Greenville Township, Indiana requires building permits for new homes, additions, renovations and accessory structures through Floyd County Building & Development Services.1 In Floyd County, county zoning governs unincorporated township land and excludes the incorporated Town of Greenville; town planning and building applications go through the Floyd County Plan Commission with the Greenville Town Council.23 Septic permits throughout Greenville Township come from the Floyd County Health Department.4
At a glance
- Building permits
- Required for new homes, additions, renovations and accessory structures; Floyd County issues them.1
- Zoning
- County ordinance on unincorporated township land; separate Greenville town ordinance inside incorporated limits.23
- Septic permits
- Floyd County Health Department issues septic permits and conducts inspections.4
- RV living
- Living, sleeping or housekeeping in a parked or stored RV is prohibited on unincorporated township land.5
- Minimum home size
- RR district: minimum ground-floor area of 950 square feet on unincorporated township land.6
- Minimum lot size
- Unincorporated AR district: 2 acres; RR district: 37,000 square feet.78
- Water
- New primary residences in unincorporated AR and RR districts must connect to public water.9
Who to call
Building permits
Floyd County Department of Building & Development Services
Building permits, plan review and inspections
Pine View Government Center 2524 Corydon Pike, Suite 203 New Albany, IN 47150
Zoning
Zoning administration, development review, appeals and variances
Pine View Government Center 2524 Corydon Pike, Suite 203 New Albany, IN 47150
Zoning
Town of Greenville — Planning and Zoning
Town zoning and building applications coordinated with the Floyd County Plan Commission; town ordinance applies inside incorporated limits.
9706 Clark Street Greenville, IN 47124
Septic permits
Floyd County Health Department
Septic permits, inspections and site approvals throughout Greenville Township.
1917 Bono Road New Albany, IN 47150
Roads & driveways
Floyd County Highway & Public Works
County-road access questions and road maintenance.
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Greenville Township means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Greenville Township, IN?
Greenville Township requires a building permit for a new single-family dwelling, addition, renovation or rehabilitation, and accessory structures such as garages and pools.1 Residential construction is subject to the 2020 Indiana Residential Code.10 A new dwelling application needs Health Department approval or a sewer tap-in receipt, and a new single-family home needs a site plan prepared by an Indiana-licensed surveyor or engineer.1
The published dwelling building-permit fee is $200 plus $0.15 per square foot of floor area; inspections cost $50 each and residential re-inspections cost $75.11 Starting construction before the building permit is issued incurs twice the permit amount.11 Ask Building & Development Services about any proposed owner-builder exemption; we could not confirm one.
Who handles building permits and zoning in Greenville Township?
For Greenville Township building permits, contact Floyd County Building & Development Services at (812) 981-7611, at Pine View Government Center, 2524 Corydon Pike, Suite 203, New Albany, IN 47150.112 The Floyd County Plan Commission accepts project applications at [email protected] and encourages a pre-submission meeting.13
Inside the incorporated Town of Greenville, the town’s own planning page directs all building applications and questions to the Floyd County Plan Commission, working in conjunction with the Greenville Town Council.3 That shared counter does not make county zoning the town’s ordinance: the county ordinance excludes incorporated Greenville.2 Septic permitting remains with the Floyd County Health Department throughout Greenville Township.4
Does Greenville Township have zoning, lot-size rules and setbacks?
County zoning applies to unincorporated Greenville Township, while incorporated Greenville is excluded from the county ordinance.2 Ask the Floyd County Plan Commission to identify the parcel’s district before choosing a house footprint.13
On unincorporated township land, Agricultural-Residential (AR) requires a minimum lot area of 2 acres; Rural Residential (RR) requires 37,000 square feet.78 In RR, front setbacks are 60 feet on arterial, collector or local streets and 40 feet on subdivision streets; side setbacks are 10 feet each, with a 20-foot primary-structure rear setback and a 10-foot accessory-structure rear setback.14 RR limits combined primary structures, accessory structures and impervious surfaces to 35% lot coverage.15 These district standards describe unincorporated township parcels, so ask the shared planning counter for the town ordinance when the property is inside incorporated Greenville.23
How do septic permits work in Greenville Township?
Floyd County Health Department issues septic permits and inspects onsite sewage systems and site approvals in Greenville Township.4 Contact the environmental-health office at 812-948-4726 or [email protected], at 1917 Bono Road, New Albany, IN 47150.16 Most septic repairs and replacements also need permits; the published repair fee is $75 and the replacement fee is $100.17
Floyd County’s soil rating shows 0% rated “not limited” for conventional septic drain fields; that countywide screening figure supports getting a site evaluation and considering an engineered system, rather than assuming septic is impossible on a particular lot.18 Indiana requires a compliant onsite sewage system where a dwelling is not connected, or cannot connect, to sanitary sewer; drywells and cesspools are prohibited.19 Ask the Health Department about site approval before placing an outbuilding, pool or underground utility near an existing septic system, and consult the office before adding bedrooms.16
Can you live in an RV or tiny home in Greenville Township?
On unincorporated Greenville Township land, a parked or stored RV cannot be occupied or used for living, sleeping or housekeeping.5 Do not plan to use an RV as accommodation while building without resolving that prohibition with the Floyd County Plan Commission.513
In the unincorporated RR district, a dwelling must have at least 950 square feet of ground-floor area, so a smaller proposed primary home would not meet that district’s stated minimum.6 Residential construction also remains subject to Indiana’s residential code.10 We could not confirm a separate tiny-home occupancy rule or a camping-specific exception; ask the Plan Commission about the exact structure and proposed use. Inside incorporated Greenville, ask the same counter to apply the town ordinance rather than these county RV and RR standards.23
Building a home in Greenville Township: what should you do first?
- Establish whether the parcel is unincorporated township land or inside incorporated Greenville, then ask the Floyd County Plan Commission which ordinance and district apply.23
- Resolve water and wastewater before finalizing the design: new primary residences in unincorporated AR and RR must connect to public water, while those districts allow septic or sanitary sewer.9
- Assemble Health Department approval or a sewer tap-in receipt, the detailed site plan, deed or purchase contract, and building plans; new single-family dwellings require a surveyor- or engineer-prepared site plan.20
- Submit the building-permit application by email or in person, and obtain the building permit before starting construction.2011
For land outside the township, see the Floyd County guide for the county’s unincorporated-area zoning jurisdiction.2
What should you check before buying land in Greenville Township?
For a proposed private well in Greenville Township, ask Floyd County Health Department about local requirements: Indiana’s well guidance says some local health departments require construction or pump permits, without identifying which departments, and well drillers must be licensed by Indiana DNR.21 A well proposal does not replace the public-water connection requirement for new primary residences in unincorporated AR and RR.9
Ask the planning counter to identify the Floodplain Administrator and confirm local floodplain approval for the parcel; we could not confirm a complete township-specific determination. Indiana DNR has jurisdiction over most floodway development, while floodplain-fringe projects can still need local approval despite having no state fringe permit.2223 For county-road access questions, contact Floyd County Highway & Public Works at 812-923-3041; the department maintains county roads.24 Driveway connections to Indiana state highways require permission through INDOT’s Electronic Permit System.25
Watch-outs
- County RV restrictions and the AR/RR district figures apply to unincorporated Greenville Township; incorporated Greenville uses a separate ordinance through the shared planning counter.23
- Public water is required for new primary residential construction in unincorporated AR and RR even where septic is allowed.9
- We could not confirm owner-builder exemptions, accessory-dwelling occupancy or a township-wide short-term-rental rule; ask the Floyd County Plan Commission before relying on those uses.13
Sources
- Floyd County Building Permit Processes (Greenville Township), quoted and re-checked
- Floyd County Zoning Ordinance (Greenville Township), quoted and re-checked
- Town of Greenville — Planning and Zoning (visitgreenvillein.com)
- Floyd County Health Department: Septic Systems (Greenville Township), quoted and re-checked
- Floyd County Zoning Ordinance (Greenville Township), quoted and re-checked
- Floyd County Zoning Ordinance (Greenville Township), quoted and re-checked
- Floyd County Zoning Ordinance (Greenville Township), quoted and re-checked
- Floyd County Zoning Ordinance (Greenville Township), quoted and re-checked
- Floyd County Zoning Ordinance (Greenville Township), quoted and re-checked
- Rules of the Indiana Fire Prevention and Building Safety Commission (Greenville Township), quoted and re-checked
- Floyd County Building Fees (Greenville Township), quoted and re-checked
- Floyd County Department of Building & Development Services (in.gov)
- Floyd County Plan Commission (in.gov)
- Floyd County Zoning Ordinance (Greenville Township), quoted and re-checked
- Floyd County Zoning Ordinance (Greenville Township), quoted and re-checked
- Floyd County Health Department (in.gov)
- Floyd County Health Department: Septic Systems, quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- 410 IAC 6-8.3 Residential On-Site Sewage Systems (Indiana statewide rule), quoted and re-checked
- Floyd County Building Permit Processes (Greenville Township), quoted and re-checked
- Recommended Standards For Private Water Wells (Indiana statewide rule), quoted and re-checked
- Water: Community Assistance & Information (Indiana statewide rule), quoted and re-checked
- Water: Community Assistance & Information (Indiana statewide rule), quoted and re-checked
- Floyd County Highway & Public Works (in.gov)
- INDOT Driveway Permit Guide 2024 (Indiana statewide rule), quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.