Story County, Iowa
Kelley is a city in Story County, Iowa. Kelley adopts its own zoning, so inside its limits Kelley’s rules apply, not the county’s. 11 rules below are quoted from official sources and independently re-checked, most recently on November 2, 2026. Rules for unincorporated land are on the Story County page.
Erecting, moving, converting, enlarging, reconstructing or structurally altering a building inside Kelley city limits.
“no building shall be erected, moved, converted, enlarged, reconstructed or structurally altered without a permit from the city to do so.”
Structures and property inside Kelley city limits.
“being marked and designated as the international building code, 2006 edition, as published by the international code council, is hereby adopted as the building code of the city”
Land inside Kelley city limits: the city's own zoning ordinance (Code Chapter 165) governs use and dimensions.
“this chapter shall be known and cited as “the zoning ordinance of the city of kelley, iowa.””
A-1 agricultural district (Section 165.08), principal structures, inside Kelley city limits.
minimum lot area: >= 35 acres
“4. minimum bulk requirements. a. principal structures: lot area........................35 acres minimum”
R-1 single-family residential district principal structures, inside Kelley city limits.
maximum lot coverage: <= 50 percent
“building height.............2½ stories or 35 feet maximum lot coverage.................50% maximum”
R-1 single-family residential district principal structures, inside Kelley city limits.
maximum building height: <= 35 feet (or 2½ stories)
“building height.............2½ stories or 35 feet maximum”
“building height............ 35 feet maximum”
Private sewage disposal facilities inside Kelley city limits
“construct or maintain any privy, privy vault, septic tank, cesspool, or other facility intended or used for the disposal of sewage except as provided in these chapters.”
Houses and buildings used for human occupancy inside Kelley city that abut a street, alley or right-of-way with a public sanitary or combined sewer.
distance to public sewer: <= 100 feet (from property line; design must allow gravity conveyance) · connection deadline: 60 days (after date of official notice from the city)
“such compliance to be completed within 60 days after date of official notice from the city to do so provided that said public sewer is located within 100 feet of the property line of such owner and is of such design as to receive and convey by gravity such sewage as may be conveyed to it.”
Plans, plats and re-plats of subdivisions inside Kelley city limits, and adjacent land that lays out streets to be dedicated to the city.
“all plans, plats, or re-plats of subdivisions or re-subdivisions of land in the city or adjacent thereto, laid out in lots or plats”
Zoning permits for buildings inside Kelley city limits
“such permits shall be issued upon application therefor by the builder or owner.”
We looked and could not find an official answer yet. Silence is not permission; ask Kelley or Story County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Kelley publishes no rule on the point, not that none exists. Story County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Kelley means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.