Unincorporated Bartholomew County, Indiana requires a building permit before covered construction, alteration or repair costing more than $300; Technical Code Enforcement issues building permits1. County zoning applies within the county plan commission’s jurisdiction, excluding incorporated areas and municipal planning jurisdictions2. Septic permits for homes without sanitary sewer come from the Bartholomew County Health Department3,4.
Do you need a building permit in Bartholomew County, Indiana?
Unincorporated Bartholomew County requires a building permit before construction, alteration or repair costing more than $300.
Unincorporated Bartholomew County requires a building permit before construction, alteration or repair costing more than $3001. New homes, accessory buildings larger than 200 square feet, in-ground pools, and above-ground pools on lots smaller than 2 acres require a surveyor-certified site plan1. The published fee for a new one- or two-family dwelling is $200 plus $0.10 per square foot of gross floor area, including attached garage/carport and basement; that fee includes all required permits8. Confirm the current charge with Technical Code Enforcement because the posted code compilation may lag legislation8. An owner-occupant doing the work personally can file an Owner Occupant Sign-Off, but building permits and inspections still apply7. Columbus has its own building-permit requirement; Edinburgh, mainly in Johnson County but extending into Bartholomew County, issues its own building permits9,10. Septic administration remains with the Bartholomew County Health Department for county addresses4.
Who is the Bartholomew County building department, and how do you reach them?
The Department of Technical Code Enforcement of Columbus/Bartholomew County issues building permits, reviews plans, assigns addresses, and answers code, floodplain and permit-record questions.
The Department of Technical Code Enforcement of Columbus/Bartholomew County issues building permits, reviews plans, assigns addresses, and answers code, floodplain and permit-record questions1. Call 812-379-1535 for building-permit questions or inspections, which require 24-hour advance scheduling1. Bartholomew County has adopted a building code1. All fees and fines must be paid before a final building inspection is scheduled, and occupancy must wait for that inspection1. An improvement requiring an Improvement Location Permit also needs successful final site and building inspections and a certificate of occupancy from the Chief Code Enforcement Officer before use2. For zoning and subdivision questions, contact the Columbus-Bartholomew County Planning Department at 812-376-2550 or planning@columbus.in.gov11.
Does Bartholomew County, Indiana have zoning?
County zoning governs unincorporated Bartholomew County within the county plan commission’s jurisdiction, excluding municipal planning jurisdictions.
County zoning governs unincorporated Bartholomew County within the county plan commission’s jurisdiction, excluding municipal planning jurisdictions2. Columbus sets its own zoning, as does Edinburgh, a town mainly in Johnson County that reaches into Bartholomew County12,13. Septic administration remains with the Bartholomew County Health Department for county addresses4. The joint district has separately adopted zoning; Hartsville contracts with the county to administer Hartsville’s zoning and subdivision rules11. Use the official zoning map to identify the district before applying dimensional standards2. In Agricultural: Voluntary Protection, nonagricultural structures have 25% maximum lot coverage and primary structures a 40-foot height limit2. In Commercial: Professional Office (CO), maximum coverage is 65%, primary/accessory height limits are 40/25 feet, and side and rear setbacks are 10 feet14. CO front setbacks vary by road or street classification and vehicle-access features14.
How do septic permits work in Bartholomew County?
The Bartholomew County Health Department administers onsite sewage and provides the county's permit, extension, and subdivision forms.
The Bartholomew County Health Department administers onsite sewage and provides the county's permit, extension, and subdivision forms4. A dwelling that will not connect to sanitary sewer needs a written septic construction permit signed by the health officer before a new system, replacement, expansion, alteration, or repair3. The application includes property and bedroom information, an onsite soils evaluation, plans, and any other information the health officer requires; the local health department must issue or deny it in writing within 45 days after receiving the application and plans3. Published fees are $200 for a new system permit, $100 for a repair permit, and $50 for a minor repair15. Only about 0.2% of county soils are rated without severe limitations for a conventional drain field, so make sewage feasibility an early purchase contingency16.
Can you live in an RV or tiny home on your land in Bartholomew County?
In unincorporated Bartholomew County, a primary tiny home in a single-family residential district generally needs 950 square feet if manufactured or 1,000 if site-built, with RE district exceptions.
In unincorporated Bartholomew County, a primary tiny home in a single-family residential district generally needs 950 square feet if manufactured or 1,000 if site-built, with RE district exceptions5. Agricultural: Voluntary Protection has a 1,000-square-foot dwelling minimum, subject to its manufactured-home provision2. Outside manufactured-home communities, manufactured homes are allowed only where single-family dwellings are allowed; mobile homes are prohibited2. Manufactured homes must meet installation, anchoring, travel-equipment removal, utility and applicable district standards2. An ADU requires conditional-use approval; residential ADUs have a 400-square-foot minimum and a maximum of 1,000 square feet or 65% of the primary home, whichever is less6. Only 1 ADU is allowed per property, without an additional driveway, using public sewer or Health Department-approved septic arrangements2. The campground/RV-park provisions cover short-term or seasonal occupancy and do not establish permission for year-round RV dwelling on private land14. We could not confirm temporary camping on a private lot; ask Planning about the proposed use11.
Building a home in Bartholomew County: what are the steps, in order?
Confirm which zoning authority governs the parcel, then use the official map to identify its district and allowed use.
- Confirm which zoning authority governs the parcel, then use the official map to identify its district and allowed use2.
- Check the district's lot size, setbacks, lot coverage, height, and utility rules before fixing the site plan2,17.
- If the home will not connect to sanitary sewer, complete the soils evaluation and obtain the written septic construction permit before settling the layout3.
- Submit the planning application through the OpenGov services portal with each property owner's authorization, and obtain any applicable driveway or utility-connection approval1,17.
- Apply to Technical Code Enforcement before starting covered work costing more than $3001.
- Pay all fees and fines before scheduling the final building inspection, complete required inspections and obtain the certificate of occupancy before using or occupying an improvement that required an Improvement Location Permit1,2.
What should you check before you buy land in Bartholomew County?
In Bartholomew County’s Agricultural: Preferred and Agricultural: General Rural districts, a septic-served lot generally needs at least 1 acre or enough area for 2 viable septic sites, whichever is greater.
In Bartholomew County’s Agricultural: Preferred and Agricultural: General Rural districts, a septic-served lot generally needs at least 1 acre or enough area for 2 viable septic sites, whichever is greater2. Only about 0.2% of county soils are rated without severe limitations for conventional drain fields, making sewage feasibility an early purchase concern16. RM Residential Multi-Family and CO Commercial: Professional Office require public water and sewer, so a well and septic system cannot simply replace those connections14,18. Indiana’s high-capacity-well guidance generally requires no state permit except in the Great Lakes Basin, but significant-withdrawal registration may apply; that guidance does not settle a domestic-well project’s requirements19. Ask Planning about floodplain development approval and minor-subdivision plat, physical-features and sewage documentation before buying or dividing land20,21. Agricultural accessory-structure zoning exemptions do not waive other applicable building, health, septic or floodplain rules2.
Watch-outs
- County zoning stops at incorporated areas and municipal planning jurisdictions; ask Planning which authority governs the parcel2,11.
- All development in a regulated Bartholomew County floodplain requires a local permit, and local rules are more restrictive than federal and state minimums20.
- Bartholomew County short-term rentals with 6 or more unrelated occupants are treated as shared housing, requiring conditional-use review in most districts; parking and septic capacity also matter22.
- The ordinance describes RV occupancy only as short-term or seasonal campground use and does not establish year-round RV living on a private lot; we could not confirm a temporary-camping rule, so ask Planning about the parcel11,14.
Sources
22 official pages, each quoted and re-checked · written October 12, 2026
- Code Enforcement
- Columbus & Bartholomew County Zoning Ordinance
- 410 IAC 6-8.3 Residential Onsite Sewage Systems
- Onsite Sewage System
- Tiny Homes
- Accessory Dwellings
- Owner Occupant Sign-Off
- § 150.20 Residential Structures
- Columbus: 15.04.080 Permit required when (Bartholomew County)
- Town of Edinburgh: Building & Improvement Permits (Bartholomew County)
- Columbus-Bartholomew County Planning Department (columbus.in.gov)
- Columbus: 17.02.010 Zoning ordinance adopted by reference (Bartholomew County)
- Town of Edinburgh: § 156.01 Adoption by Reference (Bartholomew County)
- Columbus & Bartholomew County Zoning Ordinance
- Bartholomew County Health Department – Environmental Health Division (bartholomew.in.gov)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Applications & Forms
- Columbus & Bartholomew County Zoning Ordinance
- Water Availability Use/Rights Frequently Asked Questions
- Floodplain Regulations
- Bartholomew County Minor Subdivision Checklist
- Short Term Rentals
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Bartholomew County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.