Washington, Illinois requires city building permits for structural improvements within city limits.1 Washington administers its own zoning in Tazewell County; private septic construction, alteration or extension requires a Tazewell County Health Department permit.23 Minimum home and lot sizes depend on the city's zoning district.456
At a glance
- Building permits
- City-issued for structural improvements inside Washington city limits1
- Zoning
- City zoning; requirements vary by district27
- Septic permits
- Tazewell County Health Department; required for construction, alteration or extension3
- Minimum home size
- R-1: 700 square feet of livable ground-floor space; Country Estates: 1,000 square feet excluding basement45
- Minimum lot size
- R-1 single-family: 6,500 square feet; Agricultural and Country Estates: 2 acres per dwelling869
- Owner-installed septic
- Homeowner may install or service a system for the homeowner's own personal single-family residence; septic permit still required10
Who to call
Building permits
Washington Building and Zoning
Building permits and project compliance inside Washington city limits
301 Walnut St Washington, IL 61571
Planning & zoning
Washington Planning & Development Department
Local land-use administration, zoning applications and floodplain management
301 Walnut St Washington, IL 61571
Building permits
Washington Building and Zoning — Residential Construction
New-home application documents, fees and inspections
301 Walnut St Washington, IL 61571
Septic permits
Tazewell County Health Department
Permits for constructing, altering or extending private sewage disposal systems in Tazewell County
21306 IL Route 9 Tremont, IL 61568-9252
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Washington means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Washington, IL?
Washington issues building permits for all structural improvements to buildings or properties inside city limits.1 Washington has adopted building, residential, mechanical, electrical, plumbing, life-safety and property-maintenance codes, with local amendments.11 The city building permit and inspection process checks compliance with locally adopted codes and regulations.1 City building permits last 6 months and can be renewed if construction continues.1 A new home's building permit application can be signed only by the property owner or an authorized agent.12
Who handles Washington building permits, zoning and permit fees?
Contact Washington Building and Zoning at (309) 444-1122 for city building permits; Washington Planning & Development at (309) 444-1135 administers local land-use ordinances.113 Both offices list City Hall at 301 Walnut St Washington, IL 61571.113 Washington's new-home building permit fee is a $20 filing fee plus $2 per $1,000 of estimated R.S. Means construction value.12 Starting construction without a valid building permit doubles that fee.12 Septic permits remain with Tazewell County Health Department, rather than the city building counter.3
Does Washington have zoning, minimum lot sizes and setbacks?
Washington has city zoning, including R-1, Agricultural and Country Estates districts.7 In Washington's R-1 district, a single-family lot needs at least 6,500 square feet and 65 feet of width at the setback line.8 R-1 front yards generally require 25 feet, with an established-area exception; each side yard needs at least 5 feet and the combined side yards at least 12 feet.14 Agricultural dwellings need at least 2 acres and 200 feet of lot width; Country Estates dwellings need at least 2 acres and 220 feet of width at the setback line.69 Ask Washington Planning & Development to identify the parcel's district before choosing a home footprint.13
How do septic permits work inside Washington?
Private septic construction, alteration or extension inside Washington requires a Tazewell County Health Department permit, valid for 1 year.3 A soil investigation is required before issuance unless the ordinance's pre-site-inspection waiver applies.15 Washington septic applications must show property boundaries, easements, utilities, wells, buildings, driveways, patios, soil-boring locations and a complete disposal-facility plan.16 The health authority may refuse a septic permit when public sewer is available; for a single-family residence, the reasonable-distance threshold is no greater than 300 feet, subject to practical and permitted connection.17 A homeowner may install or service septic for the homeowner's own personal single-family residence, but still needs the required septic permit.10
Can you live in an RV or tiny home in Washington?
Washington prohibits public camping on public sidewalks, streets, rights-of-way, parks and other publicly owned property.18 That public-property prohibition does not establish permission to live in an RV on a private Washington lot; ask Washington Planning & Development about the proposed residential use.1813 We could not confirm a separate tiny-home occupancy or accessory-dwelling authorization inside Washington; ask the same department before buying a unit.13 Washington's R-1 residences require at least 700 square feet of livable ground-floor space, while Country Estates residences need at least 1,000 square feet excluding the basement.45
Building a home in Washington: what are the steps?
- Ask Washington Planning & Development to identify the zoning district and review the proposed land use.13
- Resolve sewer availability with the city and any private-septic proposal with Tazewell County Health Department; an available public sewer can prevent septic approval.1317
- Submit a scaled site plan showing boundaries, proposed improvements, driveway and setbacks, complete construction plans, and the residential building permit application to Washington Building and Zoning.12
- Obtain the city building permit before construction; Washington doubles the building permit fee for construction begun without a valid building permit.12
- Arrange city inspections and the completion inspection before issuance of the certificate of occupancy.12
What stays with Tazewell County, and what should Washington buyers check?
Tazewell County Health Department handles private-septic permits inside Washington; city zoning approval does not replace a septic permit.3 Tazewell County also requires a Health Department permit for water-well construction or repair and water-well pump installation, with water analysis and approval before a new well enters service.19 Washington Planning & Development lists floodplain management among its responsibilities, so bring city-parcel floodplain questions to that department.13 For a parcel outside Washington city limits, use the Tazewell County guide: the county building permit requirements cited there apply to unincorporated land.20
Watch-outs
- Washington's public-camping prohibition does not answer private-lot RV occupancy; ask Washington Planning & Development before planning an RV residence.1813
- Public sewer availability can block a Washington private-septic permit even when the proposed home meets city zoning requirements.172
- We could not confirm Washington's tiny-home occupancy, accessory-dwelling or short-term-rental rules; ask Washington Planning & Development about the specific use.13
Sources
- Washington Building and Zoning (ci.washington.il.us)
- Sec. 56-78. R-1 One- and Two-Family Residential District (Washington), quoted and re-checked
- Sewage Disposal (Washington), quoted and re-checked
- Sec. 56-78. R-1 One- and Two-Family Residential District (Washington), quoted and re-checked
- Sec. 56-119. Floor area ratio (Washington), quoted and re-checked
- Sec. 56-49. Required lot area (Washington), quoted and re-checked
- Sec. 56-78. R-1 One- and Two-Family Residential District (Washington), quoted and re-checked
- Sec. 56-78. R-1 One- and Two-Family Residential District (Washington), quoted and re-checked
- Sec. 56-120. Required lot area (Washington), quoted and re-checked
- Sewage Disposal (Washington), quoted and re-checked
- Sec. 14-2. Construction codes adopted by reference (Washington), quoted and re-checked
- Washington Building and Zoning — Residential Construction (ci.washington.il.us)
- Washington Planning & Development Department (ci.washington.il.us)
- Sec. 56-78. R-1 One- and Two-Family Residential District (Washington), quoted and re-checked
- Sewage Disposal (Washington), quoted and re-checked
- Sewage Disposal (Washington), quoted and re-checked
- Sewage Disposal (Washington), quoted and re-checked
- Sec. 38-32. Public camping prohibited (Washington), quoted and re-checked
- Water Supply, quoted and re-checked
- Residential Permitting Fees and Setbacks, quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.