Tazewell County, Illinois
Village of Hopedale is a village in Tazewell County, Illinois. Village of Hopedale adopts its own zoning, so inside its limits Village of Hopedale’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the Tazewell County page.
Construction inside Hopedale village limits, administered by the village Building Permits and Inspections Department
“21-13-2: building permit application: (a) no building or structure within the village shall hereafter be erected, moved, altered, or razed, nor shall any such work be started to erect, move, alter or raze until a building permit shall have been obtained from the zoning enforcing officer”
Buildings inside Hopedale village limits issued by the village Building Permits and Inspections Department
“21-13-3: certificate of occupancy: no land, building, structure or part thereof shall be occupied by or for any use for which a building permit is required by this chapter unless and until a certificate of occupancy shall have been issued for such new use.”
Land inside Hopedale village limits (Village of Hopedale, Tazewell County, IL, 101 SE Main Street, Hopedale IL 61747 per the village site).
“21-1-1: title: this chapter shall be known and may be cited as "the village of hopedale zoning ordinance."”
A zoning lot in the residential district regulations of Hopedale village Chapter 21 (the section headed '(e) lot area and density'); the district name is not confirmed in the opened text, so confirm the district before relying on it.
minimum lot area: >= 9000 square feet · minimum lot width: >= 75 feet · minimum lot depth: >= 100 feet
“(e) lot area and density: 1. minimum lot area: each zoning lot shall have an area of at least nine thousand (9,000) square feet, a lot width of at least seventy-five feet (75') and a lot depth of at least one hundred feet (100').”
Residential zoning lot in the same Chapter 21 district regulations block as the 9,000 sq ft lot rule (district name not confirmed)
maximum lot coverage: <= 30 percent
“3. maximum coverage: the amount of the total lot area which may be covered by all principal and accessory buildings shall not exceed thirty percent (30%).”
Land divided into lots inside Hopedale village limits, under the village subdivision control ordinance
“7-4-3: procedure: before dividing any tract of land into two (2) or more lots of less than five (5) acres in size, a sub-divider shall: (a) cause to be prepared a preliminary plat”
Building permit application process inside Hopedale village limits
“simply download the forms below (if available) or give us a call and we will be happy to provide you with the necessary forms.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Hopedale or Tazewell County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Hopedale publishes no rule on the point, not that none exists. Tazewell County’s page lists the county offices to call.