Bolthole Index

Lake County, Illinois

Zoning, building permits and septic rules in Park City, Illinois

Park City, Illinois requires a building permit for most construction inside city limits, issued by the city's own Building Department1. The city also sets its own zoning under Chapter 17 of its city code2. Septic permits for lots without public sewer come from the Lake County Health Department, not the city3.

At a glance

Building permit
Required for most construction inside city limits, including driveways, fences, decks and sheds1
Who issues it
Park City Building Department, 847-623-50304
Zoning
City zoning under Chapter 17 of the city code; unlisted uses need a zoning amendment2
Inspections
Schedule at least 24 hours ahead; certificate of occupancy at final approval56
Septic
Lake County Health Department, where no public sewer serves the lot3
Wells
Lake County Water Well Program permits all new wells7
RV and tiny home living
Not confirmed; ask the Building Department4

Who to call

Building permits

Park City Building Department

Building permits, inspections and certificates of occupancy inside Park City, plus zoning questions

847-623-5030

[email protected]

3355 Belvidere Road Park City, Illinois 60085

Septic permits

Lake County Health Department — Onsite Wastewater Treatment System

Septic system review, approval and construction inspections for Lake County properties without public sewer service

847-377-8020

[email protected]

500 West Winchester Road, Libertyville, IL 60048

Contact details are copied from each office’s official page and were checked against it on October 17, 2026.

Off-grid gear

Going off-grid in Park City means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Does Park City, Illinois have zoning, and what does it mean for RVs, tiny homes and lot size?

Yes. Park City regulates land use through its own zoning, described in Chapter 17 of the city code and shown on the official city zoning map2. The zoning chapter covers permitted land uses, building density, building height, parking and landscaping4.

Permitted uses are those a district explicitly allows, such as single-family homes in an R1 single-family district8. Special uses need public hearings, review by the planning and zoning commission and city council approval2. Any land use not listed as permitted or special in a district is not allowed without a zoning chapter amendment2.

That last rule matters for RVs and tiny homes: if the zoning chapter does not list the use in the district, the use is not allowed2. We could not confirm what the zoning chapter says about living in an RV, tiny homes, accessory dwellings, minimum lot size or setbacks, so call the Park City Building Department at 847-623-5030 with the property's address before you commit4.

Do you need a building permit in Park City, and who issues it?

Yes. Park City generally requires a building permit for most construction, including new buildings and additions, garages, interior and exterior alterations, driveways, heating and air conditioning, electrical and plumbing work, swimming pools, fences, patios, decks, sheds, re-roofing, siding and window replacements1. The requirement applies to a professional contractor and to a do-it-yourselfer alike1.

The City of Park City's own Building Department issues the permit; the State of Illinois does not issue building permits for privately funded construction9. Most applications are processed within 10 business days, and large projects can take 5 to 6 weeks10. A residential permit is valid for 12 months1.

Working without a permit is a $100.00 violation4. Skipping a required inspection is a $200.00 violation5. The city's page does not state an owner-builder exemption, so assume a permit is needed even for work on your own home1.

Who is the Park City building department, and how do you reach them?

The Park City Building Department answers permit questions at 847-623-5030 and is based at City Hall, 3355 Belvidere Road, Park City, Illinois 600854. The city's building department page hosts the downloadable building permit application10.

Plans are reviewed against the codes the city lists: the 2021 International Building Code, International Residential Code, International Property Maintenance Code, International Mechanical Code and fire code, the 2023 National Electrical Code, the Illinois Plumbing Code and the 2024 Illinois energy code update11. Submittals that meet those codes and the zoning ordinance move faster, and a code enforcement official explains what to correct when plans fall short4.

The approved permit card must be displayed where it is visible at the construction site4.

How do septic permits work in Park City, Illinois?

Septic permits are a Lake County matter, not a Park City city permit. The Lake County Health Department regulates treatment and dispersal of sewage from septic systems on properties not served by a public sewer system12. Where public sewers do not exist, the process runs in order: a licensed soil classifier evaluates the soil, a licensed designer or engineer designs the system, plans go to the Health Department, and a licensed septic contractor applies for the construction permit3.

Lake County Health Department staff inspect the construction, and no part of the system may be backfilled until it is inspected and approved13. Whether a particular Park City lot is on public sewer or needs a septic system is something we could not confirm; ask the Park City Building Department, then call the Health Department at 847-377-802014.

For lots that do need a septic system, Lake County's soil ratings are a warning: 0% of the county's soils rate as not limited for a conventional drain field, so expect a site evaluation and possibly an engineered system15.

Building a home in Park City: the steps, in order

  1. Confirm the zoning of the parcel on the city zoning map and in Chapter 17, and that a single-family home is a permitted use in that district8.
  2. Ask the Building Department whether the lot has public sewer; if not, start the Lake County septic process with a soil evaluation3.
  3. If you need a private well, apply to the Lake County Water Well Program, which permits all new wells7.
  4. Download the building permit application and submit drawings, plans and a plat of survey4.
  5. Pay the permit fee; we could not locate a published fee schedule, so ask the Building Department for the amount4.
  6. Build, and schedule each inspection at least 24 hours in advance5.
  7. After the inspector approves the final project, the city issues a certificate of occupancy6.

What stays with Lake County, and what to check before you buy in Park City

Lake County's own building permits, zoning and codes apply to unincorporated land; inside Park City, the city handles building permits and zoning16. For land outside city limits, see the Lake County page.

Several things stay with county or state offices even inside city limits. Water well permits are issued by the Lake County Water Well Program in incorporated and unincorporated areas7. A Watershed Development Permit is required for major and minor development in Lake County, and the Stormwater Management Commission is the permitting authority for non-certified communities17. Whether Park City is a certified community we could not confirm, so ask the Building Department about floodplain or grading. A driveway entrance onto an Interstate, U.S. route or Illinois route needs an IDOT permit before work begins18.

For budgeting, Lake County's effective property tax rate is 2.7% and the median property tax bill is $8,743 a year1920. The nearest city of 100,000 or more is about 25 miles from the county center21.

Watch-outs

  • Park City's page does not state an owner-builder exemption, so plan to pull a building permit even for work you do yourself1.
  • Zoning dimensions such as minimum lot size, setbacks, height and RV or tiny-home rules sit in the city zoning chapter and we could not confirm them; ask the Park City Building Department at 847-623-5030 before buying4.
  • Lake County's short-term rental ban and unincorporated zoning rules do not govern Park City lots, and we could not confirm the city's own short-term rental rule; ask the Building Department4.
  • Septic and well permits come from Lake County offices even for addresses inside city limits37.

Sources

  1. Park City, IL - Building Department (Park City), quoted and re-checked
  2. Park City, IL - Building Department (Park City), quoted and re-checked
  3. Onsite Wastewater Treatment Systems, quoted and re-checked
  4. Park City Building Department (parkcityil.com)
  5. Park City, IL - Building Department (Park City), quoted and re-checked
  6. Park City, IL - Building Department (Park City), quoted and re-checked
  7. Environmental Health Permit Applications and Forms, quoted and re-checked
  8. Park City, IL - Building Department (Park City), quoted and re-checked
  9. Illinois Codes FAQ (Illinois statewide rule), quoted and re-checked
  10. Park City, IL - Building Department (Park City), quoted and re-checked
  11. Park City, IL - Building Department (Park City), quoted and re-checked
  12. Onsite Wastewater Treatment System, quoted and re-checked
  13. Septic System Construction Inspection, quoted and re-checked
  14. Lake County Health Department — Onsite Wastewater Treatment System (lakecountyil.gov)
  15. Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
  16. Unified Development Ordinance, quoted and re-checked
  17. Permits & Approvals, quoted and re-checked
  18. Highway Permits (Illinois statewide rule), quoted and re-checked
  19. Effective property tax rate: Bolthole Index county data
  20. Median property tax bill: Bolthole Index county data
  21. Straight-line distance from the county center to the nearest city of 100,000+ people: Bolthole Index county data

Written October 17, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Park City

Park City’s own rules

  • Building permitRequired

    Construction inside Park City city limits

    • Applies to professionals and do-it-yourselfers alike.
    • Residential permits valid 12 months; most applications processed within 10 business days, 5 to 6 weeks for large projects.
    “a building permit is generally required for most construction, including new building construction and additions, garages, interior and exterior alterations, driveways,”
  • Building code adoptedAdopted

    Construction inside Park City city limits

    • Page lists 2021 IBC, IRC, IPMC, fire code, IMC, 2023 NEC, Illinois Plumbing Code and 2024 IECC update.
    “the following are various city codes, ordinances, and guidelines adopted by the village and used to review plans once they have been submitted for zoning approvals and/or permits.”
  • InspectionsRequired

    Permitted construction inside Park City city limits

    • Schedule inspections at least 24 hours in advance.
    • Violation for working without required inspections is $200.00.

    inspection notice: >= 24 hours

    “when the work begins, the city will inspect each major phase of construction. it is the responsibility of the person doing the work to schedule inspections at least 24 hours in advance.”
  • Certificate of occupancyRequired

    Completed projects inside Park City city limits

    • Page says the final approved project receives a certificate of occupancy; scope of which projects need one is not detailed.
    “when the work has been completed and the inspector approves the final project, you will receive either a certificate of occupancy.”
  • Local zoningPresent

    Land inside Park City city limits

    • Special uses require public hearings, planning and zoning commission review and city council approval.
    • Land uses not listed as permitted or special uses are not allowed without a zoning chapter amendment.
    “zoning is the process by which the city of park city regulates land use. the official zoning map of the city designates what a property is zoned as. chapter 17 of the city code entitled zoning, describes regulations for the entire city and for each specific zoning district.”
  • Zoning districtsPublished

    Zoning districts inside Park City city limits

    • Examples named: R1 single-family district, C1 local shopping district; full district list is in Chapter 17 and the zoning map, not read.
    “permitted uses are uses that are explicitly allowed in a zone such as single-family homes in an r1 single-family district or ice cream store in a c1 local shopping district.”
  • Driveway accessRequired

    Driveway construction inside Park City city limits

    • Only states a building permit is generally required for driveways; no standards found.
    “a building permit is generally required for most construction, including new building construction and additions, garages, interior and exterior alterations, driveways,”
  • Permit processPublished

    Building permits inside Park City city limits

    • Application form downloadable; contact 847-623-5030.

    typical processing: 10 business days (5 to 6 weeks for large projects)

    “most applications for building permits are processed within 10 business days.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Park City or Lake County directly.

  • Owner-builder exemption — Owner-builders inside Park City city limits
  • Minimum dwelling size — R1 single-family district
  • Minimum lot size — R1 single-family district
  • Setbacks — R1 single-family district
  • Lot coverage — R1 single-family district
17 more unanswered
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Park City publishes no rule on the point, not that none exists. Lake County’s page lists the county offices to call.

← All of Lake County: county rules, score and offices