Bolthole Index

Cass County, Illinois

Building permits, zoning and septic in the Village of Ashland, Illinois

The Village of Ashland, Illinois has residential zoning rules, but we could not confirm a general building permit requirement; ask Village Hall before construction.12 Ashland is in Cass County, whose Health Department issues septic permits, while Ashland also applies its own sewage-disposal rules.34 A driveway across a village sidewalk requires a separate driveway permit from the village clerk.5

At a glance

Building permits
General requirement unconfirmed; ask Village Hall26
Zoning
Village residential districts have their own lot standards17
Septic permits
Cass County Health Department; village sewer rules also apply348
RV living and tiny homes
Permission unconfirmed; ask Village Hall about the proposed use2
Manufactured homes
R-1 special use with foundation, anchoring and skirting conditions9
Driveway permits
Village clerk for driveway across a sidewalk or curb break5
Private wells
State law requires a permit before covered well work; ask county health about local administration1011

Who to call

Also useful

Village of Ashland Village Hall

First contact for the village clerk, zoning questions, building requirements, and sewer and water service

(217) 476-3317

[email protected]

101 North Yates St. Ashland, IL 62612

Septic permits

Cass County Health Department Environmental Health

Private sewage permits and inspections; private drinking-water and well questions

(217) 452-3057 ext. 1316

[email protected]

331 South Main Virginia, IL 62691

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Village of Ashland means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in the Village of Ashland, IL?

We could not confirm whether the Village of Ashland requires a general building permit for a new house, addition or outbuilding; take the project description to Village Hall and request the applicable application, inspection requirements and fee schedule before starting.2 Illinois leaves building permit administration for privately funded construction to the applicable local government; the state answer does not establish whether Ashland requires a building permit.6

Ashland does expressly require a driveway permit before constructing a driveway across a sidewalk, with applications made to the village clerk.5 Breaking a curb also requires a $100 bond or cash before the curb-break permit can issue.5 Ask the clerk to distinguish these access approvals from the approvals needed for the building itself.2

Does the Village of Ashland have zoning and minimum lot sizes?

Ashland has village residential zoning districts with different dimensional rules, so identify the parcel’s district before selecting a house plan.17 In Ashland’s R-1 Low-Density Residential District, a residential lot must have at least 5,000 square feet per family and average frontage of at least 40 feet; the code provides an exception for smaller or narrower lots duly recorded before passage of the code.1 All buildings, including accessory buildings, together may cover no more than 40 percent of an R-1 lot.12

For single-family lots in Ashland’s R-2 High-Density Residential District, the stated minimum area is 5,000 square feet, with minimum average width and frontage of 30 feet per living unit.7 Ask Village Hall to confirm the district, setbacks and treatment of an existing undersized lot for the actual parcel.2

How do septic permits work inside the Village of Ashland?

Constructing, altering or extending an individual sewage disposal system in Ashland requires a Cass County Health Department permit, with applications going to the Board of Health or its authorized representative.8 The permit specifies maximum permissible waste loading and is issued only to a homeowner and/or an Illinois-licensed private sewage disposal system contractor; the county may refuse a septic permit where public or community sewerage is available.8

Ashland’s private sewage rules supplement state and county health requirements, so contact Village Hall about sewer availability before designing a septic system.42 When public sewer becomes available to an Ashland property using private sewage disposal, the building sewer must connect within 90 days, and the private system must be cleaned and filled as the village code directs.13 A homeowner-installed septic system cannot be covered or operated until the Health Department inspects it and issues written approval.14

Can you live in an RV, tiny home or manufactured home in Ashland?

We could not confirm general permission for long-term RV occupancy, private-property camping or tiny-home occupancy in the Village of Ashland; ask Village Hall about the proposed dwelling and duration before buying a lot for that purpose.2 Ask separately about minimum dwelling floor area and any proposed accessory dwelling, because those answers remain unconfirmed.2

Ashland’s R-1 district lists modular or manufactured homes used as single-family dwellings as a special use, subject to a permanent perimeter foundation, permanent anchoring and perimeter skirting made of stone materials, concrete mortared block or brick.9 That provision addresses qualifying modular or manufactured houses rather than establishing permission for an RV or every kind of tiny home.9 Ashland also prohibits private sewage facilities except as provided elsewhere in its sewer code, so an alternative dwelling needs a compliant sanitation plan.15

Building a home in the Village of Ashland: what steps come first?

  1. Take the address and proposed construction to Village Hall; request confirmation of the building permit requirement, inspections, occupancy approval and current fees.2
  2. Confirm the zoning district and fit the building footprint to the applicable lot dimensions and coverage rules before committing to a design.1712
  3. Ask Village Hall about water and sewer service; if private sewage is proposed, seek Cass County Health Department approval before construction.2816
  4. Obtain the village clerk’s driveway permit if the driveway crosses a sidewalk, and resolve any curb-break approval before that work.5
  5. If installing the septic system yourself, arrange Health Department inspection and written approval before covering or operating it.14

Illinois’s qualifying owner-occupant plumbing exemption is limited to plumbing work and does not establish a general exemption from local building requirements.17

What should you check before buying land in the Village of Ashland?

For property outside village limits, use the Cass County guide for the county’s unincorporated-area zoning answer; Ashland’s residential district standards are village rules.181 Inside Ashland, ask Village Hall to confirm the parcel boundary, district, floodplain approvals and utility service before relying on a development plan.2

Private well construction, deepening, modification or sealing requires a permit under Illinois law before work begins; ask Cass County Health Department how to apply locally.1011 For septic, sewer availability can prevent a private-system permit, making that answer a purchase decision rather than a detail to settle after construction.8 Cass County’s effective property tax rate is 2.1 percent, a county-level figure rather than a quote for an individual Ashland parcel.19

Watch-outs

  • Ashland’s general building permit requirement, building inspections, occupancy certificates and fees remain unconfirmed; request the current requirements from Village Hall before construction.2
  • Public sewer availability may prevent a Cass County septic permit for an Ashland property.8
  • Ashland’s manufactured-home special use in R-1 does not establish general RV or tiny-home occupancy permission; ask Village Hall about the specific proposal.92

Sources

  1. Sec. 42-69. Intensity of use (Village of Ashland), quoted and re-checked
  2. Village of Ashland Village Hall (ashlandil.com)
  3. Cass County Zoning Ordinance 2023 (Village of Ashland), quoted and re-checked
  4. Sec. 40-498. Compliance with state requirements (Village of Ashland), quoted and re-checked
  5. Sec. 32-197. Permit required (Village of Ashland), quoted and re-checked
  6. Illinois Codes FAQ (Illinois statewide rule), quoted and re-checked
  7. library.municode.com (Village of Ashland), quoted and re-checked
  8. Cass County Zoning Ordinance 2023 (Village of Ashland), quoted and re-checked
  9. Sec. 42-64. Special uses (Village of Ashland), quoted and re-checked
  10. 77 Ill. Admin. Code 920.130, Water Well Permit Requirements (Illinois statewide rule), quoted and re-checked
  11. Cass County Health Department Environmental Health (casscohealth.org)
  12. library.municode.com (Village of Ashland), quoted and re-checked
  13. Sec. 40-499. Connection to public sewer (Village of Ashland), quoted and re-checked
  14. casscountyil.gov (Village of Ashland), quoted and re-checked
  15. Sec. 40-348. Private system unlawful (Village of Ashland), quoted and re-checked
  16. 77 Ill. Adm. Code 905.190 Installation Approval (Illinois statewide rule), quoted and re-checked
  17. HB5913 Enrolled — Illinois Plumbing License Law amendment (Illinois statewide rule), quoted and re-checked
  18. Zoning - Cass County Illinois, quoted and re-checked
  19. Effective property tax rate: Bolthole Index county data

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Village of Ashland

Village of Ashland’s own rules

  • Minimum lot sizeSpecified

    Single-family residential lots in the R-2 High-Density Residential District.

    • The cited table states minimum single-family lot area of 5,000 square feet, minimum average lot width of 30 feet per living unit, and minimum lot frontage of 30 feet per living unit.

    minimum lot area: >= 5000 square feet · minimum average lot width: >= 30 feet per living unit · minimum lot frontage: >= 30 feet per living unit

    “Minimum Lot Area Minimum Average Lot Width Minimum Lot Frontage Single-family: 5,000 square feet Single-family: 30 feet/living unit Single-family: 30 feet/living unit”
    One more reviewed finding on this topic
    • Specified — Single-family residential lots in the R-1 Low-Density Residential District.
      “Every R-1 residential lot shall have an area of not less than 5,000 square feet per family and shall have an average lot frontage of not less than 40 feet, except that if a lot of record has less area or width than herein required and has been duly recorded prior to the date of the passage of this Code, such lot may be used for any purpose permitted in this article.”
  • Lot coverageSpecified

    All buildings, including accessory buildings, on R-1 residential lots.

    • The cited limit applies to the total coverage of all buildings, including accessory buildings.

    maximum lot coverage: <= 40 percent

    “All buildings, including accessory buildings, shall cover not more than 40 percent of the area of the lot.”
  • Manufactured homesLimited

    Manufactured or modular homes used as single-family dwellings in R-1 districts inside Ashland village.

    • The home must be on a permanent perimeter foundation.
    • It must be permanently anchored to the ground.
    • It must have perimeter skirting consisting of stone materials or concrete mortared block or brick.
    • The use is listed as a special use in R-1.
    “Modular or manufactured homes used as single-family dwellings and placed on a lot on a permanent perimeter foundation permanently anchored to the ground, and having skirting around the perimeter of the structure consisting of stone materials or concrete mortared block or brick.”
  • Who permits septicLocal (with conditions)

    Private sewage disposal systems inside Ashland village are also subject to Ashland's local sewer code.

    • Ashland's code supplements state and county health requirements.
    “The type, capacity, location and layout of a private sewage disposal system shall comply state law, rules and recommendations as well as this chapter.”
  • Off-grid sanitationProhibited

    Privies, privy vaults, septic tanks, cesspools, and other sewage-disposal facilities inside Ashland village, subject to stated exceptions.

    • The code begins with 'Except as hereinafter provided'; compliant private sewage systems may be governed by Secs. 40-498 and 40-499 and applicable state and county rules.
    “Except as hereinafter provided, it is unlawful to construct or maintain any privy, privy vault, septic tank, cesspool, or other facility intended or used for the disposal of sewage.”
  • Mandatory utility hookupSewer (with conditions)

    A property inside Ashland village served by a private sewage disposal system when public sewer becomes available.

    • The building sewer must be connected within 90 days.
    • The private sewage disposal system must be cleaned of sludge and waste material and filled with clean bank-run gravel or dirt.

    connection deadline: 90 days (after public sewer becomes available)

    “At such time as a public sewer becomes available to a property served by a private sewage disposal system, the building sewer shall be connected to the public sewer within 90 days and the private sewage disposal system shall be cleaned of sludge and waste material, which shall be disposed of in a lawful, sanitary and proper manner, and the private disposal system shall be filled with clean bank-run gravel or dirt.”
  • Driveway accessRequired

    Construction of a driveway across a sidewalk or breaking a curb inside Ashland village.

    • A permit is required before constructing a driveway across a sidewalk.
    • A $100 bond or cash is required before breaking a curb.
    • Applications go to the village clerk and require the applicable fee.

    curb-break bond or cash: 100 USD

    “No person shall construct a driveway for vehicles or animals across any sidewalk in the village without having first obtained a permit therefor.”
  • Permit processPartial

    Driveway and curb-break permits inside Ashland village.

    • Driveway applications are made to the village clerk.
    • A fee is required for a driveway permit across a sidewalk.
    • A commercial or habitual non-owner driveway permit requires the village clerk's order.
    • A $100 bond or cash is required before a curb-break permit can issue.

    curb-break bond or cash: 100 USD

    “Applications for such permits shall be made to the village clerk and shall be accompanied by the fee required.”

Rules another office applies inside Village of Ashland

Village of Ashland does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Septic permitRequired

    Construction, alteration, or extension of individual sewage disposal systems serving property inside Ashland village.

    • Permit applications go to the Board of Health or its authorized representative.
    • The permit indicates maximum permissible waste loading.
    • The permit is issued only to a homeowner and/or Illinois-licensed private sewage disposal system contractor.
    • Cass County may refuse a permit where public or community sewerage is available.
    “It shall be unlawful for any person to construct, alter or extend individual sewage disposal systems within Cass County unless he holds a valid permit issued by the Health Department stating the name of such person for which the specific construction, alteration, or extension is proposed. Said permit shall indicate a maximum permissible waste loading.”
  • Septic inspectionRequired

    Individual sewage disposal systems inside Ashland village.

    • A homeowner-installed system may not be covered or placed in operation until inspected and written approval is issued by the Health Department.
    • The Health Authority may inspect during construction.
    “An individual sewage disposal system which has been installed by a homeowner for his personal residence shall not be covered or placed in operation until the said installation shall have been inspected and written approval of the said system shall have been issued by the Health Department.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of Ashland or Cass County directly.

  • Building permit — General building permits for construction inside Ashland village.
  • Owner-builder exemption — Owner-builder exemptions from Ashland building requirements.
  • Inspections — Building inspections inside Ashland village.
  • Certificate of occupancy — Certificates of occupancy for buildings inside Ashland village.
  • Minimum dwelling size — Minimum dwelling size inside Ashland village.
9 more unanswered
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of Ashland publishes no rule on the point, not that none exists. Cass County’s page lists the county offices to call.

← All of Cass County: county rules, score and offices