Putnam County, Georgia

Building permits, zoning and septic rules in Putnam County, Georgia

64Index Score / 100
#95 of 159 in Georgia

Unincorporated Putnam County, Georgia requires building permits for agricultural, residential and commercial construction, including additions, accessory structures and manufactured homes1. Putnam County also administers zoning and subdivision reviews23. The County Board of Health issues septic permits after a favorable site inspection, and county Environmental Health handles inspections45. Georgia's owner-builder license exemption does not waive local permits, codes or zoning6.

At a glance

Building permit
Required for agricultural, residential and commercial construction, including manufactured homes1
Zoning
Yes; the county processes rezonings, variances, conditional uses, plats and development site plans2
Septic permit
Required before developing a site that will use septic; issued after a favorable county site inspection7
Owner-builder
You can build your own home without a Georgia contractor's license, but local permits and zoning still apply6
Short-term rental
Allowed with a county rental certificate, occupation tax certificate and applicable taxes8
Manufactured home
Needs a state installation permit from a licensed installer, plus the county building permit91
Tiny home
Treated as a regular dwelling under Georgia's building code and must meet local zoning for its site10
Land splits
Putnam County reviews final plats, minor subdivisions and preliminary plats3

Who to call

Building permits

Putnam County Planning and Development

Building, sign, site plan and land-disturbance permits, final plats, minor subdivisions, zoning compliance, occupational and home-occupation licenses for unincorporated Putnam County

706-485-2776

117 Putnam Drive, Suite B, Eatonton, GA 31024

Planning & zoning

Putnam County Planning & Zoning Commission

Hears and recommends zoning map amendments, conditional use permits and text amendments, and decides building setback variances for Putnam County

Putnam County Administration Building, Room 203, 117 Putnam Drive, Eatonton, GA 31024

Septic permits

Putnam County Health Department — Environmental Health

Septic (on-site sewage) system permitting and inspection, private well guidance, and general environmental health for Putnam County

(706) 485-8591

117 Putnam Drive, Suite C, Eatonton, GA 31024

Contact details are copied from each office’s official page and were checked against it on September 29, 2026.

Do you need a building permit in Putnam County, Georgia?

Yes. Putnam County requires building permits for agricultural, residential and commercial construction, including additions, remodels, new construction, accessory structures, manufactured homes, modular homes and relocated homes1. Contractors must submit a state contractor's license and an occupational tax certificate with each permit1. Georgia's mandatory construction codes apply to construction in Putnam County whether or not each code is locally enforced, while permissive codes apply only when adopted locally11. A qualifying farm building may be exempt from state minimum building codes, but that statewide exemption does not erase Putnam County zoning, septic, floodplain or other local requirements12. Georgia does not require an owner to hold a contractor license to build the owner's own home, but the owner-builder exemption does not waive Putnam County permits, inspections, codes or zoning6.

Who is the Putnam County building department, and how do you reach them?

For building, sign, site plan and land-disturbance permits, plus zoning compliance, contact Putnam County Planning and Development at 117 Putnam Drive, Suite B, Eatonton, GA 31024, phone 706-485-277613. The department also handles final plats, minor subdivisions, occupational licenses and home-occupation licenses, and administers permitting for the City of Eatonton under an intergovernmental agreement13. Zoning cases such as map amendments, conditional-use permits and building setback variances go before the Putnam County Planning & Zoning Commission, which meets monthly at the Putnam County Administration Building, Room 203, 117 Putnam Drive, Eatonton, GA 3102414. For septic and well questions, contact Putnam County's Health Department, Environmental Health section, at 117 Putnam Drive, Suite C, Eatonton, GA 31024, phone (706) 485-859115.

Does Putnam County have zoning?

Yes. Putnam County administers zoning and processes zoning compliance, conditional-use, rezoning and zoning-map applications2. Planning and Development directs owners to call 706-485-2776 to identify a parcel's zoning; the current district schedule and numeric controls were not confirmed16. Ask Planning and Development to confirm the parcel's setbacks, minimum lot size, building height and allowed uses before buying or designing. Putnam County also reviews final plats, minor subdivisions and preliminary plats, so confirm the subdivision process before splitting land3. A site-built or modular tiny home is a dwelling subject to applicable Georgia building codes, while local zoning controls its location, foundation type and size rules10. Putnam County allows short-term vacation rentals after issuance of a short-term-rental certificate and an occupation tax certificate, with applicable state and county taxes paid8.

How do septic permits work in Putnam County?

Septic in Putnam County runs through the County Board of Health under Georgia Department of Public Health rules, with county Environmental Health handling local permitting and inspections45. A construction permit is required before developing a lot or structure that will use septic, and the County Board of Health must first find the site suitable based on soils, groundwater, rock and other site factors7. The permit remains valid for no more than 12 months7. Georgia generally requires a property intended for human occupancy to connect when public or community sewer is available within 200 feet of the property line or in an abutting public right-of-way, subject to the rule's conditions17. Only 38.8% of Putnam County soils avoid a severe USDA limitation rating for a conventional septic drain field, so make county site approval a purchase contingency18.

Can you live in an RV or tiny home on your land in Putnam County?

No Putnam County-specific rule on long-term RV occupancy or temporary camping was confirmed in the reviewed research, so do not treat the gap as permission. Putnam County administers zoning, and Planning and Development tells owners to contact the department to identify a property's zoning2. Ask that office whether the parcel's district permits RV occupancy, temporary camping or an RV during construction13. A site-built or modular tiny home is a dwelling subject to applicable Georgia building codes, and local zoning controls where it may sit, its foundation type and any minimum lot or building size10. Putnam County's reviewed materials do not establish a county-specific tiny-home occupancy rule or a minimum dwelling size. Manufactured homes follow a distinct path: Putnam County requires a building permit, and Georgia requires installation by a licensed installer under the state installation-permit system19.

How do you build a home in Putnam County, Georgia?

  1. Ask Putnam County Planning and Development to identify the parcel's zoning, then confirm allowed use and dimensional standards213.
  2. Ask Putnam County Environmental Health whether sewer is available or the site may use septic; Georgia generally requires a sewer connection when service is available within 200 feet of the property line or in an abutting public right-of-way17.
  3. If the site may use septic, obtain site approval and a construction permit through Putnam County Environmental Health before installation1920.
  4. Submit the county building-permit application; Putnam County requires permits for new residential construction and requires contractor license and occupational-tax documents from contractors1.
  5. For a private well, have the well contractor contact the county health department in advance for site review and ask whether Putnam County requires a well-construction permit21.
  6. Arrange the locally required building and trade inspections with Planning and Development; we could not confirm the local inspection sequence2213.
  7. Have Environmental Health complete the final septic inspection and issue written approval before backfilling or using the system23.
  8. For access onto a state highway, obtain the applicable GDOT right-of-way permit before construction24.

What should you check before buying land in Putnam County?

Terrain and clearing matter: about 67.7% of Putnam County is at a slope of 15% or less, while 78.5% is wooded2526. Putnam County averages 46.7 inches of precipitation annually and has experienced severe drought in about 15.8% of years2728. The nearest city with at least 100,000 people is about 41 miles from the county center29. The typical effective property-tax rate is 0.7%, and the median annual property-tax bill is $1,6043031. Farmland averages about $4,713 per acre, the typical home value is about $419,703, and a typical annual homeowner's insurance premium is about $1,718323334. Only 38.8% of county soils avoid a severe USDA limitation rating for conventional septic drain fields, so make site approval a purchase contingency18. Check flood status and the locally administered floodplain ordinance for the parcel, and confirm whether access is from a county road or a state highway3524.

Watch-outs

  • Putnam County administers zoning, so confirm your parcel's district and setback rules with Planning and Development before assuming you can add an RV, tiny home or second structure213.
  • Putnam County building permits cover agricultural, residential and commercial construction, including manufactured homes; a qualifying farm-building code exemption does not itself waive zoning or other local requirements112.
  • We could not confirm a county-specific rule on RV occupancy, so don't assume you can live in an RV on your land until Planning and Development confirms it for your specific zoning district36.
  • A site planned for septic may instead need a public or community sewer connection when service meets Georgia's availability rule17.

Sources

  1. Contact Us - Permit Information, quoted and re-checked
  2. Planning and Development | Putnam County, GA, quoted and re-checked
  3. Planning and Development | Putnam County, GA, quoted and re-checked
  4. Onsite Sewage, quoted and re-checked
  5. Onsite Sewage | Georgia Department of Public Health, quoted and re-checked
  6. Residential and Commercial General Contractors Frequently Asked Questions (Georgia statewide rule), quoted and re-checked
  7. On-Site Sewage Management Systems Manual, quoted and re-checked
  8. Approved Locations | Putnam County, GA, quoted and re-checked
  9. Manufactured Housing (Georgia statewide rule), quoted and re-checked
  10. Georgia Tiny House Fact Sheet (Georgia statewide rule), quoted and re-checked
  11. Mandatory and Permissive State Codes, quoted and re-checked
  12. Codes Update Newsletter Spring 2011 (Georgia statewide rule), quoted and re-checked
  13. Putnam County Planning and Development (putnamcountyga.us)
  14. Putnam County Planning & Zoning Commission (putnamcountyga.us)
  15. Putnam County Health Department — Environmental Health (northcentralhealthdistrict.org)
  16. Zoning Administration, quoted and re-checked
  17. GA DPH Onsite Sewage Manual (Georgia statewide rule), quoted and re-checked
  18. Share of soils without severe limits for a conventional septic drain field (USDA SSURGO): Bolthole Index county data
  19. Onsite Sewage (2026 county census)
  20. Manual for On-Site Sewage Management Systems (Georgia statewide rule), quoted and re-checked
  21. Water Well Standards (Georgia statewide rule), quoted and re-checked
  22. Enforcement of State Minimum Codes (Georgia statewide rule), quoted and re-checked
  23. Manual for On-Site Sewage Management Systems (Georgia statewide rule), quoted and re-checked
  24. Regulations for Driveway & Encroachment Control Manual (Georgia statewide rule), quoted and re-checked
  25. Share of land at 15% slope or less: Bolthole Index county data
  26. Wooded share of land: Bolthole Index county data
  27. Annual precipitation: Bolthole Index county data
  28. Share of years in severe drought: Bolthole Index county data
  29. Distance to the nearest metro area: Bolthole Index county data
  30. Effective property tax rate: Bolthole Index county data
  31. Median property tax bill: Bolthole Index county data
  32. Farmland value per acre (USDA census): Bolthole Index county data
  33. Typical home value (Zillow): Bolthole Index county data
  34. Typical home insurance premium: Bolthole Index county data
  35. Floodplain Management (Georgia statewide rule), quoted and re-checked
  36. Planning and Development | Putnam County, GA (2026 county census)

Written September 29, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Found land here? Start a Property Hunt →

County locator

Putnam County in Georgia

64
County map
Putnam County highlighted among the Georgia counties · colored by Index score

How Putnam County scores

Seclusion46100% ev.
Self-Sufficiency65100% ev.
Admin Boringness44100% ev.
Durability57100% ev.
Property Autonomy56100% ev.
Carry Cost7096% ev.

Evidence strength: 100%. This reports direct-source completeness and fallback use; it is separate from the score and is not a confidence interval. How it works →

$420kTypical home
0.7%Property tax
$4,713Land / acre
46.7"Annual rain
15.8% of yrsSevere drought
17.3 / yr (+14.9)Mid-century 100°F days
15.3 daysMid-century dry spell
2.01" (+6.2%)Mid-century 1-day rain
1.34×Wildfire change factor
100%Forward climate coverage
$1,718Home insurance / yr
-0.2% / yrInsurance growth
0.9%Nonrenewal rate
single ZIP shrunk to state medianInsurance basis
20,853People within 30 min
7,503,791People within 2 hr
35,545Radius comparison (15 mi)
67.1People / sq mi
6.8%Federal land
67.7%Land at 15% slope or less
38.8%Septic soil without severe limits
82,625 acWorkable land screen
78.5%Wooded land
46.5 tonsBiomass / forest ac
63.2°FAvg temp

Scout Putnam County

Camp here before you commitBook a few nights nearby on Hipcamp →Already own land here?Earn money hosting campers — get $100 when you become a Hipcamp host →

Some links are affiliate or referral links — we may earn a commission, at no cost to you.

Property hunt

Find land. Bring the promising ones back.

Search live inventory elsewhere, then cost and vet each candidate here. No copied listings, account, or paid data feed.

Each button opens a current land search for Putnam County. Listing sites control their own results and filters.

Analyze a property
Add setup-cost allowances

Use rough quotes or placeholders. Blank fields count as $0.

Working estimate

—land + entered setup costs
Asking $ / acre
—
Setup allowance
—
All-in $ / acre
—

A planning estimate, not a valuation or contractor quote. The USDA benchmark includes farm land and buildings; it is context, not a parcel comp.

Before an offer

Parcel due diligence

0/8 checked

Saved properties and checklist progress stay on this device. Bolthole Index does not receive them.

Answers from the rulebook for Putnam County

What the ordinances and state agencies actually say — one answer per question, each quoted from the official source and independently re-checked.

Putnam County rules

  • Building permitRequired

    Agricultural, residential, and commercial construction handled by Putnam County.

    • Includes additions, remodels, new construction, accessory structures, manufactured homes, DCA modular homes, and existing home relocation.
    • Contractors must submit a State Contractor's License and an Occupational Tax Certificate with each permit.
    “Building permits are required for any agricultural, residential or commercial construction which includes any additions, remodels, new construction, accessory structures (including storage buildings, carports, barns, detached garages, swimming pools, etc.), manufactured homes, DCA modular homes and existing home relocation.”
  • County-wide zoningPresent (with conditions)

    Planning and zoning administration for Putnam County and the City of Eatonton.

    • The county department administers planning and zoning activities and listed zoning-related applications, including zoning compliance, conditional use, rezoning, and zoning map amendments.
    “The Planning and Zoning Department is responsible for the current and long-range planning activities which guide the orderly growth and development of Putnam County and the City of Eatonton.”
  • Zoning districtsPartial

    Publication and administration of Putnam County zoning districts and zoning-map-related applications.

    • The county provides an official Code of Ordinances link and directs applicants to contact Planning and Development to locate property zoning.
    • The current district schedule and numeric controls were not extracted.
    “To locate the zoning of your property please contact the Planning and Development department at 706-485-2776.”
  • Who permits septicMixed (with conditions)

    On-site sewage systems in Putnam County administered locally under Georgia Department of Public Health rules.

    • The Georgia DPH program supplies statewide rules and oversight.
    • The County Board of Health issues permits and performs inspections under those rules.
    “On-site sewage management system construction permits shall be issued only after a site inspection by the County Board of Health shows favorable findings relative to absorption rates, soil characteristics, groundwater, rock, and any other factors which would affect the acceptability of the lot.”
  • Septic permitRequired

    On-site sewage management system construction in Putnam County.

    • Permit issuance requires a favorable County Board of Health site inspection.
    • If public water is used, the public water system must be approved before the septic construction permit is issued.
    • Permits remain valid for not more than twelve months from issuance.

    permit validity: <= 12 months (from date of issue)

    “No person may begin the physical development of a lot or structure where an on-site sewage management system will be utilized, nor install an on-site sewage management system or component thereof, without having first obtained from the County Health Department a construction permit for the installation of an onsite sewage management system.”
  • Subdividing landRegulated (with conditions)

    Subdivision and plat activity in Putnam County.

    • The county planning and zoning department lists final plat, minor subdivision, and preliminary plat applications or recommendations.
    “The department is responsible for making administrative decisions on the following types of requests: Sign Permit Building Permit Site Plan Permit Land Disturbance Permit Final Plat Minor Subdivision Zoning Compliance Occupational License Home Occupation License”
  • Short-term rentalsAllowed (with conditions)

    Short-term vacation rentals in Putnam County.

    • A short-term vacation rental certificate is required.
    • An occupation tax certificate is required.
    • Applicable state and county taxes must be paid.
    • The county application page identifies the short-term vacation rental ordinance as effective September 1, 2023.
    “Putnam County allows short-term vacation rentals to be offered to the public for rental following issuance of a short-term vacation rental certificate, receipt of an occupation tax certificate, and payment of any applicable state and county taxes.”

Georgia rules that apply here

  • Owner-builder exemptionAvailable (with conditions)

    An owner building the owner's own home in Georgia, as an exemption from the state residential/general contractor licensing requirement.

    • The exemption concerns contractor licensure and does not waive local building codes, permits, inspections, zoning, or other requirements administered by the authority having jurisdiction.
    • The Georgia Secretary of State directs owners to check with the applicable local authority for all required local building codes and regulations.
    “Georgia does not require that you hold a license to build your own home; [...] comply with all required local building codes and regulations.”
  • Building code adoptedAdopted

    The Georgia mandatory state minimum construction codes, including the International Building Code, International Residential Code for One- and Two-Family Dwellings, International Fire Code, International Plumbing Code, International Mechanical Code, International Fuel Gas Code, National Electrical Code, International Energy Conservation Code, and International Swimming Pool and Spa Code, apply to construction statewide.

    • Any structure built in Georgia must comply with the mandatory codes whether or not the local government chooses to locally enforce them.
    • Local governments are not required to adopt the mandatory codes, but must adopt administrative procedures to enforce them under O.C.G.A. Section 8-2-25(a).
    • A local government may choose which mandatory codes it will locally enforce.
    • Local amendments cannot be less stringent than the state minimum code; must be based on local climatic, geologic, topographic, or public safety factors; must identify the need for more stringent requirements in legislative findings; and must be submitted to DCA 60 days before proposed adoption.
    • DCA has 60 days after submission to make a recommendation. If DCA recommends against adoption, the local governing body must specifically reject that recommendation before adopting and enforcing the amendment. If DCA does not respond within 60 days, the local government may adopt the amendment. Adopted local amendments must be filed with DCA.
    “As noted above, the building, one and two family dwelling residential, fire, plumbing, mechanical, gas, electrical, energy, and swimming pool codes are mandatory codes, meaning that under Georgia law, any structure built in Georgia must comply with these codes, whether or not the local government chooses to locally enforce these codes. In addition, since Georgia law gives the enumerated codes statewide applicability, it is not required that local governments have to adopt the mandatory codes.”
    4 more reviewed findings on this topic
    • Adopted (with conditions) — Georgia mandatory state minimum construction codes applicable in Putnam County.
      “The mandatory codes are applicable to all construction whether or not they are locally enforced and the permissive codes are only applicable if a local government chooses to adopt and enforce one or more of these codes.”
    • Partial — Georgia permissive state construction codes, including the Disaster Resilient Building Code IBC Appendix, Disaster Resilient Building Code IRC Appendix, International Property Maintenance Code, International Existing Building Code, and National Green Building Standard.
      “The remaining codes are referred to as permissive codes. Unlike the mandatory codes, in order for a local government to enforce one or more of these permissive codes, that code or codes must be adopted, either by ordinance or resolution, by the local jurisdiction. A copy of the ordinance or resolution adopted must be forwarded to DCA (O.C.G.A. Section 8-2-25 (b)).”
    • Partial — Georgia construction, including residential construction, under the statewide State Minimum Standard Codes framework.
      “The mandatory codes are applicable to all construction whether or not they are locally enforced and the permissive codes are only applicable if a local government chooses to adopt and enforce one or more of these codes.”
    • Adopted — Georgia construction, including residential construction in unincorporated county areas.
      “The mandatory codes are applicable to all construction whether or not they are locally enforced”
  • InspectionsLimited

    Inspection and enforcement of state minimum standard construction codes by Georgia local governments.

    • Local governments must adopt reasonable administrative provisions to administer and enforce the state minimum standard codes.
    • Those provisions should include procedures for code enforcement, hearings, appeals from local inspectors, and other procedures necessary for local administration and enforcement.
    • Local-government enforcement powers include inspecting buildings and other structures to ensure code compliance.
    • If a local government chooses to locally enforce any state minimum code, it must enforce the latest editions and DCA-adopted amendments.
    • Local amendments must satisfy the Uniform Codes Act requirements, including that requirements cannot be less stringent than the state minimum code and proposed amendments must be submitted to DCA 60 days before proposed adoption.
    “Inspecting buildings and other structures to ensure compliance with the code;”
  • Certificate of occupancyLimited

    Certificate-of-occupancy issuance for Georgia construction projects where the applicable county or municipality requires or administers one.

    • Only a local governing authority may issue a certificate of occupancy.
    • Inspections may be necessary or required for issuance according to the governing authority's requirements.
    • The cited state materials do not establish a certificate-of-occupancy requirement for every building statewide.
    “Only a local governing authority shall be authorized to issue a certificate of occupancy.”
  • Tiny homesLimited

    Site-built or modular tiny homes used as single-family dwelling units in Georgia.

    • Tiny homes that are modular dwellings or site-built dwellings are subject to the applicable Georgia building codes.
    • A tiny home must be approved for siting by the applicable local government; local zoning controls land use, location, height, width, foundation type, stories, and minimum lot or building size.
    • The 2020 Georgia IRC Appendix Q tiny-house provisions are not mandatory unless specifically referenced in the adopted local ordinance.
    • This claim does not establish statewide permission for RV-based or manufactured-home tiny homes, which are subject to different standards.

    tiny house floor area: <= 400 square feet or less, excluding lofts · minimum habitable room size referenced in Georgia amendment: >= 70 square feet (source fact sheet describes the 2012 IRC amendment; current local adoption and code edition must be confirmed)

    “Tiny homes are dwelling units and therefore they are subject to the same building code regulations as any other traditional site-built or stick-built home.”
  • Manufactured homesLimited

    Occupancy of manufactured homes installed in Georgia.

    • The home must qualify as a manufactured dwelling unit and satisfy applicable HUD standards.
    • A licensed installer must obtain the Georgia installation permit for each new or pre-owned manufactured home.
    • The installation must comply with state manufactured-housing rules, including inspection and reporting requirements before release of the completed home set for occupancy.
    • Local zoning, siting, utility, and other lawful local requirements may still affect whether a particular parcel may contain the home.

    minimum manufactured-home size: >= 320 square feet · manufactured-home installation permit fee: 60 USD per home · installation report deadline: 3 business days before completion and release for occupancy

    “Installers must purchase a permit from the Insurance and Safety Fire Commissioner's Office for each new or pre-owned manufactured home installed in Georgia.”
  • Septic inspectionRequired

    New onsite sewage management systems and repairs in Georgia, including Putnam County.

    • The program covers regulation and inspection of new systems and inspection of repairs to improperly functioning systems.
    • Locally related inspections are handled through county environmental health offices.
    “Regulation and inspection of new on-site sewage management systems (septic tanks/field lines). Investigation and inspection of repairs made to improperly functioning on-site sewage management systems.”
    One more reviewed finding on this topic
  • Off-grid sanitationLimited

    Off-grid sanitation using privies, approved alternative onsite sewage systems, or certified composting toilets in Georgia.

    • Privies must meet the Manual's minimum design and construction criteria.
    • Alternative onsite sewage systems must be approved by the Department and meet the Manual's minimum design and construction criteria.
    • Composting toilets must be certified by the National Sanitation Foundation to current Standard 41 or certified by the manufacturer as meeting a nationally recognized standard.
    • Applicable County Board of Health permits and inspections remain required where the system is an onsite sewage management system.
    “composting toilets may be considered”
  • Well permitLimited

    Domestic and other water-well construction in Georgia.

    • All water wells must comply with the Water Well Standards Act.
    • A water-well contractor must contact the local county health department in advance for site review.
    • Certain county health departments require a well-construction permit before construction.
    • Agricultural irrigation wells require a Letter of Concurrence before drilling begins.
    • Well Construction Data must be sent to the owner and local health department within 30 days after completion.

    well construction data submission deadline: <= 30 days after completion

    “certain county health departments require well construction permits prior to well construction”
  • Mandatory utility hookupSewer (with conditions)

    Buildings, residences, and properties designed or intended for human occupancy or congregation in Georgia when a public or community sewage treatment system is available.

    • Connection is required when a public or community sewage treatment system is available within 200 feet of the property line or in a public right-of-way abutting the property.
    • If an existing onsite sewage system fails, immediate connection to a public or community sewerage system is required if such a system is available.
    • If a public or community sewage treatment system is to be constructed, an existing public or community sewer is to be extended to serve a lot, or an approved onsite sewage management system is to be used, the building sewer must be installed to ensure gravity flow at a self-cleaning velocity throughout.
    • A residential onsite sewage system of less than 2,000 gallons per day that is failing may be exempted from connecting to sewer if repair or replacement meets the Manual for Onsite Sewage Management Systems criteria and the County Board of Health determines that sufficient area and usable soils exist.

    sewer availability distance: <= 200 feet from property line (A public right-of-way abutting the property is an alternative availability condition.) · failing residential onsite sewage system flow: < 2000 gallons per day (The County Board of Health must determine sufficient area and usable soils, and repair or replacement must meet the Manual for Onsite Sewage Management Systems criteria.)

    “Connection shall be made to a public or community sewage treatment system if such system is available within two hundred feet (200') of the property line, or available in a public right-of-way abutting the property. [...] If an existing on-site sewage system fails, immediate connection shall be made to a public or community sewerage system if such a system is available. (b) A residential on-site sewage system of less than two thousand gallons per day that is failing may be exempted from connecting to sewer if the repair or replacement of the system will meet the criteria set forth in the Manual for Onsite Sewage Management Systems and has sufficient area and usable soils as determined by the County Board of Health.”
  • Agricultural exemptionAvailable (with conditions)

    Bona fide agricultural and/or timber property qualifying for Georgia conservation-use current-use assessment.

    • The property must be devoted to a qualifying conservation use.
    • The property must be maintained in a qualifying use for ten years.
    • The owner must file the application with the county board of tax assessors by the county deadline for filing ad valorem tax returns.
    • This is a property-tax assessment benefit and does not itself establish an exemption from local zoning or building regulations.

    assessment basis: 40 percent of current use value · minimum covenant period: >= 10 years

    “Real property that is devoted to bona fide conservation uses is assessed at 40% of its current use value.”
    2 more reviewed findings on this topic
    • Available (with conditions) — Farm buildings or structures qualifying under Georgia law for exemption from the state minimum standard building codes.
      “exempts such buildings from the state minimum standard building codes.”
    • Available (with conditions) — Crop-management and animal-husbandry practices involved in producing agricultural or farm products on private property in Georgia.
      “regulating crop management or animal husbandry practices involved in the production of agricultural or farm products on any private property.”
  • Driveway accessRequired

    Construction or non-routine maintenance involving driveways or other permit work within a Georgia State Highway Right-of-Way.

    • Applications must be made at the appropriate GDOT District office.
    • Commercial driveway applications go to the District Traffic Operations Office.
    • Residential driveway and temporary-use driveway applications go to the District Area Office.
    • The applicant must be the property owner, lessor, or authorized representative of the entity owning or leasing the abutting property; lease and written-authorization conditions apply as stated in the manual.
    • Commercial or special encroachment applications may also be submitted through GPAS AMPS.
    “A permit is required prior to performing any construction work or non-routine maintenance within the State Highway Right-of-Way.”
  • Building in a floodplainLimited

    Development in flood-prone areas in Georgia communities participating in the National Flood Insurance Program.

    • NFIP participation is voluntary.
    • Floodplain management ordinances are administered by the communities, not uniformly by the state.
    • Georgia EPD recommends model ordinances for participating communities; proposed ordinances are to be populated with community-specific information and locally adopted.
    • The parcel-specific floodplain status and applicable local ordinance were not determined.
    “The maps and products are used by the communities to administer their floodplain management ordinances.”
  • Permit processPartial

    Administration and enforcement of state minimum standard construction codes in Georgia.

    • Local governments must adopt reasonable administrative provisions to administer and enforce the state minimum standard codes.
    • Local enforcement procedures may include inspections, permits, hearings, appeals, and local code-enforcement arrangements.
    • If a local government chooses to enforce a state code, it must enforce the latest editions and DCA amendments.
    “local governments must adopt reasonable administrative provisions.”
  • county zoning authorityGeneral

    Georgia counties exercising zoning power over unincorporated areas within their territorial boundaries.

    • The Zoning Procedures Law confirms local-government zoning authority generally; it does not require a local government to exercise zoning power.
    • For counties, territorial boundaries are the unincorporated areas and certain areas defined in O.C.G.A. § 36-70-2(5.1).
    • County zoning ordinances and zoning decisions remain subject to the statutory minimum procedures, including public-hearing and notice requirements.
    • The statute defines zoning to include districting property for various uses, prohibiting other uses within zones or districts, and regulating development and improvement of real estate within those zones or districts.
    “While recognizing and confirming the authority of local governments to exercise zoning power within their respective territorial boundaries [...] “Local government” means any county or municipality”
  • county building authorityGeneral

    Georgia counties administering and enforcing state minimum construction codes, including residential construction in unincorporated areas.

    • Local governments must adopt reasonable administrative provisions for administering and enforcing state minimum standard codes.
    • Those administrative powers include inspecting buildings, employing inspectors and other personnel, requiring permits and establishing permit charges, and contracting with other local governments for code enforcement.
    • A local government may choose which mandatory state codes it locally enforces, but any mandatory code locally enforced must use the latest edition and DCA amendments.
    • Local amendments may not be less stringent than the state minimum code, must be based on local climatic, geologic, topographic, or public-safety factors, require legislative findings identifying the need, and must be submitted to DCA 60 days before proposed adoption.
    • Local amendments must be filed with DCA after adoption.
    “These powers include: [...] Requiring permits and to establishment charges for said permits; and Contracting with other local governments for code enforcement.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission — ask the county directly.

  • Minimum dwelling size — Minimum dwelling size in Putnam County.
  • Minimum lot size — Minimum lot size in Putnam County.
  • Setbacks — Setbacks in Putnam County.
  • Lot coverage — Lot coverage in Putnam County.
  • Building height — Building height in Putnam County.
4 more unanswered
  • Living in an RV
  • Camping on your land
  • Accessory dwellings
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Living off-grid in Putnam County, Georgia

Is Putnam County a good place to live off-grid or homestead?

Putnam County scores 64/100 on the Bolthole Index, a strong county profile. Its strengths: manageable long-term carry cost and workable self-sufficiency basics: 46.7″/yr rainfall and 78.5% wooded land.

Do you need a building permit in Putnam County, Georgia?

Putnam County generally requires a residential building permit, and it enforces county zoning. Onsite septic is permitted by Putnam County Environmental Health Department (North Central Health District, Georgia DPH). Owner-builders may act as their own contractor to build their home. These answers are quoted from official sources and independently re-checked. Rules change and cities within the county differ — always confirm with the county before you buy or build.

How much does land cost in Putnam County, Georgia?

Land in Putnam County runs about $4,713 per acre, based on the latest county data.

What is the water situation in Putnam County?

Putnam County gets about 46.7" of rain a year, with severe drought in roughly 15.8% of years.

How remote is Putnam County?

A representative private-land location has about 20,853 people within a 30-minute drive and 7,503,791 within two hours. The road-network catchments count population across county lines and clusters of smaller cities; straight-line radius values remain available as a comparison.

Off-grid gear

Going off-grid in Putnam County means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

How Putnam compares in Georgia

Compare side-by-side →See all 159 Georgia counties ranked →