Bolthole Index

Story County, Iowa

Zoning, building permits and septic rules in Slater, Iowa

Slater is a city in Story County, Iowa. Slater adopts its own zoning, so inside its limits Slater’s rules apply, not the county’s. Septic permits inside Slater come from Story County (Story County Environmental Health Department · (515) 382-7240). 8 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the Story County page.

Answers from the rulebook for Slater

Slater’s own rules

  • Building permitRequired

    Residential and commercial construction projects inside Slater city limits, as listed on the city's building permits page

    • The city page says permits are commonly required, not in a code section; the ordinance or building code that sets the requirement was not opened.
    • The city says to contact city hall before starting work if unsure whether a permit is needed.
    • Permits are issued by the city; inspections are handled by Safe Building under contract.
    “permits are commonly required for projects such as: new construction decks and additions garages and sheds fences roofing and siding structural remodeling electrical, plumbing, or mechanical work”
  • InspectionsRequired

    Permitted construction inside Slater city limits

    • Inspections are conducted by Safe Building of Polk City under the city's contract.
    • The inspection schedule details are in the Safe Building documents, which were not opened.
    “once your permit is approved and work begins, inspections must be scheduled as required throughout the project.”
  • Local zoningPresent (with conditions)

    Land inside Slater city limits

    • The city's planning and zoning commission reviews amendments to the zoning ordinances, which shows the city has its own zoning ordinance.
    • The zoning ordinance text itself was not opened within the research budget; its district standards are not recorded here.
    • The city's ordinance book is linked from slateriowa.org/ordinance-book as a PDF that was not read.
    “the planning & zoning commission reviews proposed amendments to zoning ordinances, site plans and plat applications, and also makes recommendations to the council regarding the current and future development of the city of slater.”
  • Subdividing landRegulated (with conditions)

    Plat applications for land inside Slater city limits

    • The city's planning and zoning commission reviews plat applications and makes recommendations to the council.
    • The subdivision ordinance standards were not opened.
    “the planning & zoning commission reviews proposed amendments to zoning ordinances, site plans and plat applications, and also makes recommendations to the council regarding the current and future development of the city of slater.”
  • Permit processPartial

    Building permit applications inside Slater city limits

    • Application forms are offered as downloads or at city hall; the application and inspection procedure PDF and the building permit form were not read.
    • New construction applications go to Safe Building directly, per the page.
    “please submit your permit application directly to city hall unless it is new construction.”

Rules another office applies inside Slater

Slater does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicCounty (with conditions)

    Private sewage disposal systems on land inside Slater city limits, if not connected to city sewer. Story County Chapter 65 is a countywide ordinance; this claim is recorded for Slater city because the county's rule is the only septic rule found, not because the county ordinance names the city.

    • Story County Chapter 65 is a county ordinance; the text does not say whether it applies inside incorporated cities.
    • Slater city's own sewer service is not ruled out; the city sewer connection rule was not checked.
    • Chapter 65 adopts 567 IAC 69 and names the Story County Environmental Health Department (EH) as the designated agency.
    “any person, firm, or corporation wishing to construct or reconstruct a private sewage disposal system in story county shall submit an application for a construction permit to the eh.”
  • Septic permitRequired

    New private sewage systems on land inside Slater city limits, if not connected to city sewer

    • Applies to new construction with wastewater generation, existing systems with increased loading, and replacement or enlargement of the secondary system (Chapter 65.08).
    • Repair permits are separate (65.09).
    • Applicability inside city limits is not confirmed by the chapter text.
    “when construction permit application needed. 1. new construction with wastewater generation.”
  • Septic inspectionRequired

    Newly constructed or reconstructed private sewage systems on land inside Slater city limits, if not connected to city sewer

    • Contractor or owner must notify EH at least eight working hours before the completed system is available for final inspection (65.19).
    • Applicability inside city limits is not confirmed by the chapter text.
    “the secondary system shall remain uncovered until inspected by eh.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Slater or Story County directly.

  • Owner-builder exemption — Owner-builder construction inside Slater city limits
  • Building code adopted — Adopted building code for construction inside Slater city limits
  • Certificate of occupancy — Certificate of occupancy for new homes inside Slater city limits
  • Zoning districts — Zoning districts inside Slater city limits
  • Minimum dwelling size — Minimum dwelling size for the main single-family residential district inside Slater city limits
17 more unanswered
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Slater publishes no rule on the point, not that none exists. Story County’s page lists the county offices to call.

← All of Story County: county rules, score and offices