Tazewell County, Illinois
Village of Deer Creek is a village in Tazewell County, Illinois. Village of Deer Creek adopts its own zoning, so inside its limits Village of Deer Creek’s rules apply, not the county’s. 10 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the Tazewell County page.
New home construction inside Deer Creek village limits, plus building additions, accessory structures, fences, driveway approaches and other listed work.
“a building permit is required for: new home or business construction”
Any building constructed inside Deer Creek village limits
“no building will be occupied until this certificate of occupancy is issued.”
Land inside Deer Creek village limits. The village adopts and administers its own zoning ordinance (Code Chapter 14, Zoning).
“land-use within the village is regulated by a zoning ordinance.”
Zoning districts inside Deer Creek village limits
“the village is hereby divided into districts, of which there shall be six (6) in number, known as: "r-1" single-family dwellings "r-2" two-family dwellings district "r-3" multi-family dwellings district "b-1" business & commercial district "i-1" industrial district (light) "i-2" industrial district (heavy)”
Single-family dwellings in the R-1 single-family dwelling district inside Deer Creek village limits
minimum floor area of main structure, single-family dwelling: >= 1000 square feet (variance may be granted by the board of zoning appeals (sentence cut off in the text opened))
“single family dwellings of a minimum of one thousand (1000) square feet of floor area of main structure.”
“two family dwellings of a minimum of 600 square feet of floor area per family”
Buildings in the R-1 single-family dwelling district inside Deer Creek village limits. Other districts (R-2, R-3, B-1, I-1, I-2) are not covered by this claim.
front setback: >= 25 feet (no closer than 25 feet from the front property line; maximum 56 feet per the same section) · front setback maximum: <= 56 feet (no building may be farther than 56 feet from the front property line) · side yard, each side: >= 10 feet · rear yard: >= 20 percent of lot area (the code states the rear yard as a percentage of lot area, not a fixed distance)
“1. set back: no building shall be erected closer than twenty-five (25) feet or more than fiftysix (56) feet from the front property line.”
Improvements on any parcel in all zoning districts inside Deer Creek village limits
green space: >= 60 percent
“(l) improvements on any parcel in all zoning districts must maintain 60% green space.”
Driveways on lots inside Deer Creek village limits
driveway distance from lot line: >= 3 feet
“(k) no portion of a driveway constructed or installed on a lot shall be within 3 feet of any lot line.”
Building permit applications inside Deer Creek village limits
variance application fee: 50 USD (paid at time of application regardless of approval) · building permit issuance time: <= 3 business days (only if plans are within the guidelines of the village code)
“application will be reviewed and permit issued within three business days as long as the plans are within the guidelines of the village code.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Deer Creek or Tazewell County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Deer Creek publishes no rule on the point, not that none exists. Tazewell County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Deer Creek means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.