Hurstbourne, Kentucky has a city building and property-improvement approval process; applicable Louisville Metro building permits remain separate requirements.1 Hurstbourne adopts and administers zoning through referenced Jefferson County Land Development Code provisions.2 Septic systems inside Hurstbourne stay with the local health department, Louisville Metro Public Health and Wellness.34
At a glance
- Building approval
- City approval plus applicable Louisville Metro building permits1
- Zoning
- Hurstbourne adopts referenced Jefferson County Land Development Code provisions2
- Building codes
- Kentucky Building and Plumbing Codes adopted; Jefferson County Building Inspector is building-code enforcement agent5
- Septic permits
- Louisville Metro Public Health and Wellness; site evaluation comes first43
- Owner-installed septic
- Homeowner's permit required through the local health department6
- Private wells
- No property-owner state application or fee for construction or abandonment; certified driller required7
Who to call
Building permits
City building and property-improvement applications; contact the city for zoning questions.
200 Whittington Pkwy. Suite 100, Louisville, KY 40222
Septic permits
Louisville Metro Department of Public Health and Wellness — Onsite Septic System Program
Septic site evaluations, construction permits and inspections for property using onsite wastewater disposal.
400 East Gray St 2nd floor, Louisville KY 40202
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Hurstbourne means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Hurstbourne have zoning, and what about lot size and setbacks?
Hurstbourne has municipal zoning: the city adopts specified Jefferson County Land Development Code provisions by reference, excluding the appendices.2 Hurstbourne's home-occupation regulations supersede the referenced Metro provisions identified in the city code.2
Before choosing a house footprint or buying a lot for a particular use, ask the City of Hurstbourne to identify the parcel's zoning district and confirm its lot-size, setback, height and lot-coverage requirements.2 We could not confirm Hurstbourne's district-specific dimensional schedules or minimum dwelling size; request the applicable schedule from the city before relying on a proposed layout.2
Do you need a building permit in Hurstbourne, and who issues it?
Hurstbourne publishes a city building and property-improvement application, and city approval does not replace applicable Louisville Metro building permits.1 Hurstbourne's code names the Jefferson County Building Inspector as the Kentucky Building Code enforcement agent and the State Plumbing Inspector as the Kentucky Plumbing Code enforcement agent.5
Start with the city's building application and ask which city approvals and Metro building permits your project needs.1 The City of Hurstbourne lists (502) 426-4808 and [email protected] for contact.8 Prepare a scaled drawing on a surveyed plot plan, material details and the applicable Metro contractor license number.1 City approval covers Hurstbourne ordinances only; other government requirements and applicable HOA restrictions remain relevant.1
How do septic permits work inside Hurstbourne?
For a Hurstbourne property using onsite wastewater disposal, Louisville Metro Public Health and Wellness requires a septic permit for work on the system.4 The Metro program starts a new installation with a site-evaluation application and $375 payment; after submission, the septic installer schedules the evaluation with the department.4 The installer then designs the system and submits drawings with grade shots, and the applicant pays a $425 construction-permit fee.4
The Metro program says building/construction plans cannot be stamped until the onsite construction permit is issued, so resolve septic suitability before treating a house design as ready for approval.4 Installed components must be inspected before soil covers them.4 A homeowner installing their own Hurstbourne system still needs a homeowner's permit through the local health department.6
Can you live in an RV or tiny home in Hurstbourne?
We could not confirm permission for residential RV occupancy, temporary camping, tiny homes, manufactured homes or accessory dwellings inside Hurstbourne; ask the City of Hurstbourne about the proposed use at the specific address before buying a vehicle or dwelling.2 Hurstbourne's adopted zoning and city approval process remain the starting points for that conversation.21
Kentucky's temporary vehicle-sleeping provision concerns lawful parking on public roads, streets or parking lots and does not establish permission for permanent RV living on private Hurstbourne land.9 If public sewer is unavailable, Kentucky allows an approved private sewage disposal system under the state plumbing rule; that does not authorize unregulated off-grid sanitation.10
Building a home in Hurstbourne: what are the steps in order?
- Ask Hurstbourne to confirm the parcel's zoning and whether the proposed residential use and layout comply with the adopted regulations.2
- Resolve wastewater disposal: when septic is proposed, submit the Metro site-evaluation application and coordinate with an installer before finalizing the system and building plans.4
- Prepare Hurstbourne's scaled surveyed-plot drawing, material descriptions and applicable contractor information, then submit the city application.1
- Obtain applicable Louisville Metro building permits and provide proof within 30 days of the city approval's issue date, as the city application requires.1
- Arrange the required septic inspection before backfilling an installed system.4
We could not confirm Hurstbourne's certificate-of-occupancy requirement or building-permit fee schedule; ask the city to specify both before construction starts.1
What stays with Jefferson County, and what should Hurstbourne buyers check?
Hurstbourne's city approval does not transfer septic administration to City Hall: onsite evaluations and inspections remain with the local health department.311 For land outside Hurstbourne, use the Jefferson County guide to distinguish county answers from Hurstbourne's municipal approval process.1
Kentucky does not require a property-owner application or fee for constructing or abandoning a private well, but the work must be performed by a Kentucky Certified Water Well Driller; ask Hurstbourne separately about local water-service requirements.7 Jefferson County's effective property-tax rate is 0.9%, a county-level reference rather than a Hurstbourne parcel quote.12 Before purchase, ask the city about public utility connections, floodplain review and any unresolved occupancy rules, and examine applicable HOA deed restrictions alongside the city application requirements.1
Watch-outs
- Hurstbourne city approval covers city ordinances only; applicable Metro building permits and HOA restrictions still need attention.1
- We could not confirm Hurstbourne RV or tiny-home occupancy permission; ask the city about the proposed address and use before committing.2
- A new onsite septic system must be inspected before its components are covered with soil.4
Sources
- Building Permit (Hurstbourne), quoted and re-checked
- § 152.01 Zoning Regulations Adopted by Reference (Hurstbourne), quoted and re-checked
- Environmental Compliance FAQs (Hurstbourne), quoted and re-checked
- Louisville Metro Department of Public Health and Wellness — Onsite Septic System Program (louisvilleky.gov)
- § 150.01 Adoption of Kentucky Building Code; Enforcement Agents (Hurstbourne), quoted and re-checked
- Environmental Compliance FAQs (Hurstbourne), quoted and re-checked
- Water Well Information for Home Owners (Kentucky statewide rule), quoted and re-checked
- City of Hurstbourne (hurstbourne.org)
- KRS 511.110 — Unlawful camping (Kentucky statewide rule), quoted and re-checked
- 815 KAR 20:130. House sewers and storm water piping; methods of installation (Kentucky statewide rule), quoted and re-checked
- Environmental Compliance FAQs (Hurstbourne), quoted and re-checked
- Effective property tax rate: Bolthole Index county data
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.