Zoning, building permits and septic rules in Groveland Township, Illinois

Groveland Township is a township in Tazewell County, Illinois. Septic permits inside Groveland Township come from Tazewell County (Tazewell County Health Department · 309-925-5511). 11 rules below are quoted from official sources and independently re-checked, most recently on October 30, 2026. Rules for unincorporated land are on the Tazewell County page.

Answers from the rulebook for Groveland Township

Rules another office applies inside Groveland Township

Groveland Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building permitRequired

    Construction of all structures other than commercial and industrial inside Groveland township, which the county issues permits for

    • Construction may proceed only after the permit is issued; starting work before a permit doubles the fee.
    • The brochure states that not all structures require plan review, so the permit itself may still be required without plan review.
    • The brochure covers residential and other non-commercial structures; commercial and industrial work uses a separate county packet.
    “failure to obtain a permit will result in doubling of the fee required.”
  • Local zoningPresent (with conditions)

    Land inside Groveland township outside any city or village limits: new residential building permits here are reviewed under the Tazewell County zoning code, which the county administers. No Groveland Township zoning ordinance was found.

    • The county zoning code was adopted December 1997 and implemented January 1, 1998, per the county amendment list. The full ordinance text was not opened in this research.
    • Applies only outside Pekin, Morton and other incorporated limits; the unincorporated status of the parcel must be confirmed against the municipal boundary.
    • The Groveland Township zoning PDF that surfaced in search (grovelandmi.gov) belongs to Groveland Township, Michigan and was excluded.
    “plans are reviewed for compliance with the following codes: tazewell county zoning code, current state of illinois plumbing code part 890, 2018 international residential code, 2017 national electrical code, 2018 international mechanical code and illinois energy conservation code-most current edition.”
  • Zoning districtsPartial

    Tazewell County zoning districts that apply inside Groveland township in unincorporated areas

    • The brochure names district codes R-1, R-2, R-R, A-1, A-2, CONS, C-1, C-2, I-1 and I-2 in its setback table.
    • The official district map and district-by-district use text were not opened, so the list is partial and not a complete district schedule.
    “r-1 & r-2 20' 10' 5' 5' r-r 30' 30' 15' 15' a-1, a-2 & cons. 50' 30' 25' 15' c-1 & c-2 20' 10' 5' 5' i-1 & i-2 20' 15' 10' 10'”
  • SetbacksSpecified

    Residential districts R-1 and R-2 of the Tazewell County zoning code, for land inside Groveland township in unincorporated Tazewell County

    • Rear and side yard figures from the county table only; the table's front-yard figures are garbled in the extracted text and are not claimed here.
    • Accessory structures have their own rear and side setbacks; the table splits principal and accessory structures.
    • Applies only where the county zoning code governs, i.e., outside incorporated limits.

    principal structure rear yard setback (R-1, R-2): 20 feet · principal structure side yard setback (R-1, R-2): 10 feet · accessory structure rear yard setback (R-1, R-2): 5 feet · accessory structure side yard setback (R-1, R-2): 5 feet

    “rear & side yard setbacks principal structure accessory structure rear side rear side r-1 & r-2 20' 10' 5' 5'”
    One more reviewed finding on this topic
    • Specified — Agricultural districts A-1 and A-2 (the table row also lists conservation, 'cons.') of the Tazewell County zoning code, for land inside Groveland township in unincorporated Tazewell County
      “rear & side yard setbacks principal structure accessory structure rear side rear side r-1 & r-2 20' 10' 5' 5' r-r 30' 30' 15' 15' a-1, a-2 & cons. 50' 30' 25' 15' c-1 & c-2 20' 10' 5' 5' i-1 & i-2 20' 15' 10' 10'”
  • Who permits septicCounty (with conditions)

    Sewage disposal for a new home inside Groveland township, through the Tazewell County Health Department

    • The county packet names the Tazewell County Health Department as the source of the septic permit or written approval; its service area is assumed to cover Groveland township.
    • Illinois Department of Public Health rules for private sewage systems also apply; they were not opened in this research.
    • A sanitary district letter may replace the septic permit where the home connects to sewer (see utility_connection).
    “septic permit or written approval from the tazewell county health department (309-477-2223)”
  • Septic permitRequired

    New residential construction with on-site sewage disposal inside Groveland township

    • Required when applicable: the alternative is a letter from the sanitary district stating the owner has applied for hookup.
    • The county notes the health department turnaround is about two working days and that the applicant should check with the health department.

    septic permit turnaround: 2 working days (approximate, per county note)

    “copy of septic permit from the tazewell county health department approving sewage disposal facility, when applicable.”
  • Mandatory utility hookupConditional

    A new home inside Groveland township: sewer hookup is one of two accepted ways to prove sewage disposal for a building permit

    • No rule was found requiring connection to public sewer or water when available inside Groveland township.
    • The county accepts either a septic permit or a sanitary district letter stating the owner has applied for hookup.
    • No sanitary district serving Groveland township was identified in this research; water connection requirements were not addressed.
    “or, an appropriate letter from the sanitary district stating that owners have applied for hookup.”
  • Driveway accessRequired

    A new or existing driveway serving a new home inside Groveland township; the road authority varies by road

    • The access permit comes from the township, state or county road official responsible for the road; the packet names the township road commissioner, county highway department or IDOT.
    • The Groveland road district and its contact were not opened in this research.
    “road access permit. contact the township road commissioner, county highway or idot for road access requirements.”
  • Permit feesPublished (with conditions)

    Residential building permit fees for construction inside Groveland township, set by the county fee schedule

    • Fees are the county's published schedule; the 2024 and 2025 brochures show the same dwelling fees.
    • Starting work before the permit doubles the fee.
    • A 911 addressing fee applies per unit and a mailing address must be assigned before permit issuance.
    • The brochure does not state a fee effective date. Electrical and plumbing permit rows in the extracted table are ambiguous and are not used as parameters.

    new 1-2 family dwelling permit, 200 sq ft or less: 200 USD (county fee schedule; plus any other listed permit fees) · new 1-2 family dwelling permit, 700 to 1,000 sq ft: 400 USD (county fee schedule) · new 1-2 family dwelling permit, 1,001 to 2,000 sq ft: 450 USD (county fee schedule) · new 1-2 family dwelling permit, over 4,000 sq ft: per 50 USD per 1,000 sq ft or fraction (county fee schedule) · accessory structure permit, 201 to 650 sq ft: 180 USD (county fee schedule) · 911 addressing fee: 50 USD per unit (county fee schedule)

    “dwellings: 1 & 2 family - new, additions, alteration and repairs • 200 square feet or less $200.00 • 201 to 699 square feet $300.00 • 700 to 1,000 square feet $400.00 • 1,001 to 2,000 square feet $450.00”
  • Permit processPublished (with conditions)

    Residential building permit process for construction inside Groveland township, handled by Tazewell County Community Development

    • Applications are accepted and permits issued 8:00 a.m. to 4:30 p.m. Monday through Friday.
    • The county packet lists a 48-hour review target for most applications, which it says does not guarantee permit issuance within 48 hours.
    • A mailing address application must be filed first, with about a ten-day wait before issuance.
    • Interior renovations, detached accessory structures and decks have separate, lighter submittal lists.
    “applications are accepted and permits issued between 8:00 a.m. and 4:30 p.m. monday through friday.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Groveland Township or Tazewell County directly.

  • Owner-builder exemption — Owner-builder permit exemption for work inside Groveland township
  • Inspections — Building inspections for work inside Groveland township
  • Certificate of occupancy — Certificate of occupancy for new dwellings inside Groveland township
  • Minimum dwelling size — Minimum dwelling size for a new home in the R-1 and R-2 districts inside Groveland township
  • Minimum lot size — Minimum lot size inside Groveland township under Tazewell County zoning
14 more unanswered
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Groveland Township publishes no rule on the point, not that none exists. Tazewell County’s page lists the county offices to call.