Vermillion County, Indiana

Building permits, zoning and septic rules in Town of Dana, Indiana

Town of Dana, Indiana requires building permits for construction and other building changes that increase or decrease assessed property value; applicants start with the Clerk-Treasurer.1 We could not confirm Dana’s zoning requirements; ask Town Hall before choosing a use or building layout.2 In Vermillion County, the Health Department handles septic approval, while Dana also requires town approval for private sewage disposal when public sewer is unavailable.34

At a glance

Building permits
Required for building changes affecting assessed value; Clerk-Treasurer issues the town permit1
New-house building permit fee
$25 for single-family principal-building new construction1
Zoning
We could not confirm Dana zoning, setbacks or minimum home size; ask Town Hall2
Septic approval
County Health Department permit plus town Superintendent approval for private sewage disposal54
Public sewer
Connection required within 60 days after public sewer becomes available6
RV and tiny-home living
We could not confirm residential occupancy permission; ask Town Hall about the proposed setup2

Who to call

Also useful

Dana Town Hall / Clerk-Treasurer

First contact for building applications and questions about town land-use requirements; request referral to the Superintendent for sewer matters

(765) 665-3617

[email protected]

140 N Maple St Dana, IN 47847

Building permits

Dana Clerk-Treasurer — building permits

Issues town building permits and collects the applicable application fee

Septic permits

Vermillion County Health Department — Environmental Health

County septic permits and on-site sewage rules, including property inside Dana

(765) 832-3622

Contact details are copied from each office’s official page and were checked against it on October 12, 2026.

Off-grid gear

Going off-grid in Town of Dana means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Town of Dana, IN?

Dana’s building-permit ordinance covers erecting, constructing, enlarging, altering, repairing, moving, locating, relocating or converting a building or structure when the work changes assessed property value, including mobile and manufactured homes.1 Dana applicants must contact the town before work so the town can determine whether a building permit is necessary; required building permits are issued through the Clerk-Treasurer with payment at that time.1 The town lists a $25 building permit for new single-family principal-building construction.1 Dana’s building permit becomes void unless work begins within 120 days.1

Who issues building permits in Town of Dana, and how do you reach them?

The Dana Clerk-Treasurer issues the town’s required building permits and collects the applicable fee.1 Reach Dana Town Hall at (765) 665-3617 or [email protected] to discuss the proposed work before submitting an application.2 For demolition, Dana requires a permit before any building or structure is wrecked or demolished, and an authorized town representative inspects the premises before issuance to protect sewer and water connections.78 Dana’s demolition permit fee is $5 plus costs for moving town utility facilities; beginning demolition without the permit triggers a $250 late fee plus those utility costs.9

Does Town of Dana have zoning, minimum lot sizes or setbacks?

We could not confirm whether Dana has adopted zoning or what zoning districts, setbacks, lot coverage, building height or minimum dwelling size apply inside town limits; ask Town Hall for the requirements for the parcel and proposed use.2 For land outside Dana, use the Vermillion County guide: the county’s published zoning rules apply to unincorporated land, with specified participating municipalities also within the ordinance’s jurisdiction.10 Dana does have a sewage-related lot-area restriction: a private sewage system using subsurface soil absorption cannot receive a town permit on a lot smaller than 20,000 square feet.11 That threshold concerns the sewage system, rather than establishing a general minimum building lot size.11

How do septic permits and sewer connections work inside Town of Dana?

The Vermillion County Health Department issues septic permits for new systems, additions, repairs and upgrades inside Dana before septic construction begins.5 Dana also requires a written Superintendent permit before private sewage disposal construction when public sanitary sewer is unavailable; town approval is not effective until the completed installation satisfies the Superintendent.4 Dana requires notice for final inspection before underground portions are covered, with inspection within 24 hours after notice.11 When public sewer becomes available, Dana requires connection within 60 days and abandonment and filling of the private sewage facilities.6 County health approval therefore does not replace Dana’s own sewage approval or sewer-connection requirements.54

Can you live in an RV, tiny home or manufactured home in Town of Dana?

We could not confirm Dana’s rules for residential RV occupancy, temporary camping, tiny-home occupancy or accessory dwellings; ask Town Hall about the exact structure, duration of occupancy and sewage arrangement before buying or moving onto a lot.2 Dana lists a $25 building permit for placement or relocation of a mobile, manufactured or modular home, but that fee schedule alone does not establish permission to occupy every proposed home on every parcel.1 Indiana’s campground RV rules apply to regulated campsites and do not establish a general authorization for residential RV living on an individually deeded lot.12 Dana’s private sewage rules still require town approval and prohibit septic-tank or cesspool discharge to a natural outlet.4

Building a home in Town of Dana: what are the steps, in order?

  1. Contact Dana Town Hall with the proposed building work; the town determines whether a building permit is required and directs the application through the Clerk-Treasurer.1
  2. Ask Dana’s Superintendent about public sewer availability; private sewage disposal is the prescribed route when public sanitary sewer is unavailable.6
  3. If the project needs septic, obtain county Health Department approval before septic construction and the Superintendent’s written private-sewage permit before installation.54
  4. Pay the applicable town building-permit fee with the application and begin the permitted work within 120 days to keep the permit valid.1
  5. Notify the Superintendent when private sewage work is ready for final inspection, before underground portions are covered.11

What should you check before buying land in Town of Dana?

For a Dana parcel needing private sewage disposal, verify both sewer availability and usable lot area: the town bars subsurface soil absorption systems on lots under 20,000 square feet.64 Vermillion County’s soils data rates only 6.8% of soils “not limited” for conventional septic drain fields; that county-level rating supports a site evaluation and possibly an engineered system, rather than proving septic is impossible on a Dana lot.13 Ask the county Health Department whether a residential well permit is required; Indiana’s guidance identifies local permit requirements in some health departments and requires licensed water-well drillers.14 For a driveway connecting to a state highway, INDOT requires an application through its Electronic Permit System; Dana’s local driveway requirements remain unconfirmed, so ask Town Hall about town-street access.152

Watch-outs

  • Dana’s 20,000-square-foot threshold applies to private sewage systems using subsurface soil absorption, so a small lot without sewer deserves attention before purchase.4
  • Dana building-permit fees are nonrefundable once a formal application and plans have been submitted.1
  • We could not confirm Dana’s owner-builder exemption, occupancy-certificate or local floodplain-development requirements; ask Town Hall before committing to construction.2

Sources

  1. Dana Clerk-Treasurer — building permits (dana.in.gov)
  2. Dana Town Hall / Clerk-Treasurer (dana.in.gov)
  3. Vermillion County: Environmental Health (Town of Dana), quoted and re-checked
  4. § 51.03 Mandatory Connection (Town of Dana), quoted and re-checked
  5. Vermillion County: Environmental Health (Town of Dana), quoted and re-checked
  6. § 51.03 Mandatory Connection (Town of Dana), quoted and re-checked
  7. § 150.15 Permit Required (Town of Dana), quoted and re-checked
  8. § 150.17 Fees, Inspections, and Evidence of Insurance (Town of Dana), quoted and re-checked
  9. § 150.17 Fees, Inspections, and Evidence of Insurance (Town of Dana), quoted and re-checked
  10. Vermillion County Unified Development Ordinance, quoted and re-checked
  11. codelibrary.amlegal.com (Town of Dana), quoted and re-checked
  12. Environmental Public Health: 410 IAC 6-71 Campgrounds (Indiana statewide rule), quoted and re-checked
  13. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  14. Recommended Standards For Private Water Wells (Indiana statewide rule), quoted and re-checked
  15. INDOT Driveway Permit Guide 2024 (Indiana statewide rule), quoted and re-checked

Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Town of Dana

Town of Dana’s own rules

  • Building permitRequired

    Wrecking or demolishing any building or structure inside Dana town.

    • The requirement is specifically for wrecking or demolition; a general new-construction permit requirement was not established from the opened Dana sources.
    “It shall be unlawful to wreck or demolish any building or structure in the town without first securing a permit therefor.”
  • InspectionsRequired

    Premises where wrecking or demolition work occurs inside Dana town.

    • Inspection occurs before permit issuance; the town representative must ensure proper care so sewer or water connections are not endangered.
    “An authorized representative of the town shall inspect the premises”
  • Who permits septicCounty (with conditions)

    On-site sewage disposal inside Dana town, administered by the Vermillion County Health Department.

    • The county page states that it enforces state and local on-site sewage rules in Vermillion County; Dana's town sewer ordinance also imposes additional local requirements for private sewage disposal.
    “The Vermillion County Health Department enforces all state and local rules”
  • Septic permitRequired

    New, added, repaired, or upgraded septic systems inside Dana town, with the permit issued by Vermillion County Health Department.

    • The county health permit must be obtained before septic construction and before obtaining a construction permit from the Vermillion County Planning and Building Office; Dana's town ordinance separately requires a written Superintendent permit for private sewage disposal.
    “A permit from this office must be obtained before any construction begins”
  • Septic inspectionRequired

    Private sewage disposal systems used inside Dana town where public sanitary sewer is unavailable.

    • The town Superintendent may inspect at any construction stage; the permit applicant must notify the Superintendent when ready for final inspection and before underground portions are covered; inspection is to occur within 24 hours of notice.
    • The system must comply with state Board of Health recommendations and cannot use subsurface soil absorption where the lot is under 20,000 square feet.

    minimum lot area for subsurface soil absorption: >= 20000 square feet (No permit shall be issued for a private sewage disposal system employing subsurface soil absorption facilities where the area of the lot is less than 20,000 square feet.) · final inspection timing: <= 24 hours (After notice that the work is ready for final inspection.)

    “The inspection shall be made within 24 hours”
  • Off-grid sanitationLimited

    Private sewage disposal used inside Dana town when public sanitary sewer is unavailable.

    • Written permit signed by the Superintendent is required before construction.
    • The permit is not effective until installation is completed to the Superintendent's satisfaction.
    • The system must comply with state Board of Health recommendations.
    • Subsurface soil absorption systems are barred on lots under 20,000 square feet.
    • No septic tank or cesspool may discharge to a natural outlet.
    • Connection to public sewer is required within 60 days after it becomes available.

    minimum lot area for subsurface soil absorption: >= 20000 square feet (No permit shall be issued where the lot is less than 20,000 square feet.) · public sewer connection deadline: 60 days (After public sewer becomes available.)

    “The type, capacities, location, and layout of a private sewage disposal system shall comply with all recommendations of the state’s Board of Health. No permit shall be issued for any private sewage disposal system employing subsurface soil absorption facilities where the area of the lot is less than 20,000 square feet. No septic tank or cesspool shall be permitted to discharge to any natural outlet.”
  • Mandatory utility hookupSewer (with conditions)

    Buildings inside Dana town when a public sanitary sewer is available.

    • When public sewer becomes available, connection is required within 60 days; private sewage facilities must be abandoned and filled with suitable material.
    • When public sewer is unavailable, the building sewer must connect to a permitted private sewage disposal system.
    • The reviewed provisions do not establish a mandatory public-water connection rule.

    connection deadline after public sewer availability: 60 days

    “connected to the public sewer within 60 days”
  • Permit feesPublished (with conditions)

    Dana demolition permits.

    • Normal demolition permit fee is $5 plus utility-facility moving costs.
    • A $250 late fee plus utility-facility moving costs applies when demolition begins without a permit.
    • Liability insurance is strongly encouraged, not stated as mandatory.

    demolition permit fee: 5 USD (Plus costs for moving town utility facilities.) · late demolition permit fee: 250 USD (Plus costs for moving town utility facilities.)

    “The applicant shall pay the Clerk-Treasurer a permit fee of $5”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Dana or Vermillion County directly.

  • Owner-builder exemption — Owner-built construction inside Dana town limits.
  • Certificate of occupancy — Buildings inside Dana town limits.
  • Local zoning — Land inside Dana town limits.
  • Zoning districts — Zoning districts inside Dana town limits.
  • Minimum dwelling size — Dwellings inside Dana town limits.
15 more unanswered
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Dana publishes no rule on the point, not that none exists. Vermillion County’s page lists the county offices to call.

← All of Vermillion County: county rules, score and offices