Shreveport, Louisiana requires building permits and approved plans for building construction and reconstruction.1 Shreveport has its own zoning districts; septic permitting is administered by the Louisiana Department of Health through the Caddo Parish Health Unit.23 For land outside city limits, use the Caddo Parish guide.4
At a glance
- Building permits
- Required for construction and reconstruction; painting and flooring are exempt1
- Zoning
- City zoning applies, including an R-A Rural Agricultural district2
- Septic permits
- Louisiana Department of Health, through the Caddo Parish Health Unit35
- Building inspections
- Required at foundation, framing, pre-finish and completion stages6
- Owner-submitted plans
- Owners may submit plans; a city owner-builder exemption is unconfirmed7
- Driveway construction
- City submission requires a site plan8
Who to call
Building permits
City of Shreveport Division of Permits & Inspections
Building and trade permits, plan review, inspection scheduling and online building-permit search
505 Travis St. Government Plaza, Suite 130 Shreveport , LA 71101
Zoning
Shreveport-Caddo Metropolitan Planning Commission, Planning Department
City zoning questions, development standards and rezoning applications
505 Travis St Suite 440 Shreveport, LA 71101
Septic permits
Caddo Parish Health Unit, Louisiana Department of Health
Local health-unit contact for state onsite sewage permitting
1035 Creswell Avenue Shreveport, LA 71101
Floodplain permits
City of Shreveport Permit Center, Floodplain Development
City floodplain construction and development-permit questions
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Shreveport means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Shreveport, LA?
Shreveport requires approved building plans for construction and reconstruction, with building-permit requirements covering new buildings, additions, remodels, roofs, siding and accessory structures.1 Painting and flooring do not require building permits in Shreveport.1 A Shreveport driveway project requires a site plan as part of the city submission.8
Shreveport construction must conform to the adopted International Building, Existing Building and Residential codes and applicable local ordinances.9 Owners may submit building plans, but we could not confirm a city owner-builder exemption; ask Permits & Inspections about the contractor requirements for your project.7
Who issues Shreveport building permits, and how do you apply?
The City of Shreveport Division of Permits & Inspections processes building, electrical, mechanical and plumbing permits.10 Reach the Shreveport building office at 318-673-6100 or visit Government Plaza, Suite 130, using the address listed below.10
Shreveport uses My Government Online for building-permit applications, payments, inspection requests, file submissions and permit-status checks.7 The same portal offers building-permit searches and downloads of approved plans and inspection reports.10 A contractor, architect, engineer or owner may submit plans for review.7 Ask the division for a project-specific building-permit fee estimate before committing to a construction budget.
Does Shreveport have zoning, lot-size rules and setbacks?
Shreveport has city zoning, and the R-A Rural Agricultural district is intended to allow single-family residences within agricultural areas.2 The Shreveport-Caddo Metropolitan Planning Commission is the planning contact for zoning questions and rezoning applications.11 Shreveport zoning restrictions govern building types, height, distance from the street and other development standards.11
We could not confirm the R-A and principal single-family districts’ minimum lot sizes, setbacks, lot coverage, building heights or minimum dwelling sizes; ask the MPC to identify the parcel’s district and the applicable dimensional standards.211 Before buying agricultural-looking land inside Shreveport, ask the MPC and Permits & Inspections whether the proposed home and outbuildings qualify under city zoning and building requirements.21
How do septic permits work inside Shreveport?
Septic permits inside Shreveport come through the Louisiana Department of Health’s parish-health-unit permitting system, with the Caddo Parish Health Unit as the local contact.3 Louisiana requires a state-health-officer permit before installing, altering or operating an individual sewerage system.5 Approval considers whether community sewer connection is feasible, along with soil, drainage and lot dimensions.5
Louisiana final approval requires installation verification through a health-officer representative’s inspection and/or a licensed installer’s certification.12 Caddo Parish’s countywide soil estimate rates only 13.6% of soils not limited for conventional septic drain fields; that is a reason for a site evaluation, not proof that septic is impossible on a Shreveport lot.13
Can you live in an RV or tiny home in Shreveport?
We could not confirm whether Shreveport allows residential RV occupancy on a private lot or a tiny home as a residence; ask the MPC about the proposed use and Permits & Inspections about the structure before buying.21 Shreveport’s temporary-camping rules address city parks and Cross Lake, including a permit requirement for camps or tents in parks; those provisions do not establish permission to live in an RV on private land.14
Shreveport’s mobile-home and travel-trailer provisions require public water and sewerage connections for units used as places of business and utility piping systems in parks.15 Those business and park requirements leave the private residential-lot question unresolved.15
Building a home in Shreveport: what are the steps?
- Ask the MPC to identify the parcel’s city zoning and confirm that the planned residential use and building placement fit the applicable standards.211
- For a proposed septic system, contact the Caddo Parish Health Unit about state approval and sewer-connection feasibility before installation.35
- Submit building plans and the building-permit application through My Government Online; Shreveport requires plan approval for construction and reconstruction.71
- If the Shreveport site lies in a special flood hazard area, obtain the city development permit before construction or development begins.16
- Request building inspections before pouring foundation concrete, when framing is complete, before finish materials and at completion; trade inspections occur at similar stages.6
What should you check before buying land in Shreveport?
Ask the Shreveport Permit Center about floodplain requirements before committing to a building site; development in a special flood hazard area requires a development permit before work begins.16 Ask the MPC about parcel-specific zoning and ask Permits & Inspections about any driveway site-plan submission.118
Louisiana requires new water wells to be installed by a licensed drilling contractor and registered within 30 days after completion; domestic wells follow post-installation notification rather than the ordinary advance-notification procedure.17 We could not confirm additional Shreveport-specific well requirements or off-grid residential sanitation approval; ask the city building office and the Caddo Parish Health Unit before planning independent water and waste systems.103
Watch-outs
- Owner-submitted plans in Shreveport do not establish a confirmed exemption from building permits or inspections; ask Permits & Inspections about owner-builder requirements.716
- Shreveport’s residential certificate-of-occupancy requirement is unclear: the city describes commercial and home-business certificates but also publishes a residential rate, so ask the MPC which certificate your use needs.18
- Shreveport city-park camping provisions do not settle RV living on a private residential lot; ask the MPC before relying on an RV during construction.1411
Sources
- Permits & Inspections (Shreveport), quoted and re-checked
- Unified Development Code § 4.2 Residential Districts (Shreveport), quoted and re-checked
- Onsite Wastewater Program (Shreveport), quoted and re-checked
- Your Guide to Permits & Inspections MPC (2026 county census)
- Louisiana Administrative Code Title 51, Part XIII, Public Health—Sanitary Code (Louisiana statewide rule), quoted and re-checked
- Inspections (Shreveport), quoted and re-checked
- Permits & Inspections (Shreveport), quoted and re-checked
- Permits & Inspections (Shreveport), quoted and re-checked
- Building Codes (Shreveport), quoted and re-checked
- City of Shreveport Division of Permits & Inspections (shreveportla.gov)
- Shreveport-Caddo Metropolitan Planning Commission, Planning Department (shreveportcaddompc.com)
- Louisiana Administrative Code Title 51, Part XIII, Public Health—Sanitary Code (Louisiana statewide rule), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Code of Ordinances § 62-31 Erection of camps or buildings (Shreveport), quoted and re-checked
- Code of Ordinances § 54-4 Use restrictions (Shreveport), quoted and re-checked
- City of Shreveport Permit Center, Floodplain Development (shreveportla.gov)
- Louisiana Administrative Code, Title 43, Part VI, §701 (Louisiana statewide rule), quoted and re-checked
- Inspections (Shreveport), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.