LaSalle County, Illinois
Groveland Township is a township in LaSalle County, Illinois. Septic permits inside Groveland Township come from LaSalle County. 16 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the LaSalle County page.
Groveland Township does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New buildings and specified alterations outside incorporated limits within Groveland Township.
“To erect a new building, accessory structure or structure or part thereof without first obtaining a written building permit from the LaSalle County Building Officer.”
Non-agricultural construction outside incorporated city, village, and town limits within Groveland Township.
residential code edition: 2024 International Residential Code (As amended in Article 5; Illinois State Plumbing Code also applies.)
“The provisions of the Ordinance shall apply whenever a building, accessory structure or structure is constructed outside the limits of cities, villages and incorporated towns of LaSalle County except as hereafter provided.”
Buildings subject to Article 5 building-code provisions outside incorporated limits within Groveland Township.
“Any building, accessory structure or structure that is subject to the Building Code provisions of the Article 5 shall be subject to inspections.”
Permitted buildings, accessory structures, and structures outside incorporated limits within Groveland Township.
“No building, accessory structure or structure shall be used or occupied until the Building Officer has issued a certificate of occupancy therefore as provided herein.”
Unincorporated land within Groveland Township, subject to the County zoning map classification.
“In order to carry out the purpose and intent of this Ordinance, the unincorporated area of the County is hereby divided into the following districts:”
Single-family detached dwellings in the County R-2 Single Family Residence District on unincorporated land within Groveland Township, if mapped R-2.
minimum lot area with public sanitary sewer and water: >= 10000 square feet · minimum lot area with private sanitary or private water systems: >= 1 acre
“Single Family Detached Dwellings: The zoning lot shall be not less than Ten Thousand (10,000) square feet in size for properties that are served by public sanitary sewer and water and the zoning lot shall not be less than one (1) acre in size for properties served by private sanitary or private water systems.”
Recreational vehicles used for living or sleeping on unincorporated land within Groveland Township.
maximum living or sleeping use: <= 180 days per calendar year (Unless otherwise permitted by the ordinance.)
“A recreational vehicle, as defined in Chapter 3, may be used for living or sleeping purposes for a period not exceeding 180 days in a calendar year.”
Campgrounds on unincorporated land within Groveland Township.
maximum stay: <= 30 days (Campground host/manager exception.)
“Stays shall not exceed 30 days, with the exception of campground host/manager (s).”
Manufactured homes intended for permanent habitation on individual lots outside licensed mobile-home parks within Groveland Township.
“To set, erect, build, raise, or move into place or otherwise construct a mobile home, manufactured home, modular home, prefabricated home, or any similar structure used for permanent habitation on an individual lot or lots outside of a licensed mobile home park that is not on a permanent foundation and without first obtaining a building permit from LaSalle County.”
Accessory dwelling units on unincorporated land within Groveland Township.
maximum bedrooms: <= 2 bedrooms · maximum footprint: <= 900 square feet · maximum detached height: <= 35 feet
“An accessory dwelling unit may be attached to the principal dwelling unit or detached as a standalone structure with a permanent foundation.”
Private sewage disposal systems proposed inside Groveland Township.
“A permit for construction will not be issued until a completed application and fee have been submitted to the LaSalle County Health Department and an onsite survey performed by department personnel.”
Private sewage disposal construction inside Groveland Township.
application fee: 230 USD (Returned if the permit is denied.)
“A permit for construction will not be issued until a completed application and fee have been submitted to the LaSalle County Health Department and an onsite survey performed by department personnel.”
Private sewage disposal system construction inside Groveland Township.
“The Health Department must be notified for a final inspection sewage disposal system construction before backfilling.”
Building applications and lot divisions on unincorporated land within Groveland Township.
“The applicant, including those applying for agricultural buildings, accessory structures or structures must also comply with the following LaSalle County Ordinances: Subdivision Regulations Ordinance, Flood Damage Prevention Ordinance, Mobile Home Park Ordinance, Private Sewage Disposal Licensing Act and Code, Water Well Construction Act, and the Zoning Ordinance.”
County building-permit applications for construction outside incorporated limits within Groveland Township.
compliance permit application fee: 25 USD per application (For structures not subject to Article 5 Building Code provisions.)
“To partially defray expenses of administering the ordinance, a fee shall be charged for each building permit application and the fee shall be paid when the application is approved.”
County building-permit applications for construction outside incorporated limits within Groveland Township.
written approval or denial notice: <= 30 days after submittal · time to correct denied application: <= 45 business days (Resubmission without additional fees.)
“All building permit applications shall be reviewed promptly and applicants shall be notified in writing within 30 days of submittal of the application, as to its approval or denial.”
We looked and could not find an official answer yet. Silence is not permission; ask Groveland Township or LaSalle County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Groveland Township publishes no rule on the point, not that none exists. LaSalle County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Groveland Township means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.