Greenfield is a city in Greene County, Illinois. Septic permits inside Greenfield come from Greene County (Greene County Health Department, Division of Environmental Health · (217) 942-6961). 6 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Greene County page.

Answers from the rulebook for Greenfield

Greenfield’s own rules

  • Camping on your landAllowed (with conditions)

    Camping at City of Greenfield's Rives Lake facility

    • The city page describes camping at Rives Lake and lists a camper rate of $25.00 per day.
    • This claim does not establish permission for camping on private land or elsewhere in the city.

    camper rate: 25 USD per day (Applies to Rives Lake camping.)

    “We also offer fishing, pickleball, pavilion rental for parties, and space for tent camping. [...] Camper rate: $25.00 per day.”

Rules another office applies inside Greenfield

Greenfield does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicCounty (with conditions)

    Private sewage disposal systems serving property inside Greenfield city limits when a private system is used

    • The county health department's packet requires application approval before installation and an inspection before the system is covered.
    • The county government describes the health department as serving Greene County, Illinois residents.
    “Greene County Health Department [...] Administrator Molly Peters, B.S., L.E.H.P. Greene County”
  • Septic permitRequired

    Installation of a private sewage disposal system serving property inside Greenfield city limits

    • There is no permit fee at the time stated in the packet.
    • The application must be completed, submitted, and approved before installation.
    • A subsurface seepage system requires an approved soil investigation; if soil is unsuitable, the packet identifies sandfilter or aeration systems as alternatives.

    permit fee: 0 USD (The packet states that there is no permit fee at this time.)

    “At this time there is no permit fee but the permit application is required to be completed, submitted and approved prior to any installation.”
  • Septic inspectionRequired

    Installation of a private sewage disposal system serving property inside Greenfield city limits

    • Inspection by the department is required before the installation is covered.
    • At least 48 hours' notice is required to allow timely inspection.

    inspection notice: >= 48 hours (Notice is required to allow a timely inspection.)

    “An inspection of the installation by this Department prior to covering is required including a minimum of a 48-hour notice to allow a timely inspection.”
  • Off-grid sanitationLimited

    Private, off-grid sewage-disposal systems inside Greenfield city limits

    • IDPH regulates installation of all private sewage disposal systems without surface discharge and systems discharging treated effluent up to 1,500 gallons per day to ground surface.
    • Local health agencies may review construction plans under local-ordinance authority or as IDPH agents.

    ground-surface discharge: <= 1500 gallons per day (Applies to systems discharging treated effluent to ground surface described by IDPH.)

    “The Illinois Department of Public Health (IDPH) regulates the installation of all private sewage disposal systems that have no surface discharge (such as septic tanks and seepage fields) as well as those that discharge treated effluent up to 1,500 gallons per day to the ground surface (such as sand filters and aerobic treatment systems).”
  • Permit processPartial

    Private sewage disposal-system permitting serving property inside Greenfield city limits

    • The permit application must be completed, submitted, and approved before installation.
    • This claim describes only the published private-sewage process, not a general municipal building-permit process.
    “At this time there is no permit fee but the permit application is required to be completed, submitted and approved prior to any installation.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Greenfield or Greene County directly.

  • Building permit — Building construction inside Greenfield city limits
  • Owner-builder exemption — Owner-built dwellings inside Greenfield city limits
  • Building code adopted — Building construction inside Greenfield city limits
  • Inspections — Building construction inside Greenfield city limits
  • Certificate of occupancy — Building occupancy inside Greenfield city limits
20 more unanswered
  • Local zoning
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Shed and accessory-building permit exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Greenfield publishes no rule on the point, not that none exists. Greene County’s page lists the county offices to call.