Tazewell County, Illinois
Village of Mackinaw is a village in Tazewell County, Illinois. Village of Mackinaw adopts its own zoning, so inside its limits Village of Mackinaw’s rules apply, not the county’s. Septic permits inside Village of Mackinaw come from Tazewell County (Tazewell County Health Department · 309-925-5511). 15 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the Tazewell County page.
New construction and modifications inside Mackinaw village limits
“a building permit is required for all construction and must be obtained seven days before construction begins.”
Construction inside Mackinaw village limits: the village has not adopted its own building code.
“the village of mackinaw has not adopted a building code”
Permitted construction inside Mackinaw village limits
“the permit holder shall seek final inspection by notifying the zoning officer who shall make such final inspection promptly.”
New construction inside Mackinaw village limits
certificate of occupancy application deadline: 30 days (after the expiration of the construction time period)
“who fails to obtain a certificate of occupancy within thirty (30) days or final inspection following the expiration of the construction time period, shall be subject to a fine”
All land inside Mackinaw village limits (Village of Mackinaw, Tazewell County, IL, ZIP 61755). The village administers its own zoning code, Chapter 153 of the village code (Ordinance No. 513 and amendments).
“the zoning officer is responsible for permitting all construction and demolition of properties.”
Residential property inside Mackinaw village (residential use category; the village FAQ does not name the zoning district)
front setback: 25 feet · rear setback: 25 feet · side setback: 10 feet
“what are the required setbacks for a residential property? 25' from the front lot line 25' from rear lot line 10' from side lot line”
“what are required setbacks for commercial properties? 0' from the front lot line (unless fuel storage is in front then the setback is 10') 20' from the rear lot line 0' from the side lot line”
“what are required setbacks for industrial properties? 0' lot line for front, rear and sides”
All lots inside Mackinaw village (general limit stated in the village permit package)
maximum lot coverage by all buildings: <= 30 percent of lot area
“the combined square footage of the footprints of all buildings on a lot cannot exceed thirty (30%) percent of the square footage of the lot.”
Principal and detached accessory structures inside Mackinaw village (the village permit package and FAQ do not name a district)
principal structure maximum height: <= 35 feet (multi-family dwellings may be permitted up to 6 stories) · detached accessory structure maximum height: <= 25 feet (not to exceed height of existing principal structure)
“no main or principal structure shall exceed 35 feet in height, except that multi-family dwellings shall be permitted to a height of 6 stories”
Zoning use permit fees for construction inside Mackinaw village
new construction of a main or principal structure of 1,000 sq ft or less: 60 USD · new construction of an accessory structure: 40 USD · new construction of a storage shed: 20 USD
“1. new construction of a main or principal structure of one thousand (1,000) square feet of floor area or less $60.00”
Building permit process for construction inside Mackinaw village
“to begin the process, you must fill out the building permit application and submit it to village hall.”
Village of Mackinaw does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Private sewage disposal (septic) inside Mackinaw village limits is handled by the Tazewell County Health Department under the county code, because the village has no septic rule of its own in the pages reviewed. The county code says 'within the county' and so is read as applying inside the village.
“it shall be unlawful for any person to construct, alter, or extend private sewage disposal systems within the county unless he or she holds a valid permit issued by the health department”
New or altered private sewage disposal (septic) systems on land inside Mackinaw village limits, under the Tazewell County Health Department permit
“it shall be unlawful for any person to construct, alter, or extend private sewage disposal systems within the county unless he or she holds a valid permit issued by the health department”
On-site sanitation (septic) on land inside Mackinaw village limits
“it shall be unlawful for any person to construct, alter, or extend private sewage disposal systems within the county unless he or she holds a valid permit issued by the health department”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Mackinaw or Tazewell County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Mackinaw publishes no rule on the point, not that none exists. Tazewell County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Mackinaw means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.