East Feliciana Parish, Louisiana requires a building permit for new residential construction, with plan review completed before the permit becomes valid.1 The parish also requires zoning approval, a verified emergency address and a floodplain determination before plan review and permitting begin.2 Individual sewerage systems need a state health officer's permit.3
At a glance
- Building permit
- Required for new residential construction1
- Zoning
- Yes; parish zoning applies in unincorporated areas4
- Septic
- State health permit required before installation or operation3
- Owner-builder
- License exemption for an owner building a primary residence, with conditions5
- RV or tiny-home living
- Local occupancy rules not confirmed; ask the parish Building Department6
- New small subdivision lots
- At least 2 acres and 100 feet of public-road frontage for qualifying simple subdivisions7
- Private well
- Use a licensed driller and confirm state notification requirements8
Who to call
Building permits
East Feliciana Parish Building Department
Residential building permits, plan review, inspections and parish floodplain determinations
12064 Marston Street, Post Office Box 427, Clinton, LA 70722
Septic permits
Louisiana Department of Health - East Feliciana Parish Health Unit
Local Environmental Health contact for questions about individual sewerage permits
12080 Marston Street, Clinton, LA 70722
Contact details are copied from each office’s official page and were checked against it on September 27, 2026.
Do you need a building permit in East Feliciana Parish, Louisiana?
Yes. East Feliciana Parish requires a permit for new residential construction, and construction may begin only after plan review is complete and the inspection board is issued.1 The Building Department enforces an adopted building code through plan review, permits and field inspections.9
Before the review starts, the parcel division and zoning must be approved, the emergency address must be obtained or verified, and the parish must make its floodplain determination.2 The application package includes ownership evidence, a survey, contractor credentials or the owner-builder affidavit, house plans and a plot plan.10 Parish fees vary with the type and scale of work, so confirm the current total with the Building Department before filing.11
Who issues building permits in East Feliciana Parish?
The East Feliciana Parish Building Department handles residential building permits, plan review, inspections and the parish floodplain determination.6 Its published residential procedure says a building permit covers the review and building process, but the permit is not valid until plan review finishes.1
Contact the department at the number listed above before buying plans or scheduling work. The parish process can also require town approval, so property inside Clinton, Jackson, Slaughter, Wilson or Norwood may have an additional municipal step.1 For unincorporated land, subdivision and resubdivision are regulated before proposed lots can be sold or receive building permits.12 The department's permit page links to an online application portal.6
Does East Feliciana Parish have zoning?
Yes. East Feliciana Parish has a Planning and Zoning Commission, and its planning and development code applies to land, buildings and structures in unincorporated East Feliciana Parish.4 Zoning approval must be complete before residential plan review and permitting begin.1
The available material does not confirm a complete current zoning map or district schedule, so ask the parish Building Department to identify the parcel's district and permitted use before closing. Louisiana law allows parish zoning districts to regulate structure size, lot occupancy, open space, density and land use, but the actual local district controls the parcel.13 For qualifying simple subdivisions with no more than five lots, the parish claim specifies a two-acre minimum lot size and one hundred feet of public-road frontage.7
How do septic permits work in East Feliciana Parish?
Louisiana requires a state health officer's permit before an individual sewerage system is installed, altered or operated, and the permit includes approval of plans and specifications.3 The East Feliciana Parish Health Unit is the local Environmental Health contact; call that office to confirm the application, site-evaluation and inspection sequence for the parcel.14
A septic tank system may be used where community sewer is unavailable and the sanitary-code requirements are met.15 Final approval depends on verifying code-compliant installation through a state representative's on-site inspection, an installer certification, or both.16 Only about eleven percent of parish soils lack severe limitations for a conventional drain field, so make septic feasibility an early contingency rather than assuming a standard system will fit.17
Can you live in an RV or tiny home in East Feliciana Parish?
We could not confirm a parish rule that authorizes long-term RV occupancy, temporary camping on private land or tiny-home occupancy. Ask the East Feliciana Parish Building Department for a written answer tied to the parcel's zoning district before buying or moving a unit. The parish does have zoning in unincorporated areas, and zoning approval is part of the residential permitting sequence.4
A tiny home used as a dwelling should not be assumed exempt from the building process: Louisiana requires residential-code enforcement for covered new construction, reconstruction, additions and extensive alterations.18 Off-grid living also does not remove wastewater oversight; an individual sewerage system requires state approval, and a conventional septic system is available only where community sewer is unavailable and sanitary-code conditions are met.315
Building a home in East Feliciana Parish: what are the steps?
Follow the parish sequence before putting a crew on site:
- Confirm ownership, parcel boundaries, subdivision status and zoning approval; proposed subdivisions need parish approval outside incorporated municipal limits.12
- Obtain or verify the emergency address and ask the parish whether town approval applies.10
- Have the parish complete its floodplain determination; a flood-zone site requires a stamped elevation certificate.19
- Resolve sewer availability and obtain state approval for any individual sewerage system through the health authority.315
- Submit ownership proof, the survey, credentials or owner-builder affidavit, house plans and the plot plan to the Building Department.10
- Wait for completed plan review before beginning construction, then schedule each required inspection before covering the work.120
What should you check before buying land in East Feliciana Parish?
Start with buildability, not the listing description. Ask the parish to verify the parcel's zoning, legal division, road frontage and flood status, because zoning and floodplain review occur before residential permitting.1 If the tract fronts a Louisiana state highway, an access-connection permit must be signed and numbered before driveway construction begins.21
Make the purchase contingent on a workable wastewater plan: only about eleven percent of parish soils lack severe limits for a conventional drain field.17 A private well must be installed by a licensed water-well contractor and registered after completion, while the notification timing depends on the well type.8 For budgeting context, the median annual property-tax bill is about three hundred twenty-eight dollars, but the actual bill depends on the parcel and exemptions.22
Watch-outs
- Do not start work when the permit is merely purchased; East Feliciana Parish says the permit becomes valid only after plan review is complete.1
- A flood-zone home needs a stamped elevation certificate, and the completion certificate is due after the slab pour but before framing on the slab.19
- Owner-builders may construct their own primary residence without a contractor license, but must occupy it and cannot use the exemption to build for rent or sale.5
- We could not confirm parcel-specific RV, tiny-home, setback or minimum-home-size rules; ask the parish Building Department for the applicable zoning district standards before purchase.6
Sources
- Permitting Procedure for New Residential Construction, quoted and re-checked
- Permitting Procedure for New Residential Construction (2026 county census)
- Louisiana Administrative Code Title 51, Part XIII, Public Health—Sanitary Code (Louisiana statewide rule), quoted and re-checked
- East Feliciana Parish Code of Ordinances, Chapter 12 Planning and Development (2026 county census)
- FAQ – Louisiana State Licensing Board for Contractors, quoted and re-checked
- East Feliciana Parish Building Department (efparish.org)
- Appendix A. Subdivision Ordinance, quoted and re-checked
- Louisiana Administrative Code, Title 43, Part VI, §701 (Louisiana statewide rule), quoted and re-checked
- 2021 Annual Operating Budget Building Code Fund, quoted and re-checked
- Permitting Procedure for New Residential Construction, quoted and re-checked
- 2021 Annual Operating Budget Building Code Fund, quoted and re-checked
- Appendix A. Subdivision Ordinance, quoted and re-checked
- RS 33:4780.40 — Regulation authorized (Louisiana statewide rule), quoted and re-checked
- Louisiana Department of Health - East Feliciana Parish Health Unit (ldh.la.gov)
- Louisiana Administrative Code Title 51, Part XIII, Public Health—Sanitary Code (Louisiana statewide rule), quoted and re-checked
- Louisiana Administrative Code Title 51, Part XIII, Public Health—Sanitary Code (Louisiana statewide rule), quoted and re-checked
- Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
- Louisiana Revised Statutes 40:1730.23 — Enforcement of building codes by municipalities and parishes (Louisiana statewide rule), quoted and re-checked
- Permitting Procedure for New Residential Construction, quoted and re-checked
- Required Inspections for Residential Construction, quoted and re-checked
- LaDOTD Access Connections Policy (Louisiana statewide rule), quoted and re-checked
- Median property tax bill: Bolthole Index county data
Written September 27, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.