Bolthole Index

Macoupin County, Illinois

Zoning, building permits and septic rules in the Village of Brighton, Illinois

The Village of Brighton, Illinois has its own zoning code, and the village issues a combined zoning/building permit application for work inside village limits12. Living in a camper or other recreational vehicle inside the village is prohibited outside a camping trailer park3. Septic permits come from the Macoupin County health department, not the village4.

At a glance

Zoning
Village zoning code (Chapter 155) applies inside Brighton; Macoupin County has no zoning on unincorporated land15
Building permit
Village combined zoning/building permit application, $20 minimum fee2
RV living
Prohibited outside a camping trailer park3
Minimum lot, R-1
6,000 sq ft6
Minimum lot, A-1
5 acres7
Septic
Macoupin County health department permit; not required where public sewer is available4
Single and double wide trailers
Village no longer issues permits for them2

Who to call

Building permits

Village of Brighton (village hall)

Village hall contact for zoning, building permits and village utilities inside Brighton

618-372-8860

206 S. Main St. Brighton, IL 62012

Zoning

Village of Brighton zoning inspector (zoning/building permit application)

Combined zoning and building permit applications inside Brighton village limits

Septic permits

Macoupin County Public Health Department, Environmental Health

Private septic system permits and well permits for Macoupin County

217-839-4111

Contact details are copied from each office’s official page and were checked against it on October 24, 2026.

Off-grid gear

Going off-grid in Village of Brighton means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does Brighton, Illinois have zoning?

Yes. The Village of Brighton, Illinois, divides the entire village into zoning districts under its own Chapter 155 zoning code1. The districts are A-1, R-1, R-2, R-2A, B-1 and I-18. The village's code official publishes the zoning map each year when districts or rules have changed89.

This is the village's code, not county zoning. Unincorporated Macoupin County has no zoning of its own, and the county tells people to ask the city or village a property sits in5.

Two district rules matter most to a land buyer. In R-1 single-family residential, the minimum lot is 6,000 sq ft6 with a 20 ft front yard and 25 ft rear yard10. In A-1 agricultural, the minimum is 5 acres7, buildings are capped at 35 ft11, and coverage is limited to 10 percent of the lot12. Land annexed into the village is classified R-1 unless rezoned6.

Do you need a building permit in Brighton, and who issues it?

The Village of Brighton issues a combined zoning/building permit; the application is a single form signed off by the village's zoning inspector2. The minimum permit fee is $20, and a new single-family home or addition is figured at $.08 per square foot2. New homes also pay water and sewer tap-on fees of $1800 for water and $800 for sewer2.

The village's form notes that, under Ordinance 2025-04, Brighton no longer issues permits for single or double wide trailers inside the village limits2. Modular home specifications must go to the zoning committee before purchase2.

We could not confirm which building code the village has adopted, whether it inspects work or issues occupancy certificates. Illinois does not issue private building permits itself; any such requirement comes from the local government13. Call Brighton village hall at14 to ask.

Can you live in an RV or tiny home in Brighton, Illinois?

Not in an RV on a regular lot. Brighton's zoning code says no camping trailer or similar recreational vehicle may be used as living quarters other than in a camping trailer park3. A camping trailer may serve as an office or for commercial use only under a village special use permit that cannot be renewed in succession3.

We could not confirm how Brighton treats tiny homes or accessory dwellings, and the village's manufactured home rule is limited to what its permit form says about single and double wide trailers2. Ask the zoning inspector before buying for either use.

The RV rule is the village's. Outside village limits in unincorporated Macoupin County, the county has no zoning that restricts RV living, though septic, well and other rules still apply15. See the Macoupin County page for that land.

How do septic permits work in Brighton, Illinois?

Septic permits for Brighton addresses come from the Macoupin County health department, not from the village16. The county requires a private septic system permit throughout Macoupin County, at $300, with an exception when public sewer is available4. Homeowners must also obtain a license for septic installations and repairs4. Call the Macoupin County Public Health Department, Environmental Health, at17.

Brighton charges a sewer tap-on fee for new homes, so many lots inside the village connect to village sewer2. We could not confirm which lots inside the village have sewer available, so ask the village before assuming you need a septic system. Brighton also reaches into Jersey County, so a lot on that side of the line may fall under a different health department; ask village hall.

Building a home in Brighton: the steps, in order

  1. Look up your parcel's district (A-1, R-1, R-2, R-2A, B-1 or I-1) with village hall, because lot size and setbacks differ by district8.
  2. Ask village hall at14 whether sewer and water are available at the lot, and confirm the tap-on fees of $1800 for water and $800 for sewer2.
  3. Submit the village zoning/building permit application with plans and building materials; the zoning inspector approves or denies it2.
  4. If sewer is not available, apply for a private septic system permit from the Macoupin County health department at174.
  5. If you need a private well, Macoupin County requires a well permit18; we could not confirm whether the village restricts wells inside its limits.
  6. Ask the village about inspections and occupancy sign-off before you move in; we could not confirm those steps.

What stays with Macoupin County, and what to check before you buy

The county, not the village, handles septic permits and private well permits at the Macoupin County health department418. Platting of land into lots is reviewed by the county GIS Manager/Plat Officer for compliance with the State Plat Act and County Subdivision Code19.

Farm buildings on agricultural land inside the village are not restricted by the zoning chapter beyond setbacks, but once part of a tract stops being used primarily for agriculture, the full chapter applies to that portion20.

County figures: Macoupin County's effective property tax rate is 1.6 percent21 and its median property tax bill is $1990 per year22. Only 8.9 percent of the county's soils rate as not limited for a conventional septic drain field, so outside sewer service expect a site evaluation and possibly an engineered system23.

Watch-outs

  • Brighton no longer issues permits for single or double wide trailers inside the village limits under Ordinance 2025-04, and its permit form says the ban extends beyond village limits2.
  • Sewer and water tap-on fees of $1800 and $800 apply to new homes on top of the permit fee2.
  • We could not confirm the village's adopted building code, inspection and occupancy steps, floodplain rules or fees beyond the permit form; ask Brighton village hall; the state leaves permit and inspection requirements to local government13.
  • Brighton lies partly in Macoupin County and partly in Jersey County, so confirm which county health department covers your parcel before relying on Macoupin County's septic rules4.

Sources

  1. Brighton, Illinois Code of Ordinances - code overview (American Legal Publishing) (Village of Brighton), quoted and re-checked
  2. Village of Brighton zoning inspector (zoning/building permit application) (brightonil.com)
  3. Brighton, Illinois Code of Ordinances - Chapter 155 General Zoning Regulations (American Legal Publishing) (Village of Brighton), quoted and re-checked
  4. Licenses, Permits & Zoning Information, quoted and re-checked
  5. Licenses, Permits & Zoning Information, quoted and re-checked
  6. Brighton, Illinois Code of Ordinances - Chapter 155 General Zoning Regulations (American Legal Publishing) (Village of Brighton), quoted and re-checked
  7. Brighton, Illinois Code of Ordinances - Chapter 155 General Zoning Regulations (American Legal Publishing) (Village of Brighton), quoted and re-checked
  8. Brighton, Illinois Code of Ordinances - Chapter 155 General Zoning Regulations (American Legal Publishing) (Village of Brighton), quoted and re-checked
  9. Brighton, Illinois Code of Ordinances - Chapter 155 General Zoning Regulations (American Legal Publishing) (Village of Brighton), quoted and re-checked
  10. Brighton, Illinois Code of Ordinances - Chapter 155 General Zoning Regulations (American Legal Publishing) (Village of Brighton), quoted and re-checked
  11. Brighton, Illinois Code of Ordinances - Chapter 155 General Zoning Regulations (American Legal Publishing) (Village of Brighton), quoted and re-checked
  12. Brighton, Illinois Code of Ordinances - Chapter 155 General Zoning Regulations (American Legal Publishing) (Village of Brighton), quoted and re-checked
  13. Illinois Codes FAQ (Illinois statewide rule), quoted and re-checked
  14. Village of Brighton (village hall) (brightonil.com)
  15. Licenses, Permits & Zoning Information, quoted and re-checked
  16. Licenses, Permits & Zoning Information - Macoupin County, quoted and re-checked
  17. Macoupin County Public Health Department, Environmental Health (macoupincountyil.gov)
  18. Licenses, Permits & Zoning Information, quoted and re-checked
  19. GIS Manager, quoted and re-checked
  20. Brighton, Illinois Code of Ordinances - Chapter 155 General Zoning Regulations (American Legal Publishing) (Village of Brighton), quoted and re-checked
  21. Effective property tax rate: Bolthole Index county data
  22. Median property tax bill: Bolthole Index county data
  23. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data

Written October 24, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Village of Brighton

Village of Brighton’s own rules

  • Local zoningPresent (with conditions)

    Land inside Brighton village limits; the village's own Chapter 155 zoning code (Title XV: Land Usage) governs inside the village

    • Zoning is the village's own code, not county zoning, for land inside village limits.
    • Zoning map is incorporated by reference into Chapter 155 and is published by the code official annually (see zoning_districts claim).
    • Other state and village rules still apply alongside zoning.
    “in order to implement this chapter, and to achieve the objectives in § 155.001, the entire municipality is hereby divided into the following zoning districts.”
  • Zoning districtsPublished (with conditions)

    Zoning districts of the village of Brighton, Illinois (A-1, R-1, R-2, R-2A, B-1, I-1)

    • Zoning map is kept on file with the code official, and the code official publishes the village zoning map each year (§ 155.021(b)).
    • Where a parcel's legal description conflicts with the map, the district given in the legal description applies (§ 155.021(a)(2)).
    “the code official shall publish the village zoning map not later than march 31 of each year.”
    One more reviewed finding on this topic
  • Minimum lot sizeSpecified

    R-1 one-family residential district inside Brighton village limits

    • One single-family dwelling per lot (maximum dwelling units: 1 per lot).
    • Territory annexed into the village is classified R-1 unless rezoned under § 155.132 (§ 155.021(c)).

    minimum lot size: >= 6000 sq ft

    “r-1 one-family residential 1 per lot 6,000 sq. ft. 50 ft. 100 ft. 20 ft. 20 ft. 5 ft. 10 ft. 25 ft.”
    One more reviewed finding on this topic
  • SetbacksSpecified

    A-1 agricultural district inside Brighton village limits

    • Buildings for agricultural purposes on agricultural land must still conform to applicable setback regulations (§ 155.022(b)(1)).
    • Once part of a tract stops being used primarily for agriculture, all provisions of the chapter apply to that portion (§ 155.022(b)(2)).

    front yard depth: >= 50 ft · side yard depth abutting street: >= 25 ft · side yard depth abutting a lot: >= 50 ft · distance to nearest principal building on adjacent lot: >= 50 ft · rear yard depth: >= 50 ft

    “a-1 agricultural 1 per 5 acres 5 acres 250 ft. 250 ft. 50 ft. 25 ft. 50 ft. 50 ft. 50 ft.”
    One more reviewed finding on this topic
  • Lot coverageSpecified

    A-1 agricultural district inside Brighton village limits

    maximum lot coverage: <= 10 percent of lot

    “a-1 agricultural 10% 35 ft. 35 ft. 20 ft. 50 ft. 50 ft. 25 ft. 50 ft. 2 per unit”
  • Building heightSpecified

    A-1 agricultural district inside Brighton village limits

    maximum height of principal building: <= 35 ft · maximum height of accessory building: <= 35 ft

    “a-1 agricultural 10% 35 ft. 35 ft. 20 ft. 50 ft. 50 ft. 25 ft. 50 ft. 2 per unit”
  • Living in an RVProhibited

    Living in a camping trailer or other recreational vehicle on land inside Brighton village limits, outside a camping trailer park

    • Applies to camping trailers and similar recreational vehicles used as living quarters.
    • Living use is allowed only in a permitted camping trailer park (§ 155.046(a) and (b)).
    • Camping trailers may be used as an office or for commercial purposes only with a village special use permit, which may not exceed 180 days and cannot be successively renewed (§ 155.046(c)).
    • Front-yard and street parking limits apply under § 155.046(d) and (e).
    “(b) living quarters. no camping trailer or other similar recreational vehicle shall be used as living quarters other than in a camping trailer park.”
  • Agricultural exemptionAvailable (with conditions)

    Buildings and structures used for agricultural purposes on agricultural land inside Brighton village limits

    • Such buildings must still conform to applicable setback regulations.
    • Once a portion of a tract stops being used primarily for agriculture, all pertinent provisions of Chapter 155 apply to that portion.
    “the provisions of this chapter shall not be interpreted or administered so as to restrict the erection, maintenance, alteration, or extension of buildings (including farmhouses) or structures used or intended to be used for agricultural purposes on agricultural land except that such buildings or structures shall be required to conform to applicable setback regulations.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of Brighton or Macoupin County directly.

  • Building permit — New home construction inside Brighton village limits
  • Owner-builder exemption — Owner-builder construction inside Brighton village limits
  • Building code adopted — New construction inside Brighton village limits
  • Inspections — Inspections of new construction inside Brighton village limits
  • Certificate of occupancy — Occupancy of new homes inside Brighton village limits
17 more unanswered
  • Minimum dwelling size
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of Brighton publishes no rule on the point, not that none exists. Macoupin County’s page lists the county offices to call.