Zoning, building permits and septic rules in Story City, Iowa

Story City is a city in Story County, Iowa. Story City adopts its own zoning, so inside its limits Story City’s rules apply, not the county’s. 5 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Story County page.

Answers from the rulebook for Story City

Story City’s own rules

  • Building permitRequired

    New construction, remodels, additions, repairs, moving, demolition and alterations inside Story City city limits.

    • Decks, fences, signs and sheds also need a building permit.
    • A trade permit is required for all plumbing, electrical, and mechanical work.
    • Work must not commence until all associated fees are paid and an approved building permit issued.
    • A preconstruction conference with the building official may be required before permit issuance.
    • Contractors must register with the city and carry $500,000 public liability insurance before commencing work (per the city's contractor registration form).

    permit validity: 1 year

    “all new construction, remodels, additions, enlargements, repair, moving, removal, conversion, demolition, and alterations require a building permit, as well as decks, fences, signs, and sheds.”
  • InspectionsRequired

    Permitted work inside Story City city limits; inspections are scheduled with the city's contracted inspection agency, Safe Building.

    • Work must not be completed beyond the point indicated in each inspection without first obtaining the approval of the building inspector.
    • Required inspections include footing, insulation, sewer/water/storm, groundwork plumbing, plumbing, electrical, mechanical, framing, insulation, sidewalk/approach and final.
    • Inspections are completed by the end of the next business day after notice.

    inspection notice: >= 1 business day

    “one business day notice is required on all inspections.”
  • Certificate of occupancyRequired

    Buildings and structures inside Story City city limits that receive a building permit.

    • Final inspection step: no structure may be occupied until a certificate of occupancy is issued.
    “no structure may be occupied until a certificate of occupancy is issued.”
  • Local zoningPresent (with conditions)

    Land inside Story City city limits; the city's building permit form asks for the zoning district and yard setbacks on each project.

    • Zoning ordinance text was not opened in this run; the American Legal Publishing code table of contents did not load, so district rules are unverified.
    “zoning district: front yard setback: side yard setbacks: rear yard setback: off-street parking:”
  • Permit processPartial

    Building permit application process inside Story City city limits.

    • Application needs a completed form, scalable building plans (electronic files accepted), a site plan with property lines and setbacks, a work description, IECC energy compliance information, and trade permits for electrical, mechanical or plumbing work.
    • A permit is valid for 1 year and work must commence within 180 days from date of issuance.
    • A pre-construction conference may be required; permit issues once all requirements are met.
    • Fee schedule and building-code edition are not in the procedure.

    permit validity: 1 year · work commencement deadline: <= 180 days

    “when all requirements have been met, a permit will be issued.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Story City or Story County directly.

  • Owner-builder exemption — Owner-occupant construction inside Story City city limits
  • Building code adopted — Inside Story City city limits
  • Zoning districts — Zoning district map and list for Story City city limits
  • Minimum dwelling size — Single-family residential district inside Story City city limits (district name not verified)
  • Minimum lot size — Main single-family residential district inside Story City city limits (district name not verified)
20 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Story City publishes no rule on the point, not that none exists. Story County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Story City means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Story County: county rules, score and offices