Unincorporated Edwards County, Illinois has no county zoning ordinance1, but we could not confirm a county building-permit requirement, so ask the County Clerk who has jurisdiction before work starts2,3. Grayville reports its own zoning, while Albion, Bone Gap, Browns and West Salem do not1. Septic plans must be approved before construction by the Illinois Department of Public Health or a local health agent, which appears to be the Edwards County Health Department4,5.
Do you need a building permit in Edwards County, Illinois?
We could not confirm an Edwards County building-permit requirement or application for unincorporated land.
We could not confirm an Edwards County building-permit requirement or application for unincorporated land2. Illinois does not issue building permits, conduct building-code inspections or issue occupancy certificates for privately funded projects; any such requirements are handled by the applicable local government2. A building code applies either way: Illinois requires statewide building codes effective 1/1/2025, with local codes and amendments where a local government adopted them6. Before buying materials or breaking ground, call the Edwards County Clerk and ask which authority has jurisdiction over the parcel and whether a permit, inspection or occupancy approval is required3. Septic and well approvals are separate from any building permit and come from the health authorities4,7.
Who handles Edwards County building permits, and how do you reach them?
No Edwards County building department or county permit office was confirmed.
No Edwards County building department or county permit office was confirmed. The practical first contact is the Edwards County Clerk at the courthouse, 50 E. Main St. in Albion, by phone at 618-445-21153. Ask the Clerk to identify the authority having jurisdiction for the parcel, especially if the property is near Albion, Browns, Bone Gap, Grayville or West Salem. Illinois allows a county or municipality to adopt and enforce a code, while a government that does not adopt one is treated as a non-building-code jurisdiction under the state framework2. The state itself does not process a private project's building permit, plan review or inspection2. Whoever issues building permits, septic plan approval is a different office: the Edwards County Health Department or the Illinois Department of Public Health4,8.
Does Edwards County have zoning?
Unincorporated Edwards County has no county zoning ordinance, so the county sets no rule on minimum house size, minimum lot size, setbacks, building height, lot coverage, accessory dwellings, RVs, tiny homes, manufactured homes or temporary camping.
Unincorporated Edwards County has no county zoning ordinance, so the county sets no rule on minimum house size, minimum lot size, setbacks, building height, lot coverage, accessory dwellings, RVs, tiny homes, manufactured homes or temporary camping1. Zoning can still apply inside towns: a county hazard-mitigation plan lists zoning for Grayville but none for Albion, Bone Gap, Browns or West Salem, and that plan is several years old, so confirm current status with the town clerk1. Absence of zoning does not remove building-code, septic, well or floodplain rules, which apply on every parcel. Ask the Edwards County Clerk whether anything has changed since the county's last ordinance inventory3.
How do septic permits work in Edwards County?
Illinois requires plan approval from the Illinois Department of Public Health or a local health agency before a new private sewage system is built.
Illinois requires plan approval from the Illinois Department of Public Health or a local health agency before a new private sewage system is built4. Edwards County's health department appears to review and issue these permits as an agent of the state, but the arrangement was not confirmed on an official page, so call the Edwards County Health Department at (618) 445-2615 and ask whether it accepts the application or sends it to IDPH5,8. The same approval rule covers replacing a septic tank, adding or removing a major component, or changing at least 25% of an absorption field4. The person doing the work must give the department or local authority at least 48 hours' notice before starting4. Only 3.7% of county soils rate without severe limitations for a conventional drain field, so make the site evaluation an early feasibility step9.
Can you live in an RV or tiny home on your land in Edwards County?
Unincorporated Edwards County has no county zoning, so no county zoning rule restricts living in an RV, camping on private land or placing a tiny home there.
Unincorporated Edwards County has no county zoning, so no county zoning rule restricts living in an RV, camping on private land or placing a tiny home there1. Other rules still apply. A home you live in needs wastewater handled through a private sewage system approved by the health authorities, although Illinois recognizes alternative toilets such as privies and incinerating toilets for human waste, with other domestic wastewater still going to a conventional system10. A tiny home also falls under the statewide building-code baseline, and local occupancy approvals were not confirmed2,6. Illinois campground law regulates qualifying campgrounds and does not answer whether one household may occupy an RV on private land11. Inside Grayville or another town, ask the town first, since town rules differ from the county's1.
Building a home in Edwards County: the steps, in order
Ask the Edwards County Clerk which government has building-permit jurisdiction over the parcel, and request its current permit, inspection and occupancy requirements.
- Ask the Edwards County Clerk which government has building-permit jurisdiction over the parcel, and request its current permit, inspection and occupancy requirements2,3.
- If the parcel is inside Grayville or another town, ask that town about zoning; unincorporated land has no county zoning1.
- Arrange septic plan review before construction; call the Edwards County Health Department to learn whether the local office or IDPH will process it4,8.
- Obtain a permit before constructing, modifying or sealing a private water well7.
- If the driveway enters a state-maintained highway, get an IDOT permit before work begins12.
- Check floodway status; regulated construction may need an IDNR permit13.
- Complete any locally required inspections and occupancy approval identified in the first step2.
What should you check before buying land in Edwards County?
Start with wastewater: only 3.7% of Edwards County soils rate without severe limitations for a conventional septic drain field, so obtain a site evaluation before assuming a standard system will work.
Start with wastewater: only 3.7% of Edwards County soils rate without severe limitations for a conventional septic drain field, so obtain a site evaluation before assuming a standard system will work9. Confirm legal road access, and remember that a new driveway entering a state-maintained highway requires an IDOT permit before work begins12. Check flood maps and project location because construction in regulated Illinois floodways may need state authorization13. For a private well, a permit from IDPH or an approved local health department is required before construction, modification or sealing begins7. Edwards County's effective property-tax rate is about 1.5%, and the median annual property-tax bill is about $1,4299. Finally, get a written building-permit answer for the specific parcel, and a zoning answer if it lies inside a town1,2.
Watch-outs
- A missing county permit page is not proof that no permit is required; ask the Edwards County Clerk to identify the authority having jurisdiction before work starts2,3.
- No county zoning applies in unincorporated Edwards County, but Grayville reports its own zoning, and a parcel inside a town may be subject to town rules1.
- Only 3.7% of Edwards County soils rate without severe limitations for a conventional septic drain field, so septic feasibility can change the usable building area and project budget9.
- Alternative toilets do not eliminate wastewater planning because Illinois still requires other domestic wastes to go to a conventional private sewage disposal system10.
Sources
13 official pages, each quoted and re-checked · written October 10, 2026
- Illinois law on county zoning and building authority
- Illinois Codes FAQ (2026 county census)
- Edwards County Clerk (ilsos.gov)
- 77 Ill. Adm. Code 905.190 Installation Approval (Illinois statewide rule)
- Illinois Department of Public Health - Private Sewage Disposal (2026 county census)
- Building Codes and Regulations
- Section 920.130 Water Well Permit Requirements
- Edwards County Health Department (idjj.illinois.gov)
- Share of soils USDA rates "not limited" for a conventional septic drain field (SSURGO). A strict rating: the median county is about 6% and a tenth of counties are 0%, so a low figure means most lots need a site evaluation or an engineered system, not that septic is impossible. Cite it only with that caveat: Bolthole Index county data
- 77 Ill. Adm. Code 905.130 Human Waste Disposal (Illinois statewide rule)
- Youth Camps and Campgrounds (Illinois statewide rule)
- Highway Permits (Illinois statewide rule)
- Permit Program (Illinois statewide rule)
Written October 10, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.
Off-grid gear
Going off-grid in Edwards County means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.