Building permits, zoning and septic rules in Bartholomew County, Indiana

52Index Score / 100
#62 of 92 in Indiana

Unincorporated Bartholomew County, Indiana requires a building permit before covered construction, alteration or repair costing more than $300; Technical Code Enforcement issues building permits1. County zoning applies within the county plan commission’s jurisdiction, excluding incorporated areas and municipal planning jurisdictions2. Septic permits for homes without sanitary sewer come from the Bartholomew County Health Department3,4.

Do you need a building permit in Bartholomew County, Indiana?

Unincorporated Bartholomew County requires a building permit before construction, alteration or repair costing more than $300.

Unincorporated Bartholomew County requires a building permit before construction, alteration or repair costing more than $3001. New homes, accessory buildings larger than 200 square feet, in-ground pools, and above-ground pools on lots smaller than 2 acres require a surveyor-certified site plan1. The published fee for a new one- or two-family dwelling is $200 plus $0.10 per square foot of gross floor area, including attached garage/carport and basement; that fee includes all required permits8. Confirm the current charge with Technical Code Enforcement because the posted code compilation may lag legislation8. An owner-occupant doing the work personally can file an Owner Occupant Sign-Off, but building permits and inspections still apply7. Columbus has its own building-permit requirement; Edinburgh, mainly in Johnson County but extending into Bartholomew County, issues its own building permits9,10. Septic administration remains with the Bartholomew County Health Department for county addresses4.

Who is the Bartholomew County building department, and how do you reach them?

The Department of Technical Code Enforcement of Columbus/Bartholomew County issues building permits, reviews plans, assigns addresses, and answers code, floodplain and permit-record questions.

The Department of Technical Code Enforcement of Columbus/Bartholomew County issues building permits, reviews plans, assigns addresses, and answers code, floodplain and permit-record questions1. Call 812-379-1535 for building-permit questions or inspections, which require 24-hour advance scheduling1. Bartholomew County has adopted a building code1. All fees and fines must be paid before a final building inspection is scheduled, and occupancy must wait for that inspection1. An improvement requiring an Improvement Location Permit also needs successful final site and building inspections and a certificate of occupancy from the Chief Code Enforcement Officer before use2. For zoning and subdivision questions, contact the Columbus-Bartholomew County Planning Department at 812-376-2550 or planning@columbus.in.gov11.

Does Bartholomew County, Indiana have zoning?

County zoning governs unincorporated Bartholomew County within the county plan commission’s jurisdiction, excluding municipal planning jurisdictions.

County zoning governs unincorporated Bartholomew County within the county plan commission’s jurisdiction, excluding municipal planning jurisdictions2. Columbus sets its own zoning, as does Edinburgh, a town mainly in Johnson County that reaches into Bartholomew County12,13. Septic administration remains with the Bartholomew County Health Department for county addresses4. The joint district has separately adopted zoning; Hartsville contracts with the county to administer Hartsville’s zoning and subdivision rules11. Use the official zoning map to identify the district before applying dimensional standards2. In Agricultural: Voluntary Protection, nonagricultural structures have 25% maximum lot coverage and primary structures a 40-foot height limit2. In Commercial: Professional Office (CO), maximum coverage is 65%, primary/accessory height limits are 40/25 feet, and side and rear setbacks are 10 feet14. CO front setbacks vary by road or street classification and vehicle-access features14.

How do septic permits work in Bartholomew County?

The Bartholomew County Health Department administers onsite sewage and provides the county's permit, extension, and subdivision forms.

The Bartholomew County Health Department administers onsite sewage and provides the county's permit, extension, and subdivision forms4. A dwelling that will not connect to sanitary sewer needs a written septic construction permit signed by the health officer before a new system, replacement, expansion, alteration, or repair3. The application includes property and bedroom information, an onsite soils evaluation, plans, and any other information the health officer requires; the local health department must issue or deny it in writing within 45 days after receiving the application and plans3. Published fees are $200 for a new system permit, $100 for a repair permit, and $50 for a minor repair15. Only about 0.2% of county soils are rated without severe limitations for a conventional drain field, so make sewage feasibility an early purchase contingency16.

Can you live in an RV or tiny home on your land in Bartholomew County?

In unincorporated Bartholomew County, a primary tiny home in a single-family residential district generally needs 950 square feet if manufactured or 1,000 if site-built, with RE district exceptions.

In unincorporated Bartholomew County, a primary tiny home in a single-family residential district generally needs 950 square feet if manufactured or 1,000 if site-built, with RE district exceptions5. Agricultural: Voluntary Protection has a 1,000-square-foot dwelling minimum, subject to its manufactured-home provision2. Outside manufactured-home communities, manufactured homes are allowed only where single-family dwellings are allowed; mobile homes are prohibited2. Manufactured homes must meet installation, anchoring, travel-equipment removal, utility and applicable district standards2. An ADU requires conditional-use approval; residential ADUs have a 400-square-foot minimum and a maximum of 1,000 square feet or 65% of the primary home, whichever is less6. Only 1 ADU is allowed per property, without an additional driveway, using public sewer or Health Department-approved septic arrangements2. The campground/RV-park provisions cover short-term or seasonal occupancy and do not establish permission for year-round RV dwelling on private land14. We could not confirm temporary camping on a private lot; ask Planning about the proposed use11.

Building a home in Bartholomew County: what are the steps, in order?

Confirm which zoning authority governs the parcel, then use the official map to identify its district and allowed use.

  1. Confirm which zoning authority governs the parcel, then use the official map to identify its district and allowed use2.
  2. Check the district's lot size, setbacks, lot coverage, height, and utility rules before fixing the site plan2,17.
  3. If the home will not connect to sanitary sewer, complete the soils evaluation and obtain the written septic construction permit before settling the layout3.
  4. Submit the planning application through the OpenGov services portal with each property owner's authorization, and obtain any applicable driveway or utility-connection approval1,17.
  5. Apply to Technical Code Enforcement before starting covered work costing more than $3001.
  6. Pay all fees and fines before scheduling the final building inspection, complete required inspections and obtain the certificate of occupancy before using or occupying an improvement that required an Improvement Location Permit1,2.

What should you check before you buy land in Bartholomew County?

In Bartholomew County’s Agricultural: Preferred and Agricultural: General Rural districts, a septic-served lot generally needs at least 1 acre or enough area for 2 viable septic sites, whichever is greater.

In Bartholomew County’s Agricultural: Preferred and Agricultural: General Rural districts, a septic-served lot generally needs at least 1 acre or enough area for 2 viable septic sites, whichever is greater2. Only about 0.2% of county soils are rated without severe limitations for conventional drain fields, making sewage feasibility an early purchase concern16. RM Residential Multi-Family and CO Commercial: Professional Office require public water and sewer, so a well and septic system cannot simply replace those connections14,18. Indiana’s high-capacity-well guidance generally requires no state permit except in the Great Lakes Basin, but significant-withdrawal registration may apply; that guidance does not settle a domestic-well project’s requirements19. Ask Planning about floodplain development approval and minor-subdivision plat, physical-features and sewage documentation before buying or dividing land20,21. Agricultural accessory-structure zoning exemptions do not waive other applicable building, health, septic or floodplain rules2.

Watch-outs

  • County zoning stops at incorporated areas and municipal planning jurisdictions; ask Planning which authority governs the parcel2,11.
  • All development in a regulated Bartholomew County floodplain requires a local permit, and local rules are more restrictive than federal and state minimums20.
  • Bartholomew County short-term rentals with 6 or more unrelated occupants are treated as shared housing, requiring conditional-use review in most districts; parking and septic capacity also matter22.
  • The ordinance describes RV occupancy only as short-term or seasonal campground use and does not establish year-round RV living on a private lot; we could not confirm a temporary-camping rule, so ask Planning about the parcel11,14.

Sources

22 official pages, each quoted and re-checked · written October 12, 2026

Found land here? Start a Property Hunt →

Compared with neighboring counties

Like all 6 of its neighbors, Bartholomew County requires a building permit for a home.

RuleBartholomew CountyBrown CountyJohnson CountyDecatur CountyShelby CountyJennings CountyJackson County
Building permitRequiredRequiredRequiredRequiredRequiredRequiredRequired
County zoningYesYesYesYesYesYesYes
Septic permitsCounty Health Dept.County Health Dept.County Health Dept.County Health Dept.County Health Dept.County Health Dept.County Health Dept.

County locator

Bartholomew County in Indiana

52
County map
Bartholomew County highlighted among the Indiana counties · colored by Index score

How Bartholomew County scores

52 / 100 · #62 of 92 in Indiana · six factors, land price, tax, rain and climate

Seclusion20100% ev.
Self-Sufficiency70100% ev.
Admin Boringness4190% ev.
Durability71100% ev.
Property Autonomy71100% ev.
Carry Cost77100% ev.

Evidence strength: 98%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$279kTypical home
0.7%Property tax
$6,180Land / acre
46.8"Annual rain
3.6% of yrsSevere drought
4.4 / yr (+4.2)Mid-century 100°F days
13.4 daysMid-century dry spell
1.86" (+8.2%)Mid-century 1-day rain
1.84×Wildfire change factor
100%Forward climate coverage
$1,416Home insurance / yr
1% / yrInsurance growth
0.93%Nonrenewal rate
county median (2+ published ZIPs)Insurance basis
111,099People within 30 min
6,765,768People within 2 hr
103,572Radius comparison (15 mi)
206.4People / sq mi
10%Federal land
91.6%Land at 15% slope or less
0.2%Soils rated "not limited" for septic (strict USDA rating)
511 acWorkable land screen
33.1%Wooded land
70.7 tonsBiomass / forest ac
53.8°FAvg temp

Scout Bartholomew County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Bartholomew County. Listing sites control their own results and filters.

Sell land in Bartholomew County? Be the only seller on this page →

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Cities and towns in Bartholomew County

Inside a city or town, that city usually issues building permits and sets zoning; the county’s rules above cover unincorporated land. Septic, wells and floodplain rules usually stay with the county or state everywhere.

Not yet covered: Town of Clifford · Town of Elizabethtown · Town of Jonesville · Wayne Township

Answers from the rulebook for Bartholomew County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Bartholomew County rules

  • Building permitRequired

    Construction, alteration, or repair of a building or structure costing more than $300 in Bartholomew County jurisdiction.

    • A permit is required before beginning the covered work.
    • The page lists additional items that may be required, including construction plans, site plan, septic health release if applicable, driveway permit if applicable, state design release for commercial work, and zoning compliance certificate.
    • New homes, new accessory buildings larger than 200 square feet, in-ground pools, and above-ground pools on lots less than two acres require a certified surveyor site plan.

    permit cost threshold: > 300 USD · accessory building site-plan threshold: > 200 square feet · pool site-plan lot-size threshold: < 2 acres

    “A permit shall be obtained before beginning construction, alteration or repair of any building or structure, the cost of which exceeds Three Hundred Dollars ($300.00)”
  • Owner-builder exemptionAvailable (with conditions)

    An owner and occupant performing building/framing, mechanical/heat and air, electrical, or plumbing work on a project administered by the Columbus/Bartholomew County Department of Technical Code Enforcement.

    • The owner must accept responsibility for compliance with the Indiana Residential, Electric, Plumbing, and Mechanical Codes, Bartholomew County Codes, City of Columbus Codes, and other applicable regulations.
    • The owner must perform the work in a good and workmanlike manner consistent with accepted trade standards and practices.
    • The owner must complete the work personally and attest that they will not employ or pay anyone for the stated work.
    • If the owner hires someone to perform stated work, the owner must notify the Department and have the person submit the proper paperwork and sign-off sheets.
    • Required inspections remain applicable; failure to complete work necessary for an inspection or failure to request a required inspection may result in substantial fines.
    • The county's general permit rule still requires a permit before covered construction, alteration, or repair begins.

    covered work categories: building/framing; mechanical/heat and air; electrical; plumbing

    “I attest that I will not employ or pay anyone for the work I have stated I will be performing. I will complete the work myself. If I hire someone to perform any of the work I have stated I am doing, I agree to notify the Department of Technical Code Enforcement; and have the person I am hiring submit the proper paper work and Sign-off sheets to the Department of Technical Code Enforcement.”
  • Building code adoptedAdopted (with conditions)

    Construction governed by the Building Code of Bartholomew County.

    • The quoted page also references the separate Building Code of the City of Columbus.
    • The quoted permit threshold applies to construction, alteration, or repair costing more than $300.

    construction cost threshold: > 300 USD

    “The "Building Code of Bartholomew County, Indiana", and the "Building Code of the City of Columbus, Indiana", both state:”
  • InspectionsRequired

    Projects handled by the Bartholomew County Department of Technical Code Enforcement, including new single-family homes, additions, garages, barns, and interior remodeling.

    • The page states the office provides building permits and inspections; project-specific inspection requirements may vary.
    “Final Inspections: All fees and fines must be paid before final inspection will be scheduled. Do not occupy before this inspection”
  • Certificate of occupancyRequired

    Improvements requiring an Improvement Location Permit before occupancy or use.

    • The improvement must first have a legally obtained Improvement Location Permit.
    • All required inspections, including final site and building inspections, must be successfully completed.
    • The Chief Code Enforcement Officer issues the certificate if the improvements comply with the zoning ordinance, subdivision control ordinance, building code, and other applicable requirements.
    • A limited or temporary certificate may be issued at the Chief Code Enforcement Officer's discretion.
    “obtaining a Certificate of Occupancy from the Chief Code Enforcement Officer.”
  • County-wide zoningPresent (with conditions)

    Zoning regulation adopted by Bartholomew County for land within the jurisdiction of the Bartholomew County Advisory Plan Commission.

    • The ordinance is separately adopted by Bartholomew County, the City of Columbus, and the Edinburgh / Bartholomew / Columbus Joint District.
    • Bartholomew County does not exercise jurisdiction over incorporated areas or areas within an incorporated area's plan commission jurisdiction.
    “This Ordinance is adopted by Bartholomew County for all land within the jurisdiction of the Bartholomew County Advisory Plan Commission”
  • Local zoningVaries (with conditions)

    Local zoning across Bartholomew County.

    • The ordinance is adopted independently by Bartholomew County, the City of Columbus, and the Edinburgh / Bartholomew / Columbus Joint District.
    • Bartholomew County does not exercise jurisdiction over property within an incorporated area or within the jurisdiction of an incorporated area's plan commission.
    • Hartsville contracts with Bartholomew County for administration of Hartsville zoning and subdivision regulations.
    “The Town of Hartsville maintains a contract with Bartholomew County for the administration of the Town’s zoning and subdivision regulations.”
    2 more reviewed findings on this topic
    • Varies (with conditions) — County aggregate of zoning administered by Bartholomew County, Columbus, the Edinburgh/Bartholomew/Columbus Joint District, and Hartsville.
      “The Town of Hartsville maintains a contract with Bartholomew County for the administration of the Town’s zoning and subdivision regulations.”
    • Varies (with conditions) — Aggregate county record for local zoning: zoning controls vary among Bartholomew County, the City of Columbus, and the Edinburgh / Bartholomew / Columbus Joint District.
      “Bartholomew County shall not exercise jurisdiction over any property within an incorporated area or within the jurisdiction of an incorporated area's plan commission”
  • Zoning districtsPublished

    Zoning districts and official zoning maps within the applicable Bartholomew County zoning jurisdiction.

    • The ordinance identifies districts including AV, AP, AG, RR, RS1-RS4, RE, RT, RM, RMH, CD, CDS, CN, CO, CC, CR, P, I1, I2, and I3.
    • District applicability depends on the jurisdiction and official zoning map.
    “the planning jurisdiction subject to this Ordinance is divided into the following zoning districts.”
    One more reviewed finding on this topic
    • Published — Bartholomew County zoning districts and official zoning maps.
      “Article Three: Zoning Districts [...] 3.4 Agriculture: Voluntary Protection (AV) [...] 3.15 Residential: Manufactured Home Park (RMH)”
  • Minimum dwelling sizeSpecified

    Dwellings in the Agricultural: Voluntary Protection zoning district.

    • The cited numeric standard is district-specific and does not establish one countywide minimum for every zoning district.

    minimum living area per dwelling: 1000 square feet (Section 6.7(A)(2)(a) applies to manufactured homes)

    “Minimum Living Area per Dwelling • 1,000 square feet”
    One more reviewed finding on this topic
    • District specific (with conditions) — Tiny or other primary dwellings in county single-family residential zoning districts.
      “It has a minimum living area of 950 sq. ft. (if a manufactured home) or 1,000 sq. ft. (if built on site), with exceptions in the RE zoning district.”
  • Minimum lot sizeSpecified

    Lots in the Agricultural: Preferred and Agricultural: General Rural zoning districts.

    • For septic service, the minimum is one acre or the amount required to provide two viable septic sites in the opinion of the Bartholomew County Health Department, whichever is greater.
    • Subdivision parent-tract remainders over five acres need not demonstrate septic suitability.
    • For sewer service, the minimum is one acre.

    minimum lot area: >= 1 acre (or as required to provide two viable septic system sites, whichever is greater) · septic suitability exception: > 5 acres (subdivision parent tract remainders need not demonstrate septic suitability)

    “Septic System: 1 acre (43,560 sq. ft.), or as required to provide two viable septic system sites”
  • SetbacksSpecified

    Agricultural: Voluntary Protection zoning district.

    • The cited setbacks vary by road classification and structure type.

    arterial front setback: 50 feet · collector front setback: 30 feet · local front setback: 25 feet · agricultural-structure side/rear setback: 30 feet · primary-structure side/rear setback: 30 feet · accessory-structure side/rear setback: 15 feet

    “Arterial Street or Road: 50 feet • Collector Street or Road: 30 feet • Local Street or Road: 25 feet”
    One more reviewed finding on this topic
  • Lot coverageSpecified

    Agricultural: Voluntary Protection zoning district.

    • Agricultural structures have no maximum lot-coverage limit in the cited district.
    • Non-agricultural structures are limited to 25% lot coverage.

    non-agricultural maximum lot coverage: 25 percent

    “Maximum Lot Coverage • Agricultural Structures: None • Non-Agricultural Structures: 25%”
    One more reviewed finding on this topic
    • Specified — CO Commercial: Professional Office zoning district within the Bartholomew County jurisdiction.
      “Maximum Lot Coverage • 65% Minimum Front Setback • Arterial Road: 50 feet • Arterial Street: 10 feet*”
  • Building heightSpecified

    Agricultural: Voluntary Protection zoning district.

    • The cited height limits vary by structure type.
    • Agricultural structures have no maximum height in the cited district.

    primary-structure maximum height: 40 feet · accessory-structure maximum height: 35 feet

    “Maximum Height • Agricultural Structure: None • Primary Structure: 40 feet • Accessory Structure: 35 feet”
    One more reviewed finding on this topic
  • Living in an RVTemporary only (with conditions)

    Occupancy of recreational vehicles at campgrounds or RV parks in the Bartholomew County zoning jurisdiction.

    • The ordinance defines a campground as providing short-term and/or seasonal occupancy by recreational vehicles and other camping equipment.
    • The zoning use matrix lists campground / RV park as a conditional use in the AV, AP, AG, and RR zoning districts shown in the table.
    • The cited provisions do not establish permission for permanent or year-round RV dwelling occupancy.
    • Mobile homes are excluded from the campground definition.
    • Other applicable requirements, including septic, floodplain, building, and development regulations, may apply.

    occupancy duration: short term and/or seasonal (definition excludes mobile homes)

    “Campground: Any site, lot, field, or tract of land designed with facilities for short term and/or seasonal occupancy by recreational vehicles and other camping equipment, but not including mobile homes. [...] campground / RV park C C C C”
  • Tiny homesLimited

    Tiny homes on properties in the City of Columbus and Bartholomew County.

    • As a primary home, a tiny home is subject to zoning-district minimum living-area rules: 950 square feet if manufactured or 1,000 square feet if built on site, with exceptions in the RE zoning district.
    • As an accessory dwelling, conditional-use approval is required and residential districts impose 400-to-1,000-square-foot or 65%-of-primary-dwelling limits, whichever is less.
    • All homes must comply with applicable building and health codes.

    primary manufactured tiny-home minimum living area: >= 950 square feet (exceptions in RE zoning district) · primary site-built tiny-home minimum living area: >= 1000 square feet (exceptions in RE zoning district)

    “It has a minimum living area of 950 sq. ft. (if a manufactured home) or 1,000 sq. ft. (if built on site), with exceptions in the RE zoning district.”
    One more reviewed finding on this topic
    • Limited — Tiny homes used as primary homes, accessory dwellings, multi-family villages, or manufactured-home-community homes.
      “As the Primary Home on a Lot (in any single-family residential zoning district) It has a minimum living area of 950 sq. ft. (if a manufactured home) or 1,000 sq. ft. (if built on site), with exceptions in the RE zoning district.”
  • Manufactured homesLimited

    Manufactured homes and industrialized residential structures in agricultural, single-family residential, and multi-family residential zoning districts.

    • Manufactured homes and industrialized residential structures must meet manufacturer installation instructions and the listed ordinance requirements.
    • Outside mobile/manufactured home communities, manufactured homes and industrialized residential structures are permitted only where a single-family dwelling is allowed; mobile homes are prohibited outside such communities.
    • Outside communities, minimum living area is the applicable zoning-district requirement or 950 square feet, whichever is less.
    • Other applicable single-family-dwelling requirements, including setbacks, utilities, lot sizes, dimensions, and parking, must be met.
    • Homes must be anchored, have travel equipment removed, and have utility connections compliant with the local Building Code.

    minimum living area outside manufactured-home community: 950 square feet (or the applicable zoning-district minimum, whichever is less)

    “Mobile homes shall be prohibited in locations outside of mobile / manufactured home communities.”
    One more reviewed finding on this topic
    • Limited — Manufactured homes and industrialized residential structures in county zoning districts and manufactured-home communities.
      “It has a minimum living area of 950 sq. ft. (if a manufactured home) or 1,000 sq. ft. (if built on site), with exceptions in the RE zoning district.”
  • Accessory dwellingsLimited

    Accessory dwellings in residential and agricultural zoning districts.

    • In residential districts, minimum living area is 400 square feet and maximum is the lesser of 1,000 square feet or 65% of the primary residence.
    • In agricultural districts, maximum area is 75% of the primary residence, except a historic home retained as an accessory dwelling is exempt from the living-area limit if at least 50 years old.
    • Only one accessory dwelling may be permitted on a property.
    • The primary residence and accessory dwelling must use public sewer or one shared/two individual septic systems approved by the Bartholomew County Health Department.
    • The accessory dwelling may not require an additional driveway.

    residential minimum living area: >= 400 square feet · residential maximum living area: <= 1000 square feet (or 65% of primary residence, whichever is less) · maximum accessory dwellings: 1 dwelling per property

    “A maximum of 1 accessory dwelling may be permitted on any property.”
    One more reviewed finding on this topic
    • Allowed (with conditions) — Accessory dwelling units in agriculture and single-family residential zoning districts.
      “Accessory Dwellings are a conditional use in agriculture and single-family residential zoning districts.”
  • Who permits septicCounty (with conditions)

    Onsite sewage and wastewater disposal administration by the Bartholomew County Health Department.

    • The page provides county onsite sewage forms, including a permit application, a septic permit extension application, and a subdivision application checklist.
    • Specific inspection and approval duties were not stated in the page text opened.
    “Permit Application for On Site Wastewater Disposal System”
  • Septic permitRequired

    Residential onsite sewage systems for dwellings or residences not connected to sanitary sewerage, including new construction, manufactured/mobile/modular home placement, plumbing outbuildings, replacements, expansions, alterations, repairs, and installations for existing residences without a system.

    • A written construction permit signed by the health officer is required before the listed work.
    • The application must include owner/property information, bedroom and bedroom-equivalent count, an onsite soils evaluation, clear written plans, and other information deemed necessary by the health officer.
    • The local health department must issue or deny the permit in writing within 45 days of application and plan submittal.
    • No construction may occur after site disturbance until a new evaluation and modified permit are issued.

    permit decision deadline: 45 days (from receipt of application and plan submittal)

    “For any dwelling or place of residence that will not be connected to a sanitary sewerage system, the owner or agent of the owner shall obtain a written construction permit, signed by the health officer”
  • Mandatory utility hookupConditional

    Development and building projects in Bartholomew County that may require local utility connection authorization.

    • The Planning Department page states that a project may also require utility connection authorization; the requirement is project-specific.
    “your project may also require additional local approvals, such as a building permit, storm water permit, or utility connection authorization.”
    One more reviewed finding on this topic
    • Water and sewer (with conditions) — RM Residential Multi-Family zoning district in the Bartholomew County jurisdiction.
      “Utility Requirements: Public water and sewer systems shall be required. In addition, the water system shall provide adequate fire fighting capacity, based on the standards of the Fire Department of jurisdiction.”
  • Agricultural exemptionAvailable (with conditions)

    Agricultural structures on properties where a farm is the primary use.

    • The exemption applies to requirements for accessory structures under the zoning ordinance.
    • Other building, health, septic, floodplain, subdivision, and applicable regulations may still apply.
    “Agricultural structures shall be exempt from the requirements of this Ordinance for accessory structures.”
  • Subdividing landRegulated (with conditions)

    Minor subdivisions under the Bartholomew County Subdivision Control Ordinance.

    • Applications require a plat drawing and physical-features map.
    • Required materials include filing fee, application, requested modifications, sewer-service evidence or sewage certificate, design-standard documentation, and applicable erosion, drainage, highway-access, floodway, easement, right-of-way, and certificate information.
    “All minor subdivision applications must be accompanied by the plat drawing and the physical features map for review by the Plat Committee.”
    One more reviewed finding on this topic
  • Driveway accessLimited

    Driveway access associated with building and development permits in Bartholomew County jurisdiction.

    • A driveway permit from the state or county highway department may be required if applicable.
    • Access points for temporary uses must meet requirements of the city or county engineer having jurisdiction.
    • Requirements may vary by street type and highway jurisdiction.
    “Driveway permit from state or county highway department, if applicable”
  • Building in a floodplainRequired

    Development in floodplain or flood hazard areas in Bartholomew County jurisdiction.

    • The local regulations are based on the National Flood Insurance Program, FEMA, and Indiana Department of Natural Resources minimum regulations.
    • Bartholomew County adopted more restrictive local floodplain regulations.
    • A local permit is required for all floodplain development.
    “Both Columbus and Bartholomew County have adopted more restrictive local floodplain regulations. [...] All Floodplain Development requires a local permit.”
  • Short-term rentalsLimited

    Short-term rentals in City of Columbus and Bartholomew County zoning jurisdictions.

    • The zoning ordinance does not specifically regulate short-term rentals, but the family definition limits unrelated occupants.
    • Five or fewer occupants may use any home with no zoning-related approval.
    • Six or more occupants are a shared housing facility and are a conditional use in most zoning districts, subject to case-by-case review.
    • Parking, septic capacity where applicable, neighbors, building/health/fire codes, and a 30-to-60-day conditional-use review process are identified considerations.
    • Columbus rental registration is required for rental properties but short-term rentals are exempt.

    occupant threshold for conditional shared-housing treatment: >= 6 occupants (five or fewer occupants require no zoning-related approval) · conditional-use review timeline: 30 to 60 days

    “The zoning ordinance does not specifically regulate short term rentals. However, through the definition of a “family” there are provisions governing the number of unrelated individuals that may occupy a home (including short term rentals).”
  • Permit feesPublished (with conditions)

    Building, remodeling, accessory-structure, manufactured-home, commercial, industrial, multiple-family, electrical, plumbing, mechanical, demolition, swimming-pool, relocation, reinspection, renewal, and related permits administered under Bartholomew County Chapter 150.

    • Fees vary by permit category and, for many categories, by gross floor area.
    • The residential fee schedule states that the listed one-and-two-family dwelling and manufactured-home fees include all required permits.
    • The commercial/industrial/multiple-family new-construction fee has a maximum permit fee of $10,000 and states that it includes all required permits.
    • Permit applications must be accompanied by payment of appropriate fees, plans/specifications, and, for new structures or extensions, a plot plan.
    • The code-library page identifies the compilation as 2026 S-12 current but cautions that the posted compilation may not reflect the most current legislation and that the official printed copy should be consulted.

    one- and two-family dwelling: 200 USD minimum (plus $0.10 per square foot of gross floor area including attached garage/carport and basement) · residential additions/remodeling: 150 USD minimum (plus $0.10 per square foot of gross floor area) · manufactured home: 150 USD minimum (plus $0.10 per square foot of gross floor area including attached garage/carport and basement) · accessory structure: 100 USD minimum (plus $0.10 per square foot of gross floor area) · commercial/industrial/multiple-family new construction: 400 USD minimum (plus $0.10 per square foot of gross floor area; maximum permit fee $10,000) · commercial/industrial/multiple-family additions/remodeling: 300 USD minimum (plus $0.10 per square foot of gross floor area) · permit renewal: 50% of original fee (one-year renewal; original permit good for two years) · starting work before permit: double original permit cost (minimum $5 penalty fee)

    “New, construction for multi-family structures, commercial structures or industrial structures. Minimum fee is $400, plus $0.10 per square foot of gross floor area, including attached garage or carport and the area of the basement with a maximum permit fee of $10,000 (this fee includes all required permits).”
  • Permit processPublished (with conditions)

    Planning applications for Columbus, Bartholomew County, and the Edinburgh / Bartholomew / Columbus Joint District.

    • Applications must be submitted through the City of Columbus Opengov services portal.
    • All applications require a completed property-owner authorization for each included property owner.
    • Pre-application meetings are required for Board of Zoning Appeals applications and major subdivision preliminary plats.
    • Application fees and property-owner consent must be provided by the applicable deadline; incomplete applications will not be processed.
    • The Opengov system began being used on November 17, 2025.
    “All applications, including those for projects in Columbus, Bartholomew County, and the Edinburgh / Bartholomew / Columbus Joint District must be submitted using the City of Columbus Opengov services portal”

Indiana rules that apply here

  • Camping on your landLimited

    A campground operating as a temporary campground under 410 IAC 6-7.1; this is not a statewide determination for all camping on private land.

    • A temporary campground may operate no more than ten consecutive days per event.
    • A temporary campground may operate no more than thirty days in a calendar year.
    • Temporary campgrounds are under the jurisdiction of local health officers.
    • County and municipal authorities retain jurisdiction over zoning, building codes, and ordinances pertaining to campgrounds.

    maximum consecutive operating days per event: <= 10 days · maximum operating days: <= 30 days per calendar year

    “"Temporary campground" means a campground operated not more than ten (10) consecutive days per event and not more than thirty (30) days a calendar year.”
  • Septic inspectionLimited

    Commercial on-site sewage systems subject to a written operating permit issued by the Indiana Department of Health.

    • The department may require a written operating permit; the rule does not require one for every commercial on-site sewage system.
    • An operating permit identifies components requiring inspection and maintenance.
    • The owner must provide the department, within one month after performance, written documentation of all scheduled and unscheduled inspection and maintenance and a copy of the inspection-and-maintenance contract.
    • The operating permit may be revoked for violation of the owner's documentation duties.
    • Local ordinances may impose a commercial operating-permit requirement if it does not conflict with the state-issued operating permit.

    operating-permit renewal for systems with scheduled inspection components: per 3 years (Systems with components other than a septic tank requiring scheduled inspection and maintenance.) · operating-permit renewal for other systems: per 5 years (All other commercial on-site sewage systems.) · inspection documentation submission deadline: <= 1 month (After the date scheduled or unscheduled inspection and maintenance is performed.)

    “Sec. 54. (a) The department may require written operating permits as follows: (1) A written operating permit issued by the department shall be signed by the commissioner or his duly authorized representative. (2) An operating permit shall be renewed as follows: (A) At least once every three (3) years for on-site sewage systems having components, other than a septic tank, requiring scheduled inspection and maintenance. (B) At least once every five (5) years for all other on-site sewage systems.”
    One more reviewed finding on this topic
    • Limited — Residential on-site sewage systems constructed under a construction permit in Indiana.
      “(l) The permittee shall notify the health officer or his or her designee when the work is ready for final inspection: (1) using the procedure published by the local board of health; or (2) at least forty-eight (48) hours or two (2) working days before any subsurface portions are to be covered if the local health board has not published inspection procedures.”
  • Off-grid sanitationLimited

    Residential sanitation in Indiana where a dwelling is not connected, or cannot be connected, to a sanitary sewerage system.

    • The dwelling must be provided with a compliant residential on-site sewage system including a septic tank and a soil absorption system that has not failed.
    • A temporary sewage holding tank is subject to written Indiana Department of Health approval, with specified exceptions for failed systems, soil conditions after a construction permit, and certain district, utility, or municipal sewage plans.
    • A holding tank operated as a primary residential disposal method for a sewer connection plan is limited to not more than one year unless the period is extended upon documentation of satisfactory operation.
    • Drywells and cesspools are not allowed for construction or use as on-site sewage treatment in Indiana.

    holding-tank sewer-connection period: <= 1 year (may be extended upon documentation of satisfactory operation)

    “septic tank and a soil absorption system”
  • Well permitLimited

    Water wells serving property in Bartholomew County under Indiana state rules.

    • Generally no state permit is required for a high-capacity well unless located within the Great Lakes Basin.
    • A significant water withdrawal facility must be registered if capable of withdrawing at least 100,000 gallons per day.
    • Licensed drillers must submit a well record within 30 days after completion.

    significant water withdrawal threshold: >= 100000 gallons per day (registration requirement may apply) · well record submission deadline: 30 days (after completion)

    “Generally, no permit is required for a high-capacity water well (unless located within the Great Lakes Basin of Indiana); however, it may be necessary to register the well as a significant water withdrawal facility (SWWF).”
    One more reviewed finding on this topic
    • Limited — Construction of residential water-supply wells and installation of well pumps in Indiana.
      “Several local health departments now require that a permit be obtained before construction of a residential water supply well or installation of a well pump.”
  • Shed and accessory-building permit exemptionConditional

    State construction-design-release filing for a one-story detached accessory Class 1 structure in Group B, F, R, S, U, or M occupancy classifications.

    • The structure must not exceed 500 square feet.
    • The structure must be used as an equipment shelter, a tool and storage shed not used for storage or handling of hazardous materials, a freezer, a cooler, or another similar use.
    • The exemption is from the state design-release requirement, not from compliance with applicable codes or local permitting; Indiana DHS states that exempt work may require local permits.

    maximum floor area: <= 500 square feet (Only for a one-story detached accessory Class 1 structure in Group B, F, R, S, U, or M occupancy classifications and the enumerated/similar uses.)

    “One (1) story detached accessory Class 1 structures in Group B, F, R, S, U, or M [...] do not exceed five hundred (500) square feet”
  • Campground & park staysLimited

    Occupancy of manufactured homes as principal residences in Indiana mobile home communities and related state health-regulated settings.

    • The state statute recognizes mobile homes and manufactured homes as suitable and necessary dwelling units in Indiana.
    • A mobile home community is generally land with at least five mobile homes or manufactured homes occupied as principal residences, subject to the statutory definition and included parcel configurations.
    • County and municipal authorities retain jurisdiction regarding zoning and building codes and ordinances pertaining to mobile home communities.
    • A mobile home community may not be operated without a license from the state department.
    • Occupied homes in a mobile home community must be connected to the community sewerage system at all times.
    • Each residential shelter in a mobile home community must have toilet, sink, and bath or shower facilities and be connected to water supply and sewer service before occupancy.
    • Mobile home community sites must meet and receive approval under local zoning requirements before construction begins.

    mobile homes or manufactured homes for statutory mobile home community definition: >= 5 homes (The statute also includes certain parcels with fewer units when specified shared-road, water, or sewer/septic conditions apply.) · mobile home community license duration: 4 years (The license expires at midnight on December 31.) · public water system distance threshold: > 2000 feet (A mobile home community is not required to use a public water system if the system is more than 2,000 feet away.)

    “Every shelter occupied as a residence in a mobile home community, whether mobile or permanent, shall be: 1. equipped with toilet, sink, and bath or shower facilities; and 2. Connected to the water supply and sewer service; before occupancy.”
    5 more reviewed findings on this topic
    • Limited — Recreational vehicle occupancy at a regulated Indiana campground campsite, rather than residential occupancy on an individually deeded lot or other land outside the rule's campground definition.
      “No more than one (1) recreational vehicle or one (1) vacation mobile home”
    • Limited — Temporary campgrounds operated in Indiana.
      “not more than ten (10) consecutive days per event”
    • Limited — Occupancy of manufactured homes in Indiana, especially occupancy in mobile home communities subject to state health and sanitation standards and local zoning and building-code authority.
      “Mobile home community sites shall: 1. meet all requirements of the local zoning commission; and 2. be approved by the commission; before construction begins. (c) Every shelter occupied as a residence in a mobile home community, whether mobile or permanent, shall be: 1. equipped with toilet, sink, and bath or shower facilities; and 2. Connected to the water supply and sewer service; before occupancy.”
    • Limited — Recreational-vehicle placement at a designated campsite in an Indiana campground regulated under 410 IAC 6-7.1; this does not establish a statewide private-land residential-occupancy rule.
      “No more than one (1) recreational vehicle or one (1) vacation mobile home shall be allowed on a designated campsite at the same time.”
    • Limited — Manufactured-home occupancy within an Indiana mobile home community; this claim does not determine placement of an individual manufactured home outside such a community.
      “Connected to the water supply and sewer service; before occupancy.”
  • county building authorityGeneral

    Indiana counties' authority to adopt and enforce administrative building-code provisions, including building-permit or plan-review requirements, for residential construction in their jurisdiction, including Class 2 one- and two-dwelling-unit structures.

    • A county's substantive building and fire-safety provisions outside mere incorporation of Fire Prevention and Building Safety Commission rules are described by IDHS as unenforceable and may not be adopted; modification of Commission standards may occur only through Commission rulemaking.
    • The State's county-or-municipality model ordinance excludes industrialized building systems and mobile structures certified under IC 22-15-4.
    • The model ordinance states that it is not applicable to regulated amusement devices, regulated boilers, regulated pressure vessels, or regulated lifting devices.
    • The model ordinance conditions permit issuance on a complete application, any applicable fee, conformity with applicable building and fire-safety laws, and no violation of other applicable ordinances or laws.
    “HEA 1575 did not eliminate the authority of local jurisdictions to adopt and enforce administrative provisions in building and fire safety ordinances”

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Bartholomew County, Indiana

Is Bartholomew County a good place to live off-grid or homestead?

Bartholomew County scores 52/100 on the Bolthole Index, a solid county profile. Its strengths: manageable long-term carry cost and mixed durability signals. Watch-outs: about 111,099 people within a 30-minute drive and more administrative friction around building and land use.

How much does land cost in Bartholomew County, Indiana?

Land in Bartholomew County runs about $6,180 per acre, based on the latest county data.

What is the water situation in Bartholomew County?

Bartholomew County gets about 46.8" of rain a year, with severe drought in roughly 3.6% of years.

How remote is Bartholomew County?

A representative private-land location has about 111,099 people within a 30-minute drive and 6,765,768 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

How Bartholomew compares in Indiana