Patterson, Louisiana requires building permits for construction covered by the State Uniform Construction Code, with applications through the city Building Department.12 Patterson sets its own zoning inside city limits in St. Mary Parish.3 Individual septic systems need Louisiana health approval through the parish health unit, separate from city building approval.45

At a glance

Building permits
Required for code-covered construction; city application available12
Zoning
City zoning applies inside Patterson3
Septic permits
State health approval; local contact is the parish health unit5
Lot size
R-10: 10,000 square feet per living unit; 100-foot minimum width6
RV living
Published RV park rules do not establish permission to live on a private lot; ask city Planning & Zoning78
Owner-builder
Conditional contractor licensing exemption; building and health requirements still apply9

Who to call

Building permits

Patterson Building Department

City building permit applications, building plan submissions and questions about construction approval

(985) 395-5205

[email protected]

1314 Main St. P. O. Box 367 Patterson, LA 70392

Online permits →

Zoning

Patterson Planning & Zoning

City zoning questions through City Hall

(985) 395-5205

1314 Main St. P. O. Box 367 Patterson, LA 70392

Septic permits

St. Mary Parish Health Unit

Environmental Health contact for state onsite sewage approval in St. Mary Parish

985.380.2441

1200 David Drive, Morgan City, LA 70380

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Patterson means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Patterson, LA?

Patterson home construction covered by Louisiana’s State Uniform Construction Code requires building permits; the statewide residential mandate covers new construction, reconstruction, additions to homes previously built to the residential code, and extensive alterations.1 Patterson’s Building Department publishes a city building permit application and directs applicants to email building plans to [email protected].2

Patterson historic district work can also require a commission application for new buildings and specified exterior work fronting a public street or alley; repainting the same color and repairs restoring the preexisting condition are exceptions to that commission requirement.10 Do not treat a historic commission exception as an exemption from the separate construction approval process.101

Who handles Patterson building permits and zoning questions?

Start with the Patterson Building Department for the city building permit application and building plan submission instructions.2 City Hall’s published contact is (985) 395-5205, and the city also has a Planning & Zoning page for municipal land-use questions.28

The Building Department page separately lists permit categories for mobile homes, portable sheds, culverts, roofing, pools, signs, electrical panels and demolition.2 For a mobile home, Patterson requests the title, plot plan and mover information, and requires plumbing installed by a licensed plumber.2 Septic approval remains with Louisiana health officials, so a city building application does not replace state onsite sewage approval.4

Does Patterson have zoning, lot sizes and setbacks?

Patterson has municipal zoning, and dimensional requirements depend on the district rather than a single citywide lot-size rule.36 In Patterson’s Residential R-10 district, dwellings require at least 10,000 square feet of lot area per living unit and a minimum lot width of 100 feet.6 R-10 dwelling yards must be at least 30 feet deep in front, 10 feet in the rear and 5 feet at the sides.11

Use the zoning map linked by the city Building Department and ask Patterson Planning & Zoning to confirm the parcel’s district before applying those dimensions to a purchase or house design.28 Patterson also tells applicants to verify that a proposed mobile home fits the property, including setbacks and easements.2

How do septic permits work inside Patterson?

Individual onsite sewage systems serving Patterson property require a permit from the Louisiana state health officer before installation, alteration or operation, with approved plans and specifications.12 A municipality cannot authorize installation without written Office of Public Health approval.4 Contact Environmental Health at the St. Mary Parish Health Unit in Morgan City for the local state permitting route.135

Louisiana’s individual-system approval depends on determining that connection to community sewerage is not feasible, so resolve sewer availability before planning a septic system.12 St. Mary Parish’s soil figures show 0% rated “not limited” for conventional drain fields; that parishwide screening does not make septic impossible or determine a Patterson lot’s suitability, but supports arranging a site evaluation before committing to a conventional system.14

Can you live in an RV or tiny home in Patterson?

Patterson’s verified RV provisions concern recreational vehicle parks: public water connection is required where a public supply is available, and each RV space needs an accessible, adequate, safe sewer connection.7 Patterson trailer park rules separately require sanitary sewer connections and compliance with parish health unit and state health department standards.15 These park provisions do not establish permission to live in an RV on an ordinary private residential lot.7

We could not confirm a Patterson rule allowing private-lot RV living while building, or a tiny-home-specific occupancy rule; ask Patterson Planning & Zoning about the proposed use and the Building Department about construction approval before buying or moving a unit onto the parcel.82

Building a home in Patterson: what are the steps?

  1. Confirm the Patterson parcel’s zoning district with city Planning & Zoning and compare the site plan with the applicable lot and yard requirements.8611
  2. Resolve community sewer availability; if an individual system is proposed, contact the St. Mary Parish Health Unit for state health approval before installation.125
  3. Use the city Building Department’s building permit application and email building plans as instructed on its page.2
  4. Ask the Building Department for the inspection schedule, current fees and occupancy approval requirements for the project.2

Louisiana’s owner-builder option is a contractor licensing exemption for a qualifying personal residence, with an affidavit and continuing health and life-safety requirements; it does not remove the building approval obligations.9

What should you check before buying land in Patterson?

Patterson subdivision and manufactured-home-park proposals must meet the floodplain development permit requirements referenced in the city’s flood damage prevention ordinance.16 For a house parcel, ask the city Building Department to review the flood map it publishes and identify the project’s floodplain approval requirements before you settle on a design.2

If a private well is proposed, Louisiana requires licensed drilling and registration of new wells, while domestic wells fall under post-installation notification rather than the ordinary advance-notification rule.17 A driveway connecting to a Louisiana state highway requires the applicable DOTD access approval before construction.18 For property outside Patterson city limits, consult the St. Mary Parish guide: the parish’s development code applies to unincorporated land.19

Watch-outs

  • Patterson’s R-10 lot and setback dimensions are district-specific; confirm the parcel’s zoning with city Planning & Zoning.6118
  • Patterson RV park utility rules do not establish permission for private-lot RV occupancy; ask city Planning & Zoning before planning to live onsite during construction.78
  • City building approval cannot substitute for written Louisiana Office of Public Health approval of an individual sewage system.4

Sources

  1. Louisiana Revised Statutes 40:1730.23 — Enforcement of building codes by municipalities and parishes (Louisiana statewide rule), quoted and re-checked
  2. Patterson Building Department (cityofpattersonla.gov)
  3. Code of Ordinances, Appendix A—Zoning, Sec. 4.1—Schedule of district regulations (Patterson), quoted and re-checked
  4. RS 40:5. General powers and jurisdiction, quoted and re-checked
  5. Onsite Wastewater Program, quoted and re-checked
  6. Code of Ordinances, Appendix A—Zoning, Sec. 4.1—Schedule of district regulations (Patterson), quoted and re-checked
  7. Code of Ordinances, Appendix A—Zoning, Sec. 5.4.1—Recreational Vehicles where permitted (Patterson), quoted and re-checked
  8. Patterson Planning & Zoning (cityofpattersonla.gov)
  9. Louisiana Revised Statutes § 37:2157 — Exemptions (Louisiana statewide rule), quoted and re-checked
  10. Code of Ordinances, Chapter 24, Sec. 24-8—Historic district permits and mobile homes (Patterson), quoted and re-checked
  11. Code of Ordinances, Appendix A—Zoning, Sec. 4.1—Schedule of district regulations (Patterson), quoted and re-checked
  12. Louisiana Administrative Code Title 51, Part XIII, Public Health—Sanitary Code (Louisiana statewide rule), quoted and re-checked
  13. St. Mary Parish Health Unit (ldh.la.gov)
  14. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  15. Code of Ordinances, Appendix A—Zoning, Sec. 5.4—Trailers where permitted (Patterson), quoted and re-checked
  16. Code of Ordinances, Chapter 20, Sec. 20-68—Standards for subdivision proposals (Patterson), quoted and re-checked
  17. Louisiana Administrative Code, Title 43, Part VI, §701 (Louisiana statewide rule), quoted and re-checked
  18. LaDOTD Access Connections Policy (Louisiana statewide rule), quoted and re-checked
  19. Unified Development Ordinance, quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Patterson

Patterson’s own rules

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Patterson or St. Mary Parish directly.

  • Owner-builder exemption — Owner-built residential construction inside Patterson city limits.
  • Building code adopted — Building construction inside Patterson city limits.
  • Inspections — Building construction inside Patterson city limits.
  • Certificate of occupancy — Occupancy of buildings inside Patterson city limits.
  • Minimum dwelling size — Dwellings inside Patterson city limits.
11 more unanswered
  • Lot coverage
  • Building height
  • Tiny homes
  • Accessory dwellings
  • Septic permit
  • Septic inspection
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Patterson publishes no rule on the point, not that none exists. St. Mary Parish’s page lists the county offices to call.

← All of St. Mary Parish: county rules, score and offices