fee schedule is posted on the town's Fees page; we did not read the amounts, so confirm the cost with the office13. Expect inspections: at a minimum the foundation before the pour and before backfill14.

Does Lisbon, Maine have zoning?

Yes. Lisbon zoning is Chapter 70 of the Lisbon Code of Ordinances, run by the town code enforcement officer, planning board and board of appeals, with aquifer protection and shoreland overlays2. Variances go to the Board of Appeals2. Androscoggin County does not zone15, so the town's tables of land uses and dimensional requirements are the rules that matter.

We could not confirm lot sizes, setbacks, minimum dwelling size or whether RVs can be lived in on a Lisbon lot. Ask the code enforcement office, and name the exact zoning district of the parcel. Land divided into three or more lots within five years is a subdivision reviewed by the planning board16.

How do septic permits work in Lisbon, Maine?

Maine requires a permit to install a new, expanded or replacement septic system, apart from normal maintenance and repair3. A licensed site evaluator generally prepares the application, and the Local Plumbing Inspector examines it; work cannot start until the permit is issued17. Lisbon's building permit form asks for a septic design (HHE-200) or an approved sewer entrance application1.

We could not confirm which official issues septic permits inside Lisbon; ask the town offices. USDA rates only a small share of soils in Androscoggin County as not limited for a conventional drain field18, so many lots need a site evaluation or an engineered system. A complete non-engineered system carries a state fee of $250 plus listed add-ons19.

Can you put a tiny home, manufactured home or RV on a Lisbon lot?

Maine law requires municipalities to permit a tiny home on a house lot where single-family dwellings are allowed, subject to the same land-use requirements7. Manufactured housing must likewise be allowed where single-family homes are8. Lisbon's own rule covers manufactured housing and mobile home parks, which need planning board and town council approval9; we did not find Lisbon's rules for a single manufactured home on its own lot.

For living in an RV on your land, we could not confirm Lisbon's rule. Maine's campground licensing does not answer that question20. Call the code enforcement office before you buy.

Building a home in Lisbon: the steps, in order

  1. Ask the code enforcement office which zoning district the parcel is in and what Chapter 70 allows there2.
  2. Check floodplain and shoreland overlays, since flood zones get extra review21.
  3. Hire a licensed site evaluator and apply for the septic permit through the Local Plumbing Inspector17.
  4. Apply for a new entrance permit if you are cutting a driveway onto a public way6.
  5. Submit the building permit application, with the septic design or sewer application1.
  6. Pass inspections, including foundation, framing, rough plumbing and electrical, insulation, and the final inspection before occupancy14.

Watch-outs

  • Lisbon's online permit process is temporarily suspended; print the form and email or deliver it to the code enforcement office12.
  • Lisbon's own site plan checklist and permit form disagree on which building code edition applies; confirm with the code enforcement office4.
  • Lisbon's new-entrance permit has extra access standards on Lisbon Street (Route 196), Main Street north of Huston Street (Route 125), Mill Street, Ridge Road (Route 9) and Upland Road6.
  • Androscoggin County's rules do not govern land in Lisbon; see the Androscoggin County page for the county overview15.
  • We could not confirm Lisbon's rules on RV occupancy, lot size, setbacks, wells or owner-builders, which sit in the town's zoning tables; ask the code enforcement office2.

Sources

  1. Town of Lisbon Residential Building Permit Application (1 and 2 family dwellings) (Town of Lisbon), quoted and re-checked
  2. Town of Lisbon Site Plan Review Application, ordinances checklist (Town of Lisbon), quoted and re-checked
  3. Subsurface Wastewater System Permitting, quoted and re-checked
  4. Town of Lisbon Residential Building Permit Application (1 and 2 family dwellings) (Town of Lisbon), quoted and re-checked
  5. Subsurface Wastewater Licensing & Certification, quoted and re-checked
  6. Town of Lisbon Site Plan Review Application, ordinances checklist (Town of Lisbon), quoted and re-checked
  7. Title 30-A, §4363: Regulation of tiny homes, quoted and re-checked
  8. Maine Revised Statutes Title 30-A, §4358: Regulation of manufactured housing (Maine statewide rule), quoted and re-checked
  9. Town of Lisbon Site Plan Review Application, ordinances checklist (Town of Lisbon), quoted and re-checked
  10. Maine Office of State Fire Marshal - MUBEC Rules and Laws (2026 county census)
  11. Town of Lisbon Code Enforcement (lisbonmaine.gov)
  12. Lisbon Code Enforcement page (Town of Lisbon), quoted and re-checked
  13. Lisbon Code Enforcement Fees (Town of Lisbon), quoted and re-checked
  14. Town of Lisbon Residential Building Permit Application (1 and 2 family dwellings) (Town of Lisbon), quoted and re-checked
  15. Maine Office of State Fire Marshal - Building Codes (2026 county census)
  16. Town of Lisbon Site Plan Review Application, ordinances checklist (Town of Lisbon), quoted and re-checked
  17. Subsurface Wastewater System Permitting, quoted and re-checked
  18. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  19. Subsurface Wastewater System Permitting, quoted and re-checked
  20. Maine Revised Statutes Title 22, §2491: Definitions (Maine statewide rule), quoted and re-checked
  21. Town of Lisbon Site Plan Review Application, ordinances checklist (Town of Lisbon), quoted and re-checked

Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Town of Lisbon

Town of Lisbon’s own rules

  • Building permitRequired

    New 1 and 2 family dwellings, additions and renovations inside Lisbon town

    • Permit expires if no substantial start within 6 months and expires 1 year from issue
    • Permits are subject to appeal for 30 days from issuance
    • Wastewater projects must include an HHE-200 septic design or an approved sewer entrance permit application
    • Fee schedule posted separately
    “a building permit expires if there is no substantial start on the project within a period of 6 months and expires 1 year from the date of issue.”
  • Building code adoptedAdopted

    Construction inside Lisbon town

    • The town's site plan checklist cites Chapter 54, Article II as adopting the 2003 IBC and IRC, which conflicts with the permit form's reference to the current state MUBEC; the permit form is the later document (form dated 1/1/2023)
    • Energy application required for new structures, additions and conversions of unheated to heated space
    “the building code in lisbon is the state adopted edition of the maine uniform building and energy code (mubec)”
  • InspectionsRequired

    Permitted residential construction inside Lisbon town

    • Inspections of foundation, framing, rough plumbing and electrical, insulation, and final before occupancy
    “inspections; at a minimum we will need to inspect the foundation prior to pour and before it is backfilled;”
  • Local zoningPresent

    Land inside Lisbon town limits; zoning is Chapter 70 of the Lisbon Code of Ordinances, administered by the town code enforcement officer, planning board and board of appeals

    • Overlays include aquifer protection and shoreland zoning
    • Variances go to the Board of Appeals
    “table of land uses, table of dimensional requirements. chapter 70, article iv, division 13 and division 14 these tables list all permitted and non-permitted land uses by zone/district”
  • Manufactured homesLimited

    Manufactured housing, house trailer and mobile home parks inside Lisbon town (Chapter 22, Article II)

    • Quoted rule covers parks; rules for individual manufactured homes on single lots were not found
    • Planning board and town council approval required for a park
    “no manufactured housing, house trailer or mobile home park shall be established in the town except upon application to the planning board and the town council.”
  • Subdividing landRegulated (with conditions)

    Division of land inside Lisbon town (Chapter 66)

    • Subdivision means division into 3 or more lots within any 5-year period, or creation of 3 or more dwelling units
    • Subdivisions in ROS zones greater than 10 acres must meet open space subdivision standards
    • Planning board reviews applications
    “all subdivisions are subject to review and must meet the standards and provisions of this chapter according to state statute 30-a m.r.s.a. § 4401.”
  • Driveway accessRequired

    New entrances onto public ways inside Lisbon town (Chapter 46, Article V)

    • Specific access management standards apply on Lisbon Street (Route 196), Main Street north of Huston Street (Route 125), Mill Street, Ridge Road (Route 9) and Upland Road
    “any new entrance onto a public way requires a permit and must meet specified standards.”
  • Building in a floodplainRequired

    Special flood hazard areas inside Lisbon town (Chapter 58, Article II)

    • Applies to FEMA zones A and A1-30
    “land uses within any special flood hazard areas (zones a and a1-30 identified by fema) are subject to evaluation and to land use and control measures”
  • Permit feesPublished

    Building permits inside Lisbon town

    • Fee schedule is a linked document; amounts not read
    “fees 2026 fee schedule building permit fee schedule”
  • Permit processPublished

    Building permits inside Lisbon town

    • Online process is temporarily suspended; print the form and email it or deliver it to the codes office
    “please print a permit application from the link on the left side and email your completed form to”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Lisbon or Androscoggin County directly.

  • Owner-builder exemption — Owner-builders inside Lisbon town
  • Certificate of occupancy — Occupancy of new dwellings inside Lisbon town
  • Minimum dwelling size — Dwellings inside Lisbon town
  • Minimum lot size — Residential districts inside Lisbon town
  • Setbacks — Residential districts inside Lisbon town
14 more unanswered
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Lisbon publishes no rule on the point, not that none exists. Androscoggin County’s page lists the county offices to call.

← All of Androscoggin County: county rules, score and offices