Leland Grove, Illinois, a city in Sangamon County, requires a building and zoning permit from its city administrator for new structures, new driveways and fences over 20 inches1. The whole city is one residential zoning district2, and manufactured homes are prohibited in it3. Septic permits are handled by the Sangamon County health department, not the city4.
At a glance
- Building permit
- Required from the city administrator for new structures, roof or footprint changes, driveways and other listed work1
- Zoning
- The city's own code; the entire city is one residential district2
- Permit fee
- $75 for a building and zoning permit5
- Inspections
- Required; delivered through Sangamon County, paid by the owner6
- Septic
- Sangamon County health department; licensed contractor and soil scientist required4
- Manufactured and mobile homes
- Prohibited citywide3
- Short-term rentals
- Prohibited (rentals under 30 days)7
Who to call
Building permits
City of Leland Grove, Building and Zoning (city administrator's office)
Building and zoning permits, contractor registration and permit forms inside Leland Grove city limits
2000 Chatham Rd. Leland Grove, Illinois, 62704
Septic permits
Sangamon County Department of Public Health, Environmental Health
Septic system permits and private well permits; the county health department serves city lots as well as unincorporated land
2833 South Grand Avenue East Springfield, IL 62703-2175
Contact details are copied from each office’s official page and were checked against it on October 23, 2026.
Off-grid gear
Going off-grid in Leland Grove means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Leland Grove, Illinois?
Yes. Inside Leland Grove city limits, anyone starting work on a new structure, a change to a building's footprint or roof, a new driveway, a sidewalk, a retaining wall, a pool, an outdoor kitchen, a fence over 20 inches, or any work in city right-of-way must first get a building and zoning permit from the city administrator1. Minor repairs and maintenance do not need one1. The permit goes to the owner or to a contractor acting as the owner's agent1.
The fee for a building and zoning permit is $75, and demolition is also $755. Inspection fees are separate5. Those fee amounts come from the city code as last reviewed, so confirm the current figure with the city office before you budget.
Who issues building permits in Leland Grove, and how do you reach them?
The City of Leland Grove issues its own building and zoning permits; the city administrator is the issuing official1. The city's permits page lets you download a permit form or ask for one at the office8. The city office is at 2000 Chatham Rd. and the phone is 217-698-13008. Paying the fee happens when the form is turned in, and starting work without a permit doubles the fee8.
Contractors doing permitted work must register with the city first and show a license and insurance; registration costs $50 and lasts one calendar year95. A permit application needs a scaled drawing showing the building location and setback lines, dimensioned building plans, and an estimated construction cost9. We could not confirm the review timeline, so ask the city office how long approval takes.
The Sangamon County Department of Building and Zoning serves unincorporated land only; it is not the office for a lot inside Leland Grove10.
Does Leland Grove have zoning, and what does it mean for setbacks and manufactured homes?
Leland Grove has its own zoning, and the entire city is one district, the A Residential District2. Property annexed into the city is classified in that same district11. Because there is only one district, the rules below apply to every lot in the city.
Principal buildings need a front yard of at least 35 feet, which grows where neighbors on the same street side within 300 feet average deeper, plus side yards of at least 5 feet each that total at least 15 feet, and a rear yard of at least 25 feet12. On lots less than 125 feet deep the rear yard can drop to 20 percent of the lot depth12. No building or structure may exceed 2.5 stories or 35 feet, whichever is taller13.
Manufactured homes, mobile homes and short-term rentals are prohibited citywide, and the code does not allow them even by appeal or variation37. We could not confirm minimum lot size, minimum dwelling size or lot coverage limits; ask the city administrator for those before you buy.
How do septic permits work in Leland Grove?
Septic permits for Leland Grove lots without public sewer come from the Sangamon County health department, not from the city4. The owner hires a licensed septic contractor, who typically completes the permit and submits the application to the county health department4. The owner must also hire a licensed soil scientist to evaluate the soil4.
Call the county's environmental inspectors at 217-535-3145 with questions14. We could not confirm the septic permit fee, and we could not confirm whether the city requires a home to connect to public water or sewer where it is available, so ask the city administrator before assuming a septic system is an option. Private well permits also run through the county health department, with review targeted at 7–10 business days after submission15.
Can you live in an RV, tiny home or manufactured home in Leland Grove?
Manufactured homes and mobile homes are prohibited in Leland Grove, with no appeal or variation available3. Short-term rentals of less than 30 days are prohibited too7.
We could not confirm the city's rules for living in an RV, camping on a lot, or building a tiny home or accessory dwelling unit. Because the whole city is a single residential district, do not assume any of these is allowed; get a written answer from the city administrator at 217-698-1300 before buying or parking anything on a lot8.
Building a home in Leland Grove: the steps, in order
- Call the city administrator's office to confirm the lot's setbacks, height limit and any lot-size or coverage rules we could not confirm8.
- If the lot has no public sewer, hire a licensed soil scientist and a licensed septic contractor and apply to the Sangamon County health department4.
- Register your contractor with the city if one will do permitted work9.
- Submit the building and zoning permit application with a scaled site drawing, dimensioned plans and a cost estimate, and pay the $75 fee95.
- Get the required inspections, arranged through Sangamon County, at the owner's cost; they run from setback and footing checks to framing, electrical service and a final review6.
- Ask the city whether a certificate of occupancy is required for your home; we could not confirm it.
What stays with Sangamon County, and what to check before you buy in Leland Grove?
Septic and well permits for city lots go through the Sangamon County health department4. Land outside the city limits falls under Sangamon County's own rules instead; see the Sangamon County page for unincorporated land.
Check floodplain status first: any development in a mapped floodplain inside the city needs a development permit from the city administrator16. Then confirm utilities and soils. County-wide, about 25% of soils are rated not limited for a conventional septic drain field, so many lots need a site evaluation17. Sangamon County's effective property tax rate is about 2%18.
Watch-outs
- The city code we reviewed adopts the 2006 International Building Code and International Residential Code and may not reflect later amendments, so ask the city administrator which code editions apply today19.
- A new home on a lot without public sewer needs a county septic permit and a soil scientist's evaluation before design is final4.
- Starting work without a permit doubles the permit fee8.
- We could not confirm minimum lot size, minimum dwelling size, lot coverage, RV or tiny-home rules, or whether a certificate of occupancy is required; the city administrator at 217-698-1300 is the office to ask8.
Sources
- Leland Grove Code Title 8 Chapter 1 (8-1-1 building code; 8-1-2 permits and fees; 8-1-3 contractor registration; 8-1-4 inspection) (Leland Grove), quoted and re-checked
- Leland Grove Code Title 9 Chapter 3 (A Residential District), 9-3-1 through 9-3-9 (Leland Grove), quoted and re-checked
- Leland Grove Code Title 9 Chapter 3 (A Residential District), 9-3-1 through 9-3-9 (Leland Grove), quoted and re-checked
- Sangamon County Public Health - Environmental Health (septic and wells) (Leland Grove), quoted and re-checked
- Leland Grove Code Title 8 Chapter 1 (8-1-1 building code; 8-1-2 permits and fees; 8-1-3 contractor registration; 8-1-4 inspection) (Leland Grove), quoted and re-checked
- Leland Grove Code Title 8 Chapter 1 (8-1-1 building code; 8-1-2 permits and fees; 8-1-3 contractor registration; 8-1-4 inspection) (Leland Grove), quoted and re-checked
- Leland Grove Code Title 9 Chapter 3 (A Residential District), 9-3-1 through 9-3-9 (Leland Grove), quoted and re-checked
- City of Leland Grove, Building and Zoning (city administrator's office) (lelandgrove.com)
- Leland Grove Code Title 8 Chapter 1 (8-1-1 building code; 8-1-2 permits and fees; 8-1-3 contractor registration; 8-1-4 inspection) (Leland Grove), quoted and re-checked
- Permits, quoted and re-checked
- Leland Grove Code Title 9 Chapter 3 (A Residential District), 9-3-1 through 9-3-9 (Leland Grove), quoted and re-checked
- Leland Grove Code Title 9 Chapter 3 (A Residential District), 9-3-1 through 9-3-9 (Leland Grove), quoted and re-checked
- Leland Grove Code Title 9 Chapter 3 (A Residential District), 9-3-1 through 9-3-9 (Leland Grove), quoted and re-checked
- Sangamon County Department of Public Health, Environmental Health (sangamonil.gov)
- sangamonil.gov, quoted and re-checked
- Leland Grove Code Title 8 Chapter 3 (Development in Floodplain Areas), 8-3-4 and 8-3-5 (Leland Grove), quoted and re-checked
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- Effective property tax rate: Bolthole Index county data
- Leland Grove Code Title 8 Chapter 1 (8-1-1 building code; 8-1-2 permits and fees; 8-1-3 contractor registration; 8-1-4 inspection) (Leland Grove), quoted and re-checked
Written October 23, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.